Вы находитесь на странице: 1из 8

THERMOGRAPHY REPORT Report No.

:- 01 MAIN LOCATION:- SWITCH YARD (400 KV), BAY-02

Location ISOLATOR (402-89-AL)

Equipment CT SIDE

Date 06.04.10

Cursor-1 55.6

Cursor-2 38.2

Diff. Temp. 17.4

Objective:- R Basic Observation:- . R is over heated.

Analysis & Recommendation:- R temp. is in semi critical range so close monitoring is needed. Should be attended in the next priority.

Client Analysis by:-

Client Representative:-

THERMOGRAPHY REPORT Report No. :- 02 MAIN LOCATION: - SWITCH YARD (400 KV), BAY-05

Location ISOLATOR (405-89-TB)

Equipment CT SIDE

Date 21.02.2011

Cursor 1 53.2

Cursor 2 35.2

Diff. Temp. 35.3

Avg. Temp. 44.2

Objective:- B Basic Observation:- . B is over heated.

Analysis & Recommendation:- B temp is in semi critical range and may create problem in near future so it should be attended in next priority .

Client Analysis by:-

Client Representative:-

THERMOGRAPHY REPORT Report No. :- 03 MAIN LOCATION:- SWITCH YARD (400 KV), BAY-02

Location ISOLATOR (402-89-AA)

Equipment CENTRE

Date 06.04.10

Cursor-1 69.2

Cursor-2 43.4

Diff. Temp. 25.8

Objective:- B Basic Observation:- . B is over heated.

Analysis & Recommendation:- B temp. is in semi critical range and may create problem in near future so close monitoring is needed.

Client Analysis by:-

Client Representative:-

THERMOGRAPHY REPORT Report No. :- 04 MAIN LOCATION:- SWITCH YARD (400 KV), BAY-03

Location ISOLATOR (403-89-AT) 1B

Equipment BUS 2 SIDE

Date 06.04.10

Cursor-1 67.3

Cursor-2 35.6

Diff. Temp. 31.7

Objective:- R Basic Observation:- . R is over heated.

Analysis & Recommendation:- :- R temp. is in semi critical range so it should be under regular monitoring .Check the loose connection .

Client Analysis by:-

Client Representative:-

THERMOGRAPHY REPORT Report No. :- 05 MAIN LOCATION: - SWITCH YARD (400 KV), BAY-07

Location ISOLATOR (407-89-AA)

Equipment BREAKER SIDE

Date 22.02.2011

Cursor 1 53.3

Cursor 2 34.8

Diff. Temp. 18.5

Avg. Temp. 44.05

Objective:- Y Basic Observation:- . Y is over heated.

Analysis & Recommendation: - Y temp is in semi critical range and may create problem in near future so it should be attended in next priority.

Client Analysis by:-

Client Representative:-

THERMOGRAPHY REPORT Report No. :- 06 MAIN LOCATION: - COOLING TOWER

Location CT #3 SWITCH GEAR ROOM

Equipment FAN G

Date 02.05.2011

Max. Temp. 103.2

Min. Temp. 52.8

Diff. Temp. 50.4

Avg. Temp. 64.3

Objective:- R Basic Observation:- . R is over heated.

Analysis & Recommendation:- R temp is in semi critical range and may create problem in near future so it should be attended in next priority .

Client Analysis by:-

Client Representative:-

THERMOGRAPHY REPORT Report No. :-07 MAIN LOCATION :- COOLING TOWER

Location CT #2 SWITCH GEAR ROOM

Equipment FAN - K

Date 22.12.2010

Cursor 1 126.8

Cursor 2 80.3

Diff. Temp. 46.5

Objective:- R ,Y Basic Observation:- . R ,Y is over heated.

Analysis & Recommendation:- R ,Y temp. is in critical range so it should be attended as soon as possible.

Client Analysis by:-

Client Representative:-

THERMOGRAPHY REPORT Report No. :- 08

MAIN LOCATION:- TRANSFORMERS

Location GTG 1A GSU

Equipment TRANSFORMER BUSHING

Date 30.01.10

Cursor-1 55.5

Cursor-2 42.9

Diff. Temp. 12.6

Basic Observation:- R is heated.

Analysis & Recommendation:- R transformer bushing Temp is high so it should be attended with next priority .