General Layout

1. Location of the project/Map 2. Foot print area, Land area. 3. Perimeter/boundary points. 1. 2. 3. 4. Production rate Material Storage facility Raw Materials Chemicals (process materials, or for cleaning etc) 5. Fuels, lubricants and other materials 6. Finished products(Freezer, warehouse etc) 1. Material Preparation and Handling 2. Material size 3. Heating/ drying (direct heat/energy application) 4. Processing (Mixing/ grinding, pasteurizing) 5. Process flow diagrams 1. Generators/ boilers, steam generators etc Office, canteen, living quarters(if any) Solid: Liquid Gaseous Skimming, residue removal, septic tanks Trash room area (if any) 1. Power electricity (source, estimated demand consumption) 2. Power electricity from renewable energies if any (source, estimated demand consumption) 3. Water (source , m3/day) 2. Backup Support Facilities (Generators/ boilers, steam generators etc).

Production

Processing

Support Facilities

Admin Support Area Waste Management

Wastewater Management /treatment on site Solid Waste Management Utilities

Manpower

1. Manpower construction phase and

operation phase.

Project Details Utilities

Organization charts.

Raw Materials

Wastes

Detailed descriptions of the type, components, and units of the proposed project. A list of utility types (e.g., electricity, water, waste treatment) that will be used or produced during the operation phase of the proposed project and information about whether these utilities will be part of the proposed project or will be located off site. Estimates of the quantity of services (e.g., electricity, water, waste treatment) that will be required or produced by the project should also be included. If the proposed project will require the direct or indirect use of groundwater for any project activities or processes, then this should also be described. A project organizational chart listing the people who are managing the main activities, phases, And components of the proposed project. For each person, this chart should provide his or her name, his or her roles and responsibilities, and the number of employees he or she is supervising. A list of all raw material and chemical quantities that will be used during the operation of the proposed project and their associated purposes and functions. Material Safety Data Sheets (MSDSs) should be included for all hazardous chemicals and raw materials. A description of the different wastes (Hazardous, solid, liquid) and quantities that will be generated by project activities conducted during the operation A list and descriptions of all the origins of point source emissions and pollution (e.g., gases, liquids, solids, noise) produced by project activities conducted during the operation of the proposed project. Emissions Process Flow Diagram(s) should be used to detail this information. A description of any planned or possible future project expansions or phases of the proposed

Point source of Emissions and Pollution

Future Expansions

Project schedule (tentative)

project. This section should describe the current status of project implementation, the schedule of the proposed project and the components and phases therein (if it is a multi-component or a multi-phased project). This section should also include a concise overview of the approval procedures and steps for the proposed project.