Вы находитесь на странице: 1из 33

OPHIR RESIDENCES

Designed by: FIS Title: Overcrossing Pipe Drainage Check Checked by:

Job No.: 5824656 Date :

Design base on the Code of Practice on Surface Water Drainage 2011 Computation of Peak Runoff Assumptions: 1) Return period of 10 years 2) Time of concentration = 5 mins Qr = 1/360 C.I.A C = runoff coefficient(ref: table1) I = average rainfall intensity(mm/hr) A = Catchment area(hectares) Qr = 1 220 3000 0.18333 183.33 0.00 183.33 Value of C 1.0 0.9 0.8 0.65 0.45

Rational Formula: Where

enter in Sq.m

peak runoff at the point of design(m3/s)= (l/s)= Additional flow from RO Break Tank (l/s)= Total design flow rate (l/s)=

Table 1.0 Characteristics of catchement when fully developed Roads, highways, airport runways, paved up areas Urban areas fully and closely built up Residential/industrialareas densely built up Residential/industrial areas not densely built up and rural areas. Rural areas with fish ponds and vegetable gardens Note: For Catchment with composite land use or surface chracteristics, a weighed value of C may be adopted. Proposed Drain Size : Manning Formula: Where n= A= R= P= S= 0.75 x 0.917 m deep

Qc = 1/n * A * R2/3 * S1/2 Roughness coefficient (From Table 1.0 below) Flow area (m2) A/P = Hydraulic radius (m) wetted perimetter (m) bed gradient (m3/s)= (l/s)= (l/s)= = 0.015 = 0.584588 = 0.253189 = 2.31 1/300 = 0.003333 0.90052 900.52 183.33 OK

Qc = Discharge capacity of drain

Qr = Required Discharge capacity of drain

Table 1.0 Boundary Condition Concrete Brick Earth Earth with stones and weed Gravel Note: Where there are different flow surfaces with a drain section equivalent roughness coefficient may be used. Required Drain Size for Qc to reach Qr 0.75 A= R= P= Qc = Roughness Coefficient 0.015 0.017 0.027 0.035 0.03

0.273

m deep = = = = = 0.174 0.143 1.214 0.183 1.05 m/s (OK)

Flow Area (m2) A/P = Hydraulic radius (m) wetted perimetter (m) Discharge capacity of drain (m3/s)

v= Water Velocity = Qc / A (Minimum water velocity is 1 m/s and maximum water velocity is 3 m/s)

OPHIR RESIDENCES
Designed by: Title: DRAIN A EDI Checked by:

Job No.:

Date :

Design base on the Code of Practice on Surface Water Drainage 2011 Computation of Peak Runoff Assumptions: 1) Return period of 10 years 2) Time of concentration = 5 mins Qr = 1/360 C.I.A C = runoff coefficient(ref: table1) I = average rainfall intensity(mm/hr) A = Catchment area(hectares) Qr = 1 220 10600 0.64778 647.78 0.00 647.78 Value of C 1.0 0.9 0.8 0.65 0.45

Rational Formula: Where

enter in Sq.m

peak runoff at the point of design(m3/s)= (l/s)= Additional flow from RO Break Tank (l/s)= Total design flow rate (l/s)=

Table 1.0 Characteristics of catchement when fully developed Roads, highways, airport runways, paved up areas Urban areas fully and closely built up Residential/industrialareas densely built up Residential/industrial areas not densely built up and rural areas. Rural areas with fish ponds and vegetable gardens Note: For Catchment with composite land use or surface chracteristics, a weighed value of C may be adopted. Proposed Drain Size : Manning Formula: Where n= A= R= P= S= 0.75 x 0.703 m deep

Qc = 1/n * A * R2/3 * S1/2 Roughness coefficient (From Table 1.0 below) Flow area (m2) A/P = Hydraulic radius (m) wetted perimetter (m) bed gradient (m3/s)= (l/s)= (l/s)= = 0.015 = 0.448163 = 0.230406 = 1.95 1/300 = 0.003333 0.64830 648.30 647.78 OK

Qc = Discharge capacity of drain

Qr = Required Discharge capacity of drain

Table 1.0 Boundary Condition Concrete Brick Earth Earth with stones and weed Gravel Note: Where there are different flow surfaces with a drain section equivalent roughness coefficient may be used. Required Drain Size for Qc to reach Qr 0.75 A= R= P= Qc = Roughness Coefficient 0.015 0.017 0.027 0.035 0.03

0.703

m deep = = = = = 0.448 0.230 1.945 0.648 1.45 m/s (OK)

Flow Area (m2) A/P = Hydraulic radius (m) wetted perimetter (m) Discharge capacity of drain (m3/s)

v= Water Velocity = Qc / A (Minimum water velocity is 1 m/s and maximum water velocity is 3 m/s)

OPHIR RESIDENCES
Designed by: Title: DRAIN A EDI Checked by:

Job No.:

Date :

Design base on the Code of Practice on Surface Water Drainage 2011 Computation of Peak Runoff Assumptions: 1) Return period of 10 years 2) Time of concentration = 5 mins Qr = 1/360 C.I.A C = runoff coefficient(ref: table1) I = average rainfall intensity(mm/hr) A = Catchment area(hectares) Qr = 1 220 15273 0.93335 933.35 0.00 933.35 Value of C 1.0 0.9 0.8 0.65 0.45

Rational Formula: Where

enter in Sq.m

peak runoff at the point of design(m3/s)= (l/s)= Additional flow from RO Break Tank (l/s)= Total design flow rate (l/s)=

Table 1.0 Characteristics of catchement when fully developed Roads, highways, airport runways, paved up areas Urban areas fully and closely built up Residential/industrialareas densely built up Residential/industrial areas not densely built up and rural areas. Rural areas with fish ponds and vegetable gardens Note: For Catchment with composite land use or surface chracteristics, a weighed value of C may be adopted. Proposed Drain Size : Manning Formula: Where n= A= R= P= S= 0.75 x 1.923 m deep

Qc = 1/n * A * R2/3 * S1/2 Roughness coefficient (From Table 1.0 below) Flow area (m2) A/P = Hydraulic radius (m) wetted perimetter (m) bed gradient (m3/s)= (l/s)= (l/s)= = 0.015 = 1.225913 = 0.305022 = 4.02 1/318 = 0.003145 2.07671 2076.71 933.35 OK

Qc = Discharge capacity of drain

Qr = Required Discharge capacity of drain

Table 1.0 Boundary Condition Concrete Brick Earth Earth with stones and weed Gravel Note: Where there are different flow surfaces with a drain section equivalent roughness coefficient may be used. Required Drain Size for Qc to reach Qr 0.75 A= R= P= Qc = Roughness Coefficient 0.015 0.017 0.027 0.035 0.03

0.967

m deep = = = = = 0.616 0.258 2.394 0.933 1.51 m/s (OK)

Flow Area (m2) A/P = Hydraulic radius (m) wetted perimetter (m) Discharge capacity of drain (m3/s)

v= Water Velocity = Qc / A (Minimum water velocity is 1 m/s and maximum water velocity is 3 m/s)

OPHIR RESIDENCES
Designed by: Title: DRAIN A EDI Checked by:

Job No.:

Date :

Design base on the Code of Practice on Surface Water Drainage 2011 Computation of Peak Runoff Assumptions: 1) Return period of 10 years 2) Time of concentration = 5 mins Qr = 1/360 C.I.A C = runoff coefficient(ref: table1) I = average rainfall intensity(mm/hr) A = Catchment area(hectares) Qr = 1 220 21510 1.31450 1314.50 0.00 1314.50 Value of C 1.0 0.9 0.8 0.65 0.45

Rational Formula: Where

enter in Sq.m

peak runoff at the point of design(m3/s)= (l/s)= Additional flow from RO Break Tank (l/s)= Total design flow rate (l/s)=

Table 1.0 Characteristics of catchement when fully developed Roads, highways, airport runways, paved up areas Urban areas fully and closely built up Residential/industrialareas densely built up Residential/industrial areas not densely built up and rural areas. Rural areas with fish ponds and vegetable gardens Note: For Catchment with composite land use or surface chracteristics, a weighed value of C may be adopted. Proposed Drain Size : Manning Formula: Where n= A= R= P= S= 0.75 x 2.27 m deep

Qc = 1/n * A * R2/3 * S1/2 Roughness coefficient (From Table 1.0 below) Flow area (m2) A/P = Hydraulic radius (m) wetted perimetter (m) bed gradient (m3/s)= (l/s)= (l/s)= = 0.015 = 1.447125 = 0.313978 = 4.61 1/318 = 0.003145 2.49920 2499.20 1314.50 OK

Qc = Discharge capacity of drain

Qr = Required Discharge capacity of drain

Table 1.0 Boundary Condition Concrete Brick Earth Earth with stones and weed Gravel Note: Where there are different flow surfaces with a drain section equivalent roughness coefficient may be used. Required Drain Size for Qc to reach Qr 0.75 A= R= P= Qc = Roughness Coefficient 0.015 0.017 0.027 0.035 0.03

1.290

m deep = = = = = 0.822 0.279 2.943 1.314 1.60 m/s (OK)

Flow Area (m2) A/P = Hydraulic radius (m) wetted perimetter (m) Discharge capacity of drain (m3/s)

v= Water Velocity = Qc / A (Minimum water velocity is 1 m/s and maximum water velocity is 3 m/s)

OPHIR RESIDENCES
Designed by: Title: DRAIN D EDI Checked by:

Job No.:

Date :

Design base on the Code of Practice on Surface Water Drainage 2011 Computation of Peak Runoff Assumptions: 1) Return period of 10 years 2) Time of concentration = 5 mins Qr = 1/360 C.I.A C = runoff coefficient(ref: table1) I = average rainfall intensity(mm/hr) A = Catchment area(hectares) Qr = 1 220 22835 1.39547 1395.47 0.00 1395.47 Value of C 1.0 0.9 0.8 0.65 0.45

Rational Formula: Where

enter in Sq.m

peak runoff at the point of design(m3/s)= (l/s)= Additional flow from RO Break Tank (l/s)= Total design flow rate (l/s)=

Table 1.0 Characteristics of catchement when fully developed Roads, highways, airport runways, paved up areas Urban areas fully and closely built up Residential/industrialareas densely built up Residential/industrial areas not densely built up and rural areas. Rural areas with fish ponds and vegetable gardens Note: For Catchment with composite land use or surface chracteristics, a weighed value of C may be adopted. Proposed Drain Size : Manning Formula: Where n= A= R= P= S= 0.9 x 2.291 m deep

Qc = 1/n * A * R2/3 * S1/2 Roughness coefficient (From Table 1.0 below) Flow area (m2) A/P = Hydraulic radius (m) wetted perimetter (m) bed gradient (m3/s)= (l/s)= (l/s)= = 0.015 = 1.752615 = 0.365532 = 4.79 1/318 = 0.003145 3.34964 3349.64 1395.47 OK

Qc = Discharge capacity of drain

Qr = Required Discharge capacity of drain

Table 1.0 Boundary Condition Concrete Brick Earth Earth with stones and weed Gravel Note: Where there are different flow surfaces with a drain section equivalent roughness coefficient may be used. Required Drain Size for Qc to reach Qr 0.9 A= R= P= Qc = Roughness Coefficient 0.015 0.017 0.027 0.035 0.03

1.083

m deep = = = = = 0.828 0.302 2.741 1.395 1.68 m/s (OK)

Flow Area (m2) A/P = Hydraulic radius (m) wetted perimetter (m) Discharge capacity of drain (m3/s)

v= Water Velocity = Qc / A (Minimum water velocity is 1 m/s and maximum water velocity is 3 m/s)

OPHIR RESIDENCES
Designed by: Title: DRAIN B EDI Checked by:

Job No.:

Date :

Design base on the Code of Practice on Surface Water Drainage 2011 Computation of Peak Runoff Assumptions: 1) Return period of 10 years 2) Time of concentration = 5 mins Qr = 1/360 C.I.A C = runoff coefficient(ref: table1) I = average rainfall intensity(mm/hr) A = Catchment area(hectares) Qr = 1 220 33000 2.01667 2016.67 0.00 2016.67 Value of C 1.0 0.9 0.8 0.65 0.45

Rational Formula: Where

enter in Sq.m

peak runoff at the point of design(m3/s)= (l/s)= Additional flow from RO Break Tank (l/s)= Total design flow rate (l/s)=

Table 1.0 Characteristics of catchement when fully developed Roads, highways, airport runways, paved up areas Urban areas fully and closely built up Residential/industrialareas densely built up Residential/industrial areas not densely built up and rural areas. Rural areas with fish ponds and vegetable gardens Note: For Catchment with composite land use or surface chracteristics, a weighed value of C may be adopted. Proposed Drain Size : Manning Formula: Where n= A= R= P= S= 0.9 x 1.495 m deep

Qc = 1/n * A * R2/3 * S1/2 Roughness coefficient (From Table 1.0 below) Flow area (m2) A/P = Hydraulic radius (m) wetted perimetter (m) bed gradient (m3/s)= (l/s)= (l/s)= = 0.015 = 1.143675 = 0.332319 = 3.44 1/318 = 0.003145 2.05132 2051.32 2016.67 OK

Qc = Discharge capacity of drain

Qr = Required Discharge capacity of drain

Table 1.0 Boundary Condition Concrete Brick Earth Earth with stones and weed Gravel Note: Where there are different flow surfaces with a drain section equivalent roughness coefficient may be used. Required Drain Size for Qc to reach Qr 0.9 A= R= P= Qc = Roughness Coefficient 0.015 0.017 0.027 0.035 0.03

1.473

m deep = = = = = 1.127 0.331 3.404 2.016 1.79 m/s (OK)

Flow Area (m2) A/P = Hydraulic radius (m) wetted perimetter (m) Discharge capacity of drain (m3/s)

v= Water Velocity = Qc / A (Minimum water velocity is 1 m/s and maximum water velocity is 3 m/s)

OPHIR RESIDENCES
Designed by: Title: DRAIN B EDI Checked by:

Job No.:

Date :

Design base on the Code of Practice on Surface Water Drainage 2011 Computation of Peak Runoff Assumptions: 1) Return period of 10 years 2) Time of concentration = 5 mins Qr = 1/360 C.I.A C = runoff coefficient(ref: table1) I = average rainfall intensity(mm/hr) A = Catchment area(hectares) Qr = 1 220 37094 2.26686 2266.86 0.00 2266.86 Value of C 1.0 0.9 0.8 0.65 0.45

Rational Formula: Where

enter in Sq.m

peak runoff at the point of design(m3/s)= (l/s)= Additional flow from RO Break Tank (l/s)= Total design flow rate (l/s)=

Table 1.0 Characteristics of catchement when fully developed Roads, highways, airport runways, paved up areas Urban areas fully and closely built up Residential/industrialareas densely built up Residential/industrial areas not densely built up and rural areas. Rural areas with fish ponds and vegetable gardens Note: For Catchment with composite land use or surface chracteristics, a weighed value of C may be adopted. Proposed Drain Size : Manning Formula: Where n= A= R= P= S= 1.5 x 1.465 m deep

Qc = 1/n * A * R2/3 * S1/2 Roughness coefficient (From Table 1.0 below) Flow area (m2) A/P = Hydraulic radius (m) wetted perimetter (m) bed gradient (m3/s)= (l/s)= (l/s)= = 0.015 = 1.867875 = 0.46808 = 3.99 1/318 = 0.003145 4.20975 4209.75 2266.86 OK

Qc = Discharge capacity of drain

Qr = Required Discharge capacity of drain

Table 1.0 Boundary Condition Concrete Brick Earth Earth with stones and weed Gravel Note: Where there are different flow surfaces with a drain section equivalent roughness coefficient may be used. Required Drain Size for Qc to reach Qr 1.5 A= R= P= Qc = Roughness Coefficient 0.015 0.017 0.027 0.035 0.03

0.906

m deep = = = = = 1.155 0.380 3.040 2.265 1.96 m/s (OK)

Flow Area (m2) A/P = Hydraulic radius (m) wetted perimetter (m) Discharge capacity of drain (m3/s)

v= Water Velocity = Qc / A (Minimum water velocity is 1 m/s and maximum water velocity is 3 m/s)

OPHIR RESIDENCES
Designed by: Title: DRAIN C EDI Checked by:

Job No.:

Date :

Design base on the Code of Practice on Surface Water Drainage 2011 Computation of Peak Runoff Assumptions: 1) Return period of 10 years 2) Time of concentration = 5 mins Qr = 1/360 C.I.A C = runoff coefficient(ref: table1) I = average rainfall intensity(mm/hr) A = Catchment area(hectares) Qr = 1 220 7133 0.43591 435.91 0.00 435.91 Value of C 1.0 0.9 0.8 0.65 0.45

Rational Formula: Where

enter in Sq.m

peak runoff at the point of design(m3/s)= (l/s)= Additional flow from RO Break Tank (l/s)= Total design flow rate (l/s)=

Table 1.0 Characteristics of catchement when fully developed Roads, highways, airport runways, paved up areas Urban areas fully and closely built up Residential/industrialareas densely built up Residential/industrial areas not densely built up and rural areas. Rural areas with fish ponds and vegetable gardens Note: For Catchment with composite land use or surface chracteristics, a weighed value of C may be adopted. Proposed Drain Size : Manning Formula: Where n= A= R= P= S= 0.75 x 1.407 m deep

Qc = 1/n * A * R2/3 * S1/2 Roughness coefficient (From Table 1.0 below) Flow area (m2) A/P = Hydraulic radius (m) wetted perimetter (m) bed gradient (m3/s)= (l/s)= (l/s)= = 0.015 = 0.896963 = 0.285484 = 3.14 1/318 = 0.003145 1.45387 1453.87 435.91 OK

Qc = Discharge capacity of drain

Qr = Required Discharge capacity of drain

Table 1.0 Boundary Condition Concrete Brick Earth Earth with stones and weed Gravel Note: Where there are different flow surfaces with a drain section equivalent roughness coefficient may be used. Required Drain Size for Qc to reach Qr 0.75 A= R= P= Qc = Roughness Coefficient 0.015 0.017 0.027 0.035 0.03

0.527

m deep = = = = = 0.336 0.204 1.646 0.435 1.30 m/s (OK)

Flow Area (m2) A/P = Hydraulic radius (m) wetted perimetter (m) Discharge capacity of drain (m3/s)

v= Water Velocity = Qc / A (Minimum water velocity is 1 m/s and maximum water velocity is 3 m/s)

OPHIR RESIDENCES
Designed by: Title: DRAIN C EDI Checked by:

Job No.:

Date :

Design base on the Code of Practice on Surface Water Drainage 2011 Computation of Peak Runoff Assumptions: 1) Return period of 10 years 2) Time of concentration = 5 mins Qr = 1/360 C.I.A C = runoff coefficient(ref: table1) I = average rainfall intensity(mm/hr) A = Catchment area(hectares) Qr = 1 220 10753 0.65713 657.13 0.00 657.13 Value of C 1.0 0.9 0.8 0.65 0.45

Rational Formula: Where

enter in Sq.m

peak runoff at the point of design(m3/s)= (l/s)= Additional flow from RO Break Tank (l/s)= Total design flow rate (l/s)=

Table 1.0 Characteristics of catchement when fully developed Roads, highways, airport runways, paved up areas Urban areas fully and closely built up Residential/industrialareas densely built up Residential/industrial areas not densely built up and rural areas. Rural areas with fish ponds and vegetable gardens Note: For Catchment with composite land use or surface chracteristics, a weighed value of C may be adopted. Proposed Drain Size : Manning Formula: Where n= A= R= P= S= 0.75 x 1.2 m deep

Qc = 1/n * A * R2/3 * S1/2 Roughness coefficient (From Table 1.0 below) Flow area (m2) A/P = Hydraulic radius (m) wetted perimetter (m) bed gradient (m3/s)= (l/s)= (l/s)= = 0.015 = 0.765 = 0.274194 = 2.79 1/318 = 0.003145 1.20706 1207.06 657.13 OK

Qc = Discharge capacity of drain

Qr = Required Discharge capacity of drain

Table 1.0 Boundary Condition Concrete Brick Earth Earth with stones and weed Gravel Note: Where there are different flow surfaces with a drain section equivalent roughness coefficient may be used. Required Drain Size for Qc to reach Qr 0.75 A= R= P= Qc = Roughness Coefficient 0.015 0.017 0.027 0.035 0.03

0.727

m deep = = = = = 0.463 0.233 1.986 0.657 1.42 m/s (OK)

Flow Area (m2) A/P = Hydraulic radius (m) wetted perimetter (m) Discharge capacity of drain (m3/s)

v= Water Velocity = Qc / A (Minimum water velocity is 1 m/s and maximum water velocity is 3 m/s)

OPHIR RESIDENCES
Designed by: DRAIN D Title: EDI Checked by:

Design base on the Code of Practice on Surface Water Drainage 2011 Computation of Peak Runoff Assumptions: 1) Return period of 10 years 2) Time of concentration = 5 mins Qr = 1/360 C.I.A C = runoff coefficient(ref: table1) I = average rainfall intensity(mm/hr) A = Catchment area(hectares) Qr = 1 220 23589 1.44155 1441.55 0.00 1441.55 Value of C 1.0 0.9 0.8 0.65 0.45

Rational Formula: Where

enter in Sq.m

peak runoff at the point of design(m3/s)= (l/s)= Additional flow from RO Break Tank (l/s)= Total design flow rate (l/s)=

Table 1.0 Characteristics of catchement when fully developed Roads, highways, airport runways, paved up areas Urban areas fully and closely built up Residential/industrialareas densely built up Residential/industrial areas not densely built up and rural areas. Rural areas with fish ponds and vegetable gardens Note: For Catchment with composite land use or surface chracteristics, a weighed value of C may be adopted. Proposed Drain Size : Manning Formula: Where n= A= R= P= S= 0.9 x 2.1 m deep

Qc = 1/n * A * R2/3 * S1/2 Roughness coefficient (From Table 1.0 below) Flow area (m2) A/P = Hydraulic radius (m) wetted perimetter (m) bed gradient (m3/s)= (l/s)= (l/s)= = 0.015 = 1.6065 = 0.359396 = 4.47 1/318 = 0.003145 3.03593 3035.93 1441.55 OK

Qc = Discharge capacity of drain

Qr = Required Discharge capacity of drain

Table 1.0 Boundary Condition Roughness Coefficient

Concrete Brick Earth Earth with stones and weed Gravel Note: Where there are different flow surfaces with a drain section equivalent roughness coefficient may be used. Required Drain Size for Qc to reach Qr 0.9 A= R= P= Qc =

0.015 0.017 0.027 0.035 0.03

1.112

m deep = = = = = 0.851 0.305 2.790 1.441 1.69 m/s

Flow Area (m2) A/P = Hydraulic radius (m) wetted perimetter (m) Discharge capacity of drain (m3/s)

v= Water Velocity = Qc / A (Minimum water velocity is 1 m/s and maximum water velocity is 3 m/s)

Job No.:

Date :

7.73 1.54 38.65 1.546

22700 8200

(OK)

OPHIR RESIDENCES
Designed by: DRAIN C Title: EDI Checked by:

Design base on the Code of Practice on Surface Water Drainage 2011 Computation of Peak Runoff Assumptions: 1) Return period of 10 years 2) Time of concentration = 5 mins Qr = 1/360 C.I.A C = runoff coefficient(ref: table1) I = average rainfall intensity(mm/hr) A = Catchment area(hectares) Qr = 1 220 700 0.04278 42.78 0.00 42.78 Value of C 1.0 0.9 0.8 0.65 0.45

Rational Formula: Where

enter in Sq.m

peak runoff at the point of design(m3/s)= (l/s)= Additional flow from RO Break Tank (l/s)= Total design flow rate (l/s)=

Table 1.0 Characteristics of catchement when fully developed Roads, highways, airport runways, paved up areas Urban areas fully and closely built up Residential/industrialareas densely built up Residential/industrial areas not densely built up and rural areas. Rural areas with fish ponds and vegetable gardens Note: For Catchment with composite land use or surface chracteristics, a weighed value of C may be adopted. Proposed Drain Size : Manning Formula: Where n= A= R= P= S= 0.75 x 0.65 m deep

Qc = 1/n * A * R2/3 * S1/2 Roughness coefficient (From Table 1.0 below) Flow area (m2) A/P = Hydraulic radius (m) wetted perimetter (m) bed gradient (m3/s)= (l/s)= (l/s)= = 0.015 = 0.414375 = 0.223383 = 1.86 1/318 = 0.003145 0.57032 570.32 42.78 OK

Qc = Discharge capacity of drain

Qr = Required Discharge capacity of drain

Table 1.0 Boundary Condition Roughness Coefficient

Concrete Brick Earth Earth with stones and weed Gravel Note: Where there are different flow surfaces with a drain section equivalent roughness coefficient may be used. Required Drain Size for Qc to reach Qr 0.75 A= R= P= Qc =

0.015 0.017 0.027 0.035 0.03

0.103

m deep = = = = = 0.066 0.071 0.925 0.042 0.64 m/s

Flow Area (m2) A/P = Hydraulic radius (m) wetted perimetter (m) Discharge capacity of drain (m3/s)

v= Water Velocity = Qc / A (Minimum water velocity is 1 m/s and maximum water velocity is 3 m/s)

Job No.:

Date :

7.73 1.54 38.65 1.546

22700 8200

(OK)

OPHIR RESIDENCES
Designed by: DRAIN C Title: EDI Checked by:

Design base on the Code of Practice on Surface Water Drainage 2011 Computation of Peak Runoff Assumptions: 1) Return period of 10 years 2) Time of concentration = 5 mins Qr = 1/360 C.I.A C = runoff coefficient(ref: table1) I = average rainfall intensity(mm/hr) A = Catchment area(hectares) Qr = 1 220 300 0.01833 18.33 0.00 18.33 Value of C 1.0 0.9 0.8 0.65 0.45

Rational Formula: Where

enter in Sq.m

peak runoff at the point of design(m3/s)= (l/s)= Additional flow from RO Break Tank (l/s)= Total design flow rate (l/s)=

Table 1.0 Characteristics of catchement when fully developed Roads, highways, airport runways, paved up areas Urban areas fully and closely built up Residential/industrialareas densely built up Residential/industrial areas not densely built up and rural areas. Rural areas with fish ponds and vegetable gardens Note: For Catchment with composite land use or surface chracteristics, a weighed value of C may be adopted. Proposed Drain Size : Manning Formula: Where n= A= R= P= S= 0.75 x 0.7 m deep

Qc = 1/n * A * R2/3 * S1/2 Roughness coefficient (From Table 1.0 below) Flow area (m2) A/P = Hydraulic radius (m) wetted perimetter (m) bed gradient (m3/s)= (l/s)= (l/s)= = 0.015 = 0.44625 = 0.230026 = 1.94 1/318 = 0.003145 0.62631 626.31 18.33 OK

Qc = Discharge capacity of drain

Qr = Required Discharge capacity of drain

Table 1.0 Boundary Condition Roughness Coefficient

Concrete Brick Earth Earth with stones and weed Gravel Note: Where there are different flow surfaces with a drain section equivalent roughness coefficient may be used. Required Drain Size for Qc to reach Qr 0.75 A= R= P= Qc =

0.015 0.017 0.027 0.035 0.03

0.060

m deep = = = = = 0.038 0.045 0.852 0.018 0.47 m/s

Flow Area (m2) A/P = Hydraulic radius (m) wetted perimetter (m) Discharge capacity of drain (m3/s)

v= Water Velocity = Qc / A (Minimum water velocity is 1 m/s and maximum water velocity is 3 m/s)

Job No.:

Date :

7.73 1.54 38.65 1.546

22700 8200

(OK)

OPHIR RESIDENCES
Designed by: DRAIN C Title: EDI Checked by:

Design base on the Code of Practice on Surface Water Drainage 2011 Computation of Peak Runoff Assumptions: 1) Return period of 10 years 2) Time of concentration = 5 mins Qr = 1/360 C.I.A C = runoff coefficient(ref: table1) I = average rainfall intensity(mm/hr) A = Catchment area(hectares) Qr = 1 220 1150 0.07028 70.28 0.00 70.28 Value of C 1.0 0.9 0.8 0.65 0.45

Rational Formula: Where

enter in Sq.m

peak runoff at the point of design(m3/s)= (l/s)= Additional flow from RO Break Tank (l/s)= Total design flow rate (l/s)=

Table 1.0 Characteristics of catchement when fully developed Roads, highways, airport runways, paved up areas Urban areas fully and closely built up Residential/industrialareas densely built up Residential/industrial areas not densely built up and rural areas. Rural areas with fish ponds and vegetable gardens Note: For Catchment with composite land use or surface chracteristics, a weighed value of C may be adopted. Proposed Drain Size : Manning Formula: Where n= A= R= P= S= 0.75 x 0.85 m deep

Qc = 1/n * A * R2/3 * S1/2 Roughness coefficient (From Table 1.0 below) Flow area (m2) A/P = Hydraulic radius (m) wetted perimetter (m) bed gradient (m3/s)= (l/s)= (l/s)= = 0.015 = 0.541875 = 0.246868 = 2.20 1/318 = 0.003145 0.79721 797.21 70.28 OK

Qc = Discharge capacity of drain

Qr = Required Discharge capacity of drain

Table 1.0 Boundary Condition Roughness Coefficient

Concrete Brick Earth Earth with stones and weed Gravel Note: Where there are different flow surfaces with a drain section equivalent roughness coefficient may be used. Required Drain Size for Qc to reach Qr 0.75 A= R= P= Qc =

0.015 0.017 0.027 0.035 0.03

0.144

m deep = = = = = 0.092 0.092 0.995 0.070 0.76 m/s

Flow Area (m2) A/P = Hydraulic radius (m) wetted perimetter (m) Discharge capacity of drain (m3/s)

v= Water Velocity = Qc / A (Minimum water velocity is 1 m/s and maximum water velocity is 3 m/s)

Job No.:

Date :

7.73 1.54 38.65 1.546

22700 8200

(OK)

OPHIR RESIDENCES
Designed by: DRAIN C Title: EDI Checked by:

Design base on the Code of Practice on Surface Water Drainage 2011 Computation of Peak Runoff Assumptions: 1) Return period of 10 years 2) Time of concentration = 5 mins Qr = 1/360 C.I.A C = runoff coefficient(ref: table1) I = average rainfall intensity(mm/hr) A = Catchment area(hectares) Qr = 1 220 3400 0.20778 207.78 0.00 207.78 Value of C 1.0 0.9 0.8 0.65 0.45

Rational Formula: Where

enter in Sq.m

peak runoff at the point of design(m3/s)= (l/s)= Additional flow from RO Break Tank (l/s)= Total design flow rate (l/s)=

Table 1.0 Characteristics of catchement when fully developed Roads, highways, airport runways, paved up areas Urban areas fully and closely built up Residential/industrialareas densely built up Residential/industrial areas not densely built up and rural areas. Rural areas with fish ponds and vegetable gardens Note: For Catchment with composite land use or surface chracteristics, a weighed value of C may be adopted. Proposed Drain Size : Manning Formula: Where n= A= R= P= S= 0.75 x 1.177 m deep

Qc = 1/n * A * R2/3 * S1/2 Roughness coefficient (From Table 1.0 below) Flow area (m2) A/P = Hydraulic radius (m) wetted perimetter (m) bed gradient (m3/s)= (l/s)= (l/s)= = 0.015 = 0.750338 = 0.272761 = 2.75 1/318 = 0.003145 1.17979 1179.79 207.78 OK

Qc = Discharge capacity of drain

Qr = Required Discharge capacity of drain

Table 1.0 Boundary Condition Roughness Coefficient

Concrete Brick Earth Earth with stones and weed Gravel Note: Where there are different flow surfaces with a drain section equivalent roughness coefficient may be used. Required Drain Size for Qc to reach Qr 0.75 A= R= P= Qc =

0.015 0.017 0.027 0.035 0.03

0.304

m deep = = = = = 0.194 0.153 1.267 0.207 1.07 m/s

Flow Area (m2) A/P = Hydraulic radius (m) wetted perimetter (m) Discharge capacity of drain (m3/s)

v= Water Velocity = Qc / A (Minimum water velocity is 1 m/s and maximum water velocity is 3 m/s)

Job No.:

Date :

7.73 1.54 38.65 1.546

22700 8200

(OK)

OPHIR RESIDENCES
Designed by: DRAIN C Title: EDI Checked by:

Design base on the Code of Practice on Surface Water Drainage 2011 Computation of Peak Runoff Assumptions: 1) Return period of 10 years 2) Time of concentration = 5 mins Qr = 1/360 C.I.A C = runoff coefficient(ref: table1) I = average rainfall intensity(mm/hr) A = Catchment area(hectares) Qr = 1 220 2800 0.17111 171.11 0.00 171.11 Value of C 1.0 0.9 0.8 0.65 0.45

Rational Formula: Where

enter in Sq.m

peak runoff at the point of design(m3/s)= (l/s)= Additional flow from RO Break Tank (l/s)= Total design flow rate (l/s)=

Table 1.0 Characteristics of catchement when fully developed Roads, highways, airport runways, paved up areas Urban areas fully and closely built up Residential/industrialareas densely built up Residential/industrial areas not densely built up and rural areas. Rural areas with fish ponds and vegetable gardens Note: For Catchment with composite land use or surface chracteristics, a weighed value of C may be adopted. Proposed Drain Size : Manning Formula: Where n= A= R= P= S= 0.75 x 1.05 m deep

Qc = 1/n * A * R2/3 * S1/2 Roughness coefficient (From Table 1.0 below) Flow area (m2) A/P = Hydraulic radius (m) wetted perimetter (m) bed gradient (m3/s)= (l/s)= (l/s)= = 0.015 = 0.669375 = 0.264053 = 2.54 1/318 = 0.003145 1.02997 1029.97 171.11 OK

Qc = Discharge capacity of drain

Qr = Required Discharge capacity of drain

Table 1.0 Boundary Condition Roughness Coefficient

Concrete Brick Earth Earth with stones and weed Gravel Note: Where there are different flow surfaces with a drain section equivalent roughness coefficient may be used. Required Drain Size for Qc to reach Qr 0.75 A= R= P= Qc =

0.015 0.017 0.027 0.035 0.03

0.265

m deep = = = = = 0.169 0.141 1.201 0.171 1.01 m/s

Flow Area (m2) A/P = Hydraulic radius (m) wetted perimetter (m) Discharge capacity of drain (m3/s)

v= Water Velocity = Qc / A (Minimum water velocity is 1 m/s and maximum water velocity is 3 m/s)

Job No.:

Date :

7.73 1.54 38.65 1.546

22700 8200

(OK)