Presentation By
D R PAI
General Manager Engineering & Project Kankroli Tyre Plant (KTP) A unit of ) Kankroli ( Rajasthan JK TYRE & INDUSTRIES LIMITED ( TS-16949 , ISO-9001, OHSAS & ISO-14001 Plant )
KTP
Presentation By
KTP
KTP
VISION
To be amongst the most admired companies in India
Lala Lakshmipat Singhania ( 1910 1976 )
Committed to Excellence.
MISSION
Be a Customer Obsessed Company-Customer first 24x7 No.1 Tyre Brand In India Most profitable Tyre company in India Motivated and committed team for excellence in performance Be a green company Deliver enhanced value to all stakeholders Leverage & Enhance global presence through Acquisition / JV
4
KTP
KTP
Energy Policy
We at J.K.Tyres are Committed to Conserve Natural Resources & Energy by
Lala Lakshmipat Singhania ( 1910 1976 )
Enhancing Equipment Efficiency Minimizing Waste & idle run Technology & Innovation Periodic Reviews and Skill Upgradation People Involvement
We will continuously Benchmark & Improve Energy Performance in our endeavor to be the Worlds Best Bias Tyre Plant By 2010.
KTP
Energy conservation
Fuel conservation Resource conservation Reduction of green house gases Reduction in consumption of petroleum products Elimination of ozone depleting substances
KTP
POWER
Lala Lakshmipat Singhania ( 1910 1976 )
Actions: Optimization of Blowers and pumps Process Optimization Energy Efficient Lighting Use of renewable energy Efficient compressed air generation Extensive use of VFDs Energy Monitoring.
KTP
0.795
0.776
0.748
0.712
2004-05 2005-06 2006-07 2007-09 2009-10
KTP
STEAM
Lala Lakshmipat Singhania ( 1910 1976 )
Actions:
Optimization of Usage Pressure Elimination of redundant lines Process improvements Waste heat recovery Switching to alternate economic energy forms Heat recovery and reuse
KTP
10
2.593
2.516
2.385
2.125
2004-05 2005-06 2006-07 2007-09 2009-10
KTP
11
Saving Realization
Year Annual Energy consumption Prodn. in Specific Energy tons or Consumption any other unit of prodn. Electrical Thermal KWH / Ton tons or kL or unit of per ton or prodn unit of prodn
71795 779 0.483 0.01 72203 766 0.453 0.01 69089 749 0.419 0.01 53711 740 0.403 0.01 1.22 2.22 1.67
(April March)
Electrical
Thermal
KWH * Million
200607 55.918
Rs Million
218.65
Rs Million
101.12 3.04 116.3 7.29 120.82 5.31 96.44 2.47
3.23
200708
55.293
243.72
Coal LDO/LSHS
200809
51.725
222.53
Coal LDO/LSHS
2009-10
39.747**
170.91
Coal LDO/LSHS
KTP
12
31824
21696
01/01/1900
02/01/1900
2005-06
2009-10
LDO/LSHS ( KL )
788
596
2005-06
2009-10
KTP
13
Power Consumption
Utilities = 38% , Mixing = 36%. Extruders = 7%, Air Washer = 5%, Calendaring = 4% Tyre Curing = 4%, Tyre Building = 2%, Lighting = 2%.
Ty re C urin g 4 Ca lend arin g, 4 A ir W a s he r, 5 U tilit ies , 38 E x tru ders , 7 , Ty re B uild ing 2 ,
L ight ing, 2
M ix in g , 3 6
KTP
15
AIR WASHER
Lala Lakshmipat Singhania ( 1910 1976 )
Band Building Air Washer Metallic Blades replaced by FRP Blades. Horizontal Deployment to be done on All AHU
AIR FLOW (CFM) AIR FLOW DELIVERED VIS A-VIS POWER CONSUMED TOTAL Pump Conversion 18KW to 3.7 KW ALUMINIUM ENCON POWER (KW) ALUMINIUM ENCON
140000
140000 13.7 KW
56
44
SAVING SAVING PER DAY Per AHU SAVING PER DAY 13 AHU SAVING (Rs.)/Year (250 Days)
KTP
16
WORKING PRINCIPLE Variable Triggered Voltage (Thyristor Control) with respect to variable load. Approximately 300 KWH saving per day. Energy Saver Cost 2.25 Lacs For 200 KW Motor. Pay Back 8 Months
KTP
17
Steam (Kg/ Kg ) 1.98 Reduction of fossil fuels Insulation improvement on hot steam lines Waste Heat recovery Reduction in flash steam losses Hot water recovery in curing presses Using optimum solution for process heating
Power (Kwh/Kg) 0.710 q Replacement of inefficient pumps. q Strengthen power monitoring system. q On line Energy management qVFD installation on Higher HP Mills qOptimization of Blower on air washers
JK - KTP
KTP
18
Daily capturing of energy parameters, their analysis and investigate for deviations by section and functional heads Comparison within similar equipment
F a b r i c S c ra p -B U 1 F a b r i c S c ra p -B U 2 F a b r i c S c ra p -T o t a l S q W o v en F a b r ic I n su la te d B e ad
Daily reporting and threadbare discussions in management review meeting Review of energy projects by unit head for progress and employee participation
G r e e n T y re C u re d T y re T o ta l Pr o c e ss S cr a p T yre T o ta l Pr o c e ss S cr a p T yre C u re d T u b e C u re d F l a p T o ta l Pr o c e ss S cr a p T o ta l Pr o c e ss S cr a p
1 57 0 .0 9 0 43 0 .0 6 0 2 90 0 .4 0 0 3 33 0 .4 6 0 16 0 .7 2 0 28 0 .2 7 0 19 0 .0 1 0 98 0 .0 5 0 5 27 0 .2 7 0 56 772 0 .3 3 4 1 24 1 .3 6 3 18 1 .2 0 0 8 41 0 .4 0 9 85 241 0 .4 9 4
-6 9 5 -0 . 0 3 7 -2 5 7 0 -0 . 1 3 7 -3 2 6 5 -0 . 1 7 4 -2 1 2 -0 . 3 0 1 -19 -0 . 0 0 7 -85 -0 . 0 0 2 -8 4 8 -0 . 0 1 6 -4 4 4 0 -0 . 0 8 4 -4 1 6 1 1 0 -0 . 0 8 4 8 79 0 .3 4 7 1 37 0 .3 3 9 -2 6 6 8 -0 . 0 4 8 -2 3 3 8 0 4 -0 . 0 1 9
KTP
19
KTP
20
Township Street light to be replaced with LED Halogen lights of lamp. 30 Nos. 250W to be replaced with LED lights BU#1 MP F/mill drive - race sent to H.O . Trial Taken BU#3 BU#3 G,H line lightining to be linked with Circuit modification to press. be done curing lights to be linked with lighting Transformer available transformer. to be taken in line AHU pump replacement Relacement of Pump
Rs. 7000 PA
11 Lacs PA Awaited For Race approval 25000 PA approx.25000 per annum saving 1.25 Lacs PA 2.73 Lacs
BU#1
AHU filter replacememnt Relacement of Filter MP cooling conveyor D.C motor Conversion Of Dc replaced with A.C motor . Motor with Ac Motor VFD BB#2 Reconditioning in 27 lacs BB#2 Reconditioning instead of 1.1 corers. (17lacs/year to be continued for 6 years)
3.5 Lacs
Technology Upgradation
27 Lacs
17 lacs PA 17 lacs per year for for Six years next six years.
Contd .
KTP
21
Utility
Bio fuel to be used in boiler. Boiler blow down control Steam reduction by installation of electrical heater (4-roll calander,T.C.U ,hot can,Dil. heating) Rs. 24 lacs to be saved under W /shop reconditioning Ecoventilater to be fixed - 200 Nos. BB V.F.D
Utility BU#1
Usage of biomass instead of coal Process Optimization Conversion of steam to electric heater 9 Lacs
SSU#1
SSU#1 BU#1
In House spare development with spares. Ecoventillaters to be provided over roof To Be Evaluated
No Cost
24 Lacs
Utility
Common VFD to be provided or switchng On & OFF of AC motors as per temperature Tecnology Upgradation Process Optimization Old Low Efficeint AC to be replaced with new efficient AC Process Optimization
2.5 Lacs
CBD pump vertical to horizontal. slitter D.C motor replaced with A.C motor + drive Dome drain + Condensate recovery old age A.C to be replaced by star A.C
1 Lacs
To Be evaluated. To Be evaluated.
To be evaluated
Utility
To Be evaluated.
KTP
22
KTP
23
Thank You