Size 65 X 40 NB
UOM Nos
Qty. 1
MOC ASTM A234 GR WPB ANSI B16.9 ASTM A234 GR WPB ANSI B16.9
2 3 4 5 6 7 8 9
Ecentric reducer End cap Strainer Strainer Strainer Strainer Strainer media For DMF Media trap Resin trap Basket Strainer Sight glasses For MB Safety Shower Primer & paint for Interconnecting piping Primer and paint For structural material
Nos Nos Nos Nos Nos Nos Nos Lot NOS NOS Nos Nos Nos lot Lot
1 25 6 6 2 16 2 1 3 4 2 3 3 1 1
SS 316 SS 316
10 11 12 13 14
15
100 NB
Mtr
30
IS 1239 Grade C
16
Elbow
100 NB
Nos
ANSI B 16.9
17
Flange
100 NB
Nos
20
18
Elbow
32 NB
Nos
ANSI B 16.9
19 20 21 22 23 24 25 26 28 29 30 31 32
Gasket Sheet U Clamp For UPVC Piping U Clamp For UPVC Piping U Clamp For HDPE Piping U Clamp For HDPE Piping U Clamp For HDPE Piping U Clamp For HDPE Piping Globe Valve Angle Final paint All vessles GI Pipe UPVC Flange UPVC Flange UPVC Flange 90 degree UPVC elbow 45 degree UPVC elbow Anchor fastner Cu flexible Wire Cu flexible Wire Cu Lugs Ring Type Cu Lugs Ring Type Nit Bolt with Double viser Nit Bolt with Double viser Bend Bend FTA ( Female Adapter) Reducer Pipe Coupler & Bolt With Double Viser & Bolt With Double Viser & Bolt With Double Viser & Bolt With Double Viser & Bolt With Double Viser & Bolt With Double Viser Air Seal cap Bend Reducer Reducer
1.5 Mtr X 1.5 Mtr/Roll sheet 25 OD 20 OD 32 OD 160 OD 63 OD 25 OD 32 NB ISA 3" 100 NB 125 NB 25NB 25NB 25NB M12 X125 NB 16 MM2 6 MM2 16 MM2 6 MM2 M6 X 25 MM M12 X40 MM 50 NB 32 NB 1/2" 1/2" X 3/4 " 1/2 " (20 OD) 25 OD M10 X 60 M 16 X 65 M12 X 65 M16 X 65 M12 X 40 M12 X 65 32 NB M-38mmX F-18 mm/1" long M-50 mm X F-36 MM/ 1 " long
Nos Nos Nos Nos Nos Nos Nos Nos Mtr Lot Mtr Nos Nos Nos Nos Nos Nos Mtr Mtr Nos Nos Nos Nos Nos Nos Nos Nos Mtr Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos
2 60 50 60 10 40 40 2 202 1 150 2 2 8 4 4 1000 90 90 180 180 180 180 5 5 32 32 3 20 260 210 110 25 80 56 1 2 4 2
Champion, Asbestos
SS 316 MS GI
33 35 36 37 38 39 40 41 42 44 45 46 47 48 49 50 51 52 53 55 56 57 58
SS 316 SS 316 CPVC CPVC CPVC CPVC GI GI GI GI GI GI HDPE SS 316 SS 316 SS 316
59 60 61 62 63
Flange With Long Adapter Flange With Long Adapter Flange With Long Adapter Instrument fitting Handrailing materials
25 NB 20 NB 50 NB
32 24 8 1 1
Material Requirement Job No.2249 Location Acid & caustic Unloading Pump
material required for extra modification of UF discharge piping to UF feed Pump instead of shift the store to another location
Elbow in MB frontal piping is missing of Qty. 6 No. and 2 nos not matching.extra elbow require to change the elevation as per site situation , 2 Nos spool piece having a height 1834 MM not given in drawing and also UF discharge modification piping Elbow in MB frontal piping is missing of Qty. 6 No. and 2 nos not matching.extra elbow require to change the elevation as per site situation , 2 Nos spool piece having a height 1834 MM not given in drawing and also UF discharge modification piping. (for the given work we need flanges) Flanges and Elbow we require for the Modification of Piping in DM Plant
RO reject Line
For CPVC piping of All Dosing Pump Installation of 30 level guages Installation Of 48 No. float cage type level guage Installation of 12 Nos. of Displacer type level guages Installation of 5 nos. untrasonic level transmitter Installation of 5 nos. Dp type level transmitter Installation of Inline Type rotameter- 6 nos. For DG tower RO reject Line Ash Water Pump and ABL 301 Blower For N-Pit Raw Water pump
8 Nos Of Chemical Dosing tanks In DM Plant Require for installation of pressure guages and pressure switches HRSCC, CASCADE,CLARIFIED STORAGE TANKS, ALL PITS,SUMPS
Remark
3 nos of Spool Piece Missing.its need to fabricate. Out of three 2 are installed 07B-41 -1 Of 2 and one is balanced. Piping we Received as per isometric but it is not matching to the pump suction because As per drawing , the suction is site mounted and pump received having suction in straight mounted. So it need to fabricate Pump trial purpose During Commissioning
07A-15 1 of 2
Not received
Not received Out Of 6 Nos. We have received 3 nos. of Glasses Not received Not received Not received
As per drawing 07A-79 :-53.2Mtr but at actual we need 72 Mtr. And also In MB we used 5 Mtr Piping and also most of the line in DM having size 100 NB and as per site we have done Modification. 07B-79 Elbow in MB frontal piping is missing of Qty. 6 No. and 2 nos not matching.extra elbow require to change the elevation as per site situation , 2 Nos spool piece having a height 1834 MM not given in drawing and also UF discharge modification piping Elbow in MB frontal piping is missing of Qty. 6 No. and 2 nos not matching.extra elbow require to change the elevation as per site situation , 2 Nos spool piece having a height 1834 MM not given in drawing and also UF discharge modification piping. (for the given work we need flanges) Flanges and Elbow we require for the Modification of Piping in DM Plant
Not Rceived
Not received
Not received For matching Rubberline pipe instead of cutting for LG installation in acid tanks for LG installation in acid tanks for LG installation in acid tanks For mislaneous work of structure support Earthing of Motor
07A-23 07B-30
not received
Not received rotameter fall to the RO membrane, we need to modify the piping For gland matching to terminal box For gland matching to terminal box