Академический Документы
Профессиональный Документы
Культура Документы
07 Jul 2011
A Bdoc can have different statuses. Below are the different statuses of Bdoc.
Transaction codes used in Bdoc trouble shooting: Transaction code SMW01 SMW02 Description Display Bdoc Messages Display Bdoc message summary
Bdoc errors in SANDISK Project: Failed Bdocs in the system (CPP) needs to be investigated and corrective measures to be made for the data consistency in the SanDisk system landscape. Here we will discuss few Bdoc errors. Example #1: Issue: CUSTOMER_MAIN Bdoc is in E04 (Validation) error Terms of payment Z123 not available. Reason for error: Terms of payment Z123 is not available in CPP configuration.
07 Jul 2011
Solution: Since we do not the separate configuration for the terms of payment in CPP system, we will replicate the respective configuration object from EPP to CPP. DNL_CUST_PAYM - customizing object need to be replicate from EPP to CPP to solve customizing issue. Example #2: Issue: CUSTOMER_MAIN Bdoc is in E04 (Validation) error Customer group 75 is not available; enter a valid customer group Reason for error: Customer group 75 is not available in CPP configuration.
Solution: Since we do not the separate configuration for the terms of payment in CPP system, we will replicate the respective configuration object from EPP to CPP. DNL_CUST_KTOKD - customizing object need to be replicate from EPP to CPP to solve customizing issue.
07 Jul 2011
Example #3: Issue: CUSTOMER_MAIN Bdoc is in E04 (Validation) error Business partner with GUID 4DDB764036D259E6E10000000AB34AA1 does not exist Reason for error: BP- GUID in CPP is not matching with the GUID in EPP
Solution: We need to define the request for this customer and do the request load from EPP to CPP. So that EPP GUID and CPP GUID for this customer will match. Example #4: Issue: CRM_FM_FPO Bdoc is in E01 (Technical Error) status with error NO rebates and/or 6-period Sales Volume; NB_DAYS; Use T-code ZTPM002 to maintain; Product/ Hierarchy G Reason for error: Sales volumes missing and need to be maintained.
Solution: Embedded is the solution for this kind of issues in SanDisk project.
07 Jul 2011
Example #5: Issue: PRODUCT_MAT Bdoc is in E04 (validation Error) status with error Division 75 does not exist Reason for error: Newly added Division is not CPP.
Solution: Customizing Adapter object for product needs to be replicated to CPP. Example #6: Issue: PRODUCT_MAT Bdoc is in E08 (mapping Error) status with error Category for product hierarchy 07137IS-5BK--00128 does not exist Reason for error: Newly added product hierarchy is missing in CPP.
Solution: Below mentioned customizing objects need to run in CPP system to replicate the newly added PH in EPP. DNL_CUST_PROD0 DNL_CUST_PROD1 DNL_CUST_PROD3
07 Jul 2011
07 Jul 2011