Inspection Findings, Anomalies & Recommendations Summary Report CLIENT's Scope of Work Name

Rating : 1 - Bad
Priority: A - Immediate Attention B - Within 3 months

2 - Poor

3 - Moderate

4 - Good
E - Little or No Attention

C - Within 6 months
Rating Coating Structural

D - Between 12 to 18 months
Recommendations Priority Coating
Structural

Item No.

Unit

Component Inspected

Inspection Findings/Anomalies Coating Structural

Anomaly #

PHOTO / ANOMALY

Coating

Structural

Date Inspected:

Page of 7

CLIENT
Inspection Findings, Anomalies & Recommendations Summary Report CLIENT's Scope of Work Name

Rating : 1 - Bad
Priority: A - Immediate Attention B - Within 3 months

2 - Poor

3 - Moderate

4 - Good
E - Little or No Attention

C - Within 6 months
Rating Coating Structural

D - Between 12 to 18 months
Recommendations Priority Coating
Structural

Item No.

Unit

Component Inspected

Inspection Findings/Anomalies Coating Structural

Anomaly #

PHOTO / ANOMALY

Coating
Clean, de-scale, inspect and recoat affected areas with Powergen approved coating system

Structural

GT 3 & 4 Manifold GT4

Valve

Approximately 75% coating failure noted

There are a few areas of moderate localized corrosion noted on the valve body and some moderate to heavy scaling observed on the top

De-scale and recoat

GT 3 & 4 Manifold GT4

6" Flanged

Connection

100% coating failure

Heavily corroded flanged connection with severe metal loss and missing bolts

Clean, de-scale, inspect and Before this recoat affected system goes into areas with service, these Powergen flanges should approved coating be replaced system

GT 3

4" Piping

Approximately 70% coating failure overall with moderate to heavy moss build up on the line on the underside and throughout in several areas

Slight corrosion in areas of coating failure

Clean, de-scale, inspect and recoat affected De-scale and areas with recoat Powergen approved coating system

Date Inspected:

Page of 7

CLIENT
Inspection Findings, Anomalies & Recommendations Summary Report CLIENT's Scope of Work Name

Rating : 1 - Bad
Priority: A - Immediate Attention B - Within 3 months

2 - Poor

3 - Moderate

4 - Good
E - Little or No Attention

C - Within 6 months
Rating Coating Structural

D - Between 12 to 18 months
Recommendations Priority Coating
Structural

Item No.

Unit

Component Inspected

Inspection Findings/Anomalies Coating Structural

Anomaly #

PHOTO / ANOMALY

Coating

Structural

10

GT 3

4" Flanges

Approximately 75% coating failure noted

Moderate to heavy scaling with metal loss at underside edges of the flanges, in between the flanged connections and around the bolt heads at one flange

Clean, de-scale, inspect and De-scale, rerecoat affected inspect, and areas with once acceptable, Powergen recoat. approved coating system

10

11

GT 3

Instrument Support

Moderate corrosion with flaking of Approximately 25% coating failure metal on the underside edges of the clamp of the instrument support

Clean, de-scale, inspect and Remove clamp, recoat affected de-scale, recoat areas with and replace Powergen support approved coating system

11

Date Inspected:

Page of 7

CLIENT
Inspection Findings, Anomalies & Recommendations Summary Report CLIENT's Scope of Work Name

Rating : 1 - Bad
Priority: A - Immediate Attention B - Within 3 months

2 - Poor

3 - Moderate

4 - Good
E - Little or No Attention

C - Within 6 months
Rating Coating Structural

D - Between 12 to 18 months
Recommendations Priority Coating
Structural

Item No.

Unit

Component Inspected

Inspection Findings/Anomalies Coating Structural

Anomaly #

PHOTO / ANOMALY

Coating

Structural

12

GT 4

4" Piping System

Generally, the entire system is with approximately 85% coating failure At areas of failed coating, there is a including isolated areas of flaking presence of light corrosion and heavy moss growth underside piping throughout

Clean, de-scale, Clean off inspect and underside and recoat affected other areas free areas with of moss. Clean, Powergen de-scale and approved coating recoat system

12

Date Inspected:

Page of 7

CLIENT
Inspection Findings, Anomalies & Recommendations Summary Report CLIENT's Scope of Work Name

Rating : 1 - Bad
Priority: A - Immediate Attention B - Within 3 months

2 - Poor

3 - Moderate

4 - Good
E - Little or No Attention

C - Within 6 months
Rating Coating Structural

D - Between 12 to 18 months
Recommendations Priority Coating
Structural

Item No.

Unit

Component Inspected

Inspection Findings/Anomalies Coating Structural

Anomaly #

PHOTO / ANOMALY

Coating

Structural

13

GT 4

Piping Support

Piping supports are with approximately 40% coating failure overall

The most northern pipe support is heavily corroded at the area just under the support plate. On the 2 most northern supports, there is evidence of movement noted from the failed coating on the piping

De-scale pipe support and Clean, de-scale, inspect the inspect and heavily corroded recoat affected area's integrity. areas with Renew the Powergen section if need approved coating be and recoat system with Powergen approved coating system

13

14

GT 4

4" Flanged Connections

100% coating failure

Heavy scaling observed around the nuts

Clean, descale, inspect and recoat affected areas with Powergen approved coating system

De-scale, inspect and recoat

14

15

GT 4

1 " Valve

Approximately 85% coating failure on the flanged connections of this valve

Deteriorated valve packing noted

Clean, de-scale, Change out inspect and packing at next recoat affected carded areas (excluding turnaround, but flange gasket monitor valve seating area) gasket with Powergen meanwhile approved coating through annual system inspections

15

Date Inspected:

Page of 7

CLIENT
Inspection Findings, Anomalies & Recommendations Summary Report CLIENT's Scope of Work Name

Rating : 1 - Bad
Priority: A - Immediate Attention B - Within 3 months

2 - Poor

3 - Moderate

4 - Good
E - Little or No Attention

C - Within 6 months
Rating Coating Structural

D - Between 12 to 18 months
Recommendations Priority Coating
Structural

Item No.

Unit

Component Inspected

Inspection Findings/Anomalies Coating Structural

Anomaly #

PHOTO / ANOMALY

Coating

Structural

16

GT 5

There are numerous areas of coating failure noted throughout the system such as runs, sags, "fish eyes", mechanical damage and failure due to contaminated Underside of piping exhibits slight surfaces. Newly coated areas corrosion developing due to Entire Piping System exhibit many symptoms of poor poor/lack of coating coverage and preparation and application of the presence of moisture. coating techniques. Underside of almost all the piping has moss buildup (with corrosion) due to condensate presence.

Clean free of moss and all Clean free of contaminants, de- moss and all scale and recoat contaminants, deto Powergen scale, inspect approved coating and recoat system

16

17

GT 5

Piping Support

Evidence shows that the pipe supports were not removed to recoat the piping

Crevice corrosion is noted at some of the contact areas between the piping and piping support as well as at some of the areas where is visible at the clamps

Remove clamp, clean, de-scale Remove clamp, and recoat as clean, de-scale, per Powergen inspect and approved coating recoat system

17

18

GT 5

18

Date Inspected:

Page of 7

CLIENT
Inspection Findings, Anomalies & Recommendations Summary Report CLIENT's Scope of Work Name

Rating : 1 - Bad
Priority: A - Immediate Attention B - Within 3 months

2 - Poor

3 - Moderate

4 - Good
E - Little or No Attention

C - Within 6 months
Rating Coating Structural

D - Between 12 to 18 months
Recommendations Priority Coating
Structural

Item No.

Unit

Component Inspected

Inspection Findings/Anomalies Coating Structural

Anomaly #

PHOTO / ANOMALY

Coating

Structural

19

GT 5

19

20

GT 5

20

20

GT 5

21

Date Inspected:

Page of 7