OLR-86-2-EPTU-MEM-0001

Memorandum

OLRT Project

Revision 03

Date March 21, 2014

Owner:R.Schmidt

Technical Director

MEMORANDUM
DocumentNo. DepartmentNo: Date: From: To: Subject: OLR862EPTUMEM0001 TechnicalMemo 21thMarch2014 RogerSchmidt,TechnicalDirector DavidWhyte,ProjectDirector ResumingTunnelingatEastPortal

ThistechnicalmemohasbeenpreparedinresponsetotheCitysrequestforasummaryofthe eventsofFebruary2021,2014,itsrootcauseandthepathforwardfromatechnical perspective. Summaryofevents Thesinkholeeventwas,ascouldbesurmised,unexpected.OttawaLightRailTransit Constructors(OLRTC)hadnoindicationsofconcern,andnonoteddeviationsfrompracticeprior totheevent.Miningoperationswereproceedingaccordingtoapprovedplansanddrawings. Dailyrecordsconfirmedthatgeotechnicalconditionscloselymatchedgeotechnicalassumptions. Yet,atabout09:40pmonFebruary20th,theminingcrewnoticedexcessivelooseandwet materialstarttofall,betweenthetunnelsupportpipes,fromtheleftsideareaofthetunnel crownontothetunnelfloor.Thismaterialcontinuetoingressand,despiteeffortstostabilizeit frombelow,onlystabilizedafterasinkholedeveloped.Adjacentroadwayswereassessedand, at10pm,crewsclosedWallerStreetnearLauriertolocalvehicularaccess.Atabout1:00amon February21stthesinkholereachedthesurfaceinanOLRTCworkzoneonWallerStreet. DamagefromthesinkholewaslimitedtotheCityutilities(sewerandtrafficsignals)thatcrossed its path. Extensive monitoring points OLRTC have in the area have confirmed that no building settlement of concern occurred. OLRTC via the applicable Engineers of Record provided technical guidance during the stabilization exercise and the safety report confirms that no workers or other persons were injured as a result of this event. OLRTC crews worked together withtheCity tomanage thetrafficandtransiteffects andby2:00amonFebruary22OLRTC had stabilizedandbackfilledthesinkhole. Rootcause Sincethestabilization,OLRTChasreviewedallpertinentdataandpreparedarootcause technicalanalysisreport.Thereportconfirmsdocumentedprocedureswerefollowed, appropriatematerialswereused,prescribedsupportingmeasureswereinplaceandtherewere nononconformancesofpractice. Thereportdoesidentifythatthetunnelcrossedbeneathapreviouslyexcavatedconstructionpit thatwasdeeperthantheknownutilitiesandlikelyextendedfrombedrocktothesurface.The
OLRT This document may contain confidential and commercially sensitive information. 1600 Carling Avenue, Suite 450, PO Box 20, Ottawa, ON K1Z 1G3 Page 1 of 2

WALLS AND CELING REINFORCED WITH CONCRETE LINING (SHOTCRETE) 1st PIPE UMBRELLA (PRESUPPORT FOR TUNNEL)

NON NATIVE SOIL FROM PREVIOUS EXCAVATION LAURIER AVENUE 2 ! PIPE UMBRELLA

TUNNEL PROFILE PROJECTION

EAST PORTAL
TUNNEL

OVERBURDEN SOIL

2 METERS MINIMUM

STAGE 1 CONDITIONS - EARL& FEB 2'( 2'1)


PRIOR TO INCIDENT

ROCK

NORTH

SINK HOLE

LAURIER AVENUE

EAST PORTAL
TUNNEL

OVERBURDEN SOIL

STAGE 2 CONDITIONS - LATE FEB 2'( 2'1)


SINK HOLE DEVELOPS

ROCK

NORTH

CONCRETE "PLUG" STABILI#ED ROCK FILL

LAURIER AVENUE

EAST PORTAL
TUNNEL

OVERBURDEN SOIL

STAGE $ CONDITIONS - LATE FEB 21( 2'1)


CONCRETE PLUG IN PLACE

ROCK

NORTH

LAURIER AVENUE NEW $%! PIPE UMBRELLA THROUGH CONCRETE

TUNNEL PROFILE PROJECTION

EAST PORTAL
TUNNEL

OVERBURDEN SOIL

STAGE ) PLAN - MARCH 2'1)


PHASED ADVANCEMENT

ROCK STREET LEVEL

SECTION LOOKING NORTH

OVERBURDEN SOIL

NORTH
NEW $%! PIPE UMBRELLA EXISTING 2 ! PIPE UMBRELLA

ROCK

TUNNEL PROFILE