DESIGN CALCULATIONS &

EARTH WORK CALCULATIONS

GENERAL ALIGNMENT OF THE PROPOSED HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

Fly wing
Return wall
Expansion Joint

Dirt wall

13.30m

Pier cap
Abutment

T-Beam

Deck slab&Kerb

Pier

Top plugging

Curb
Steining
Bottom plugging

Note:-Due to limitation of space,only 5 piers are shown,out of total 11 piers proposed.

Assistant Exe.Engineer
PR,Sompeta

Dy. Exe.Engineer
PR,Sompeta

GOVERNMENT OF ANDHRA PRADESH


HYDERABAD

CONSTRUCTION OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER ON THE ROAD FROM BARUVA
TO BATTIGALLURU

TOTAL LENGTH OF THE BRIDGE

: 150 Metres

ESTIMATED COST:-Rs.437.00 lakhs

CONSTITUENCY

: SOMPETA

DISTRICT

: SRIKAKULAM

DETAILED PROJECT PROPOSALS

ERNMENT OF ANDHRA PRADESH


HYDERABAD

RIDGE ON MAHENDRATANAYA RIVER ON THE ROAD FROM BARUVA


TO BATTIGALLURU

ETAILED PROJECT PROPOSALS

: SOMPETA
: SRIKAKULAM

SPECIFICATION REPORT
Name of the work:-Construction of High level Bridge on Mahendratanaya River on the Road from Baruva to Battigalluru
Est.Cost:-Rs.437.00 lakhs
I.SCOPE:
The Road from Baruva to Battigalluru is an important road connecting most of the fisherman population of Sompeta Mandal to
the Mandal head quarters by shortest route.The total length of the Road is 3.00 Km.In this connection,it is to be informed that one high level
bridge is to be constructed on Mahendratanaya River to provide access to the public to Mandal head quarters.Further,the above bridge
is not only useful to the public of Sompeta Mandal,but also useful to the people of Palasa and Mandasa mandals also in view of connectivity
to NH-5 also.
There is heavy pneumatic traffic such as trucks,tractors and iron wheel vehicles,Lorries on the road .Hence,it is necessary to
provide 7.5m width bridge on Mahendratanaya River to ensure connectivity as explained above.
II.EXISTING FEATURES:
There is existing road in between BARUVA and BATTIGALLURU with a missing high level bridge on Mahendratanaya River.
Hence,one high level bridge is required.
III.PROVISIONS IN THE ESTIMATE
1.Quarry rubbish filling for embankment for a length of 200m on either side of the proposed bridge,as the side soil is not
suitable for formation of embankment.
2.Construction of high level T-beam bridge of 12 spans,each span being 13.10m with well foundations
3.Formation of Approaches&Road for a length of 200m on either side of the Bridge
IV.DESIGN CRITERIA
1.The bridge is designed as per the specifications of the IRC
2.The designs of bridge are enclosed seperately.
V.ESTIMATED AMOUNT
The estimate for construction of high level bridge along with approaches is prepared for an
amount of Rs.437.00 lakhs

Assistant Exe.Engineer
PR,Sompeta

Dy. Exe.Engineer
PR,Sompeta

Quarry Chart
Name of the work:-Construction of High level Bridge on Mahendratanaya River on the Road from
Baruva to Battigalluru

Est.Cost:Rs.437.00 lakhs

Proposed
Road

1/0
Sompeta

Baruva
1.5 km

8/6

0/0

Railway

2/3

Sand
Battigalluru

Crossing
Mahendratanaya
11/6
Ichapuram

0/0
209/2

207/2

202/0
Korlam

2.0 Km
HBG metal

J.L.Kota Quarry

&Gravel

Assistant Exe.Engineer
PR,Sompeta

Dy.Exe.Engineer
PR,Sompeta

Vizag

KEY MAP
Name of the work:-Construction of High level Bridge on Mahendratanaya River on the Road from
Baruva to Battigalluru

Est.Cost:Rs.437.00 lakhs

Proposed
Bridge

1/0
Sompeta

Baruva
1.5 km

8/6

0/0

Railway

R&B Road

2/3

Battigalluru

Crossing
Mahendratanaya
11/6
Ichapuram

NH--5

0/0
209/2

207/2

202/0
Korlam
R&B Road

P.Sasanam

Assistant Exe.Engineer
PR,Sompeta

Dy.Exe.Engineer
PR,Sompeta

Vizag

DETAILED-CUM-ABSTRACT ESTIMATE
Name of the work:-Construction of High level Bridge on the R/F Baruva to Battigalluru
Est.Cost:-Rs.437.00 lakhs
S.No

Description of item

Nos
Length

Measurements
Bredth

Quantity

Rate

Per

Amount

Depth

A)BRIDGE PROPER
1

Earth work exacavation and depositing on bank with an initial lead and lift in loamy&clayey soils
like Black Cotton soils,red earth etc complete including dewatering below low water level
for foundations of curtain walls&flexible aprons
Curtain walls

1X4

12.3

1.80

2.9

256.82Cum

1X2

21.63

6.00

519.12Cum

3.14(13.18)/4 = 10.35
(10.35+8.45-6.5) = 12.30
For flexible aprons

(8.45+2*6.59)

Approach slab

1.00Cum

123872

1X4
1X2

12.3
3.6

1.20
7.45

0.15
0.15

8.86Cum
8.05Cum

4348.96
3768.64

1.00Cum
1.00Cum

38514
30322

1.000MT

622774

Mild steel wrought and put up for well cutting edge with MS angles 2 Nos.of 100X100X12mm size and MS plate of size
200X12mm including cost and conveyance of steel to site and all labour charges for fabrication,welding,fixing in position
duly bent upto sharp,anchoring hooks,threading,bolting of all bent up rods of steining and fixing in position etc.complete
for cutting edges of well curbs under piers and abutments.
Piers
Abutments

159.64

Cement Concrete(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing charges for
Curtain walls

775.94Cum

1X11
1X2

3.14*5.15
3.14*6.65

0.0542
0.0542

VRCC(1:11/2:3) mix using 20mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing and vibrating charges but excluding cost and
fabrication charges of steel for well curbs of all wells including bailing out of water and formation
of bunds for diversion of water etc.complete

9.641MT
2.264MT
11.905MT

52312.00

S.No

Description of item

Nos
Length

Piers

Measurements
Bredth

Quantity

Rate

Per

Amount

Depth

1X11

9.218Cum

101.398Cum

1X2

16.96Cum

33.920Cum

A1=(3.14)/4 * 5.15 * 5.15 = 20.83 Sqm


A2=(3.14)/4 * 3.80 * 3.80 = 11.34 Sqm
A3=(3.14)/4 * 4.95 * 4.95 = 19.24 Sqm
V = (20.83-11.34)*0.3+(20.83-19.24)*1.15
+0.5*(19.24-11.34)*1.15
Abutments
A1=(3.14)/4 * 6.65 * 6.65 = 34.73 Sqm
A2=(3.14)/4 * 5.00 * 5.00 = 19.64 Sqm
A3=(3.14)/4 * 6.45 * 6.45 = 32.67 Sqm
V = (34.73-19.64)*0.3+(34.73-32.67)*1.45
+0.5*(32.67-19.64)*1.45
135.318Cum
5

1Cum

746519

4829.13

1Cum

5189476

VRCC(1:2:4) mix using 40mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing and vibrating charges but excluding cost and
fabrication charges of steel for well steining of all wells including bailing out of water and formation
of bunds for diversion of water etc.complete
Piers
(11.75+0.55-1.2-1.45= 9.155)

1X11

3.14*4.4

0.6

9.155

834.804Cum

Abutments
(11.75+0.55-1.2-1.75= 8.855)

1X2

3.14*5.75

0.75

8.855

239.816Cum
1074.620Cum

5516.78

VCC(1:2:4) mix using 40mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing and vibrating charges but excluding cost and
fabrication charges of steel for top plugging of all wells including bailing out of water and formation
of bunds for diversion of water etc.complete
Piers

1X11

3.14*(3.8*3.8)/4

----

0.5

62.345Cum

S.No

Description of item
Abutments

Nos
1X2

Measurements
Length
Bredth
3.14*(5.0*5.0)/4
----

Quantity
Depth
0.5

19.625Cum
81.970Cum

Rate

3659.96

Per

Amount

1Cum

300006

Well sinking in sandy and other loose soils under water either by manual labour,divers or dredgers,
weighing the top of steining to assist sinking etc.including dewatering and other incidental charges
such as hire charges for mechanical equipment etc.complete for wells of internal dia 6.5m and 5.00m
Piers
Upto 2m below GL
From 2 to 4m below GL
From 4 to 6m below GL
From 6 to 8m below GL
From 8 to 10m below GL
From 10 to 11m below GL
From 11 to 12m below GL

1X11
1X11
1X11
1X11
1X11
1X11
1X11

----------------------

----------------------

2.00m
2.00m
2.00m
2.00m
2.00m
1.00m
0.75m

22.00m
22.00m
22.00m
22.00m
22.00m
11.00m
8.25m

17907.66
21284.41
23424.05
25790.54
27995.34
28401.59
28807.84

1.00m
1.00m
1.00m
1.00m
1.00m
1.00m
1.00m

393969
468257
515329
567392
615897
312417
237665

Abutments
Upto 2m below GL
From 2 to 4m below GL
From 4 to 6m below GL
From 6 to 8m below GL
From 8 to 10m below GL
From 10 to 11m below GL
From 11 to 12m below GL

1X2
1X2
1X2
1X2
1X2
1X2
1X2

----------------------

----------------------

2.00m
2.00m
2.00m
2.00m
2.00m
1.00m
0.75m

4.00m
4.00m
4.00m
4.00m
4.00m
2.00m
1.50m

30263.95
35970.66
39586.64
43586.01
47312.12
47998.68
48685.25

1.00m
1.00m
1.00m
1.00m
1.00m
1.00m
1.00m

121056
143883
158347
174344
189248
95997
73028

4548.02

1Cum

2079762

CC(1:2:4) mix with 10% extra cement using 40mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing and vibrating charges but excluding cost and
fabrication charges of steel for bottom plugging of all wells including bailing out of water and formation
of bunds for diversion of water etc.complete
Piers
5.15-0.20=4.95,(4.95+3.80)/2 = 4.374
For Concave portion 2/3(dXd)h

1X11
1X11
1X11

3.14*(3.8*3.8)/4
3.14*(4.37*4.37)/4
2/3(4.95*4.95)

----------

0.60
1.15
0.385

74.814Cum
189.984Cum
69.213Cum

Abutments
6.65-0.20=6.45,(6.45+5.0)/2 = 5.725
For Concave portion 2/3(dXd)h

1X2
1X2
1X2

3.14*(5.0*5.0)/4
3.14*(5.73*5.73)/4
2/3(6.45*6.45)

----------

0.60
1.415
0.485

23.550Cum
72.813Cum
26.916Cum
457.290Cum

S.No
9

10

Description of item

Nos

Measurements
Length
Bredth
Depth
Sand filling in between top and bottom pluggings including cost and conveyance of all materials
and all labour charges etc.complete
Piers
Abutments

1X11
1X2

8.355
8.055

1041.780Cum
316.159Cum
1357.939Cum

Per

Amount

173.78

1Cum

235988

1X11
1X2

3.14*(5.0*5.0)/4
3.14*(8.5*8.5)/4

-------

1.2
1.2

259.050Cum
136.119Cum
395.169Cum

5516.78

1Cum

2180059

5412.78

1Cum

1272288

VRCC(1:11/2:3) Controlled concrete mix using 20mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing and vibrating charges but excluding cost and
fabrication charges of steel for piers,abutments,hammer head bed blocks and return walls including bailing
out of water and formation of bunds for diversion of water,if necessary etc.complete
Piers(3.70-1.20=2.50m)
Abutments(3.70-0.50=3.20m)
Hammer head bed blocks(Rectangular)
Hammer head bed blocks(Trapezoidal)
Return walls

12

-------

Rate

VRCC(1:11/2:3) Controlled concrete mix using 20mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing and vibrating charges but excluding cost and
fabrication charges of steel for well caps of all wells including bailing out of water and formation
of bunds for diversion of water etc.complete
Piers
Abutments

11

3.14*(3.8*3.8)/4
3.14*(5.0*5.0)/4

Quantity

1X11
1X2
1X11
1X11
1X4

3.14*(1.5*1.5)/4
8.45
6.00
(6.0+1.5)/2
3.75

---(1.0+0.9)/2
1.5
1.5
0.5

2.5
3.2
0.6
0.6
5.144

48.572Cum
51.376Cum
59.400Cum
37.125Cum
38.580Cum
235.053Cum

VRCC(1:11/2:3) Controlled concrete mix using 20mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing and vibrating charges but excluding cost and
fabrication charges of steel for bed blocks,backing walls,bearing pedastals including bailing
out of water and formation of bunds for diversion of water,if necessary etc.complete
Flywings:

1X4
1X4
1X4

0.15
1.84
0.92

(0.5+0.35)/2
0.35
0.35

2.14
0.3
1.84

0.546Cum
0.773Cum
2.370Cum

Backing wall:
Abutment caps

1X2
1X2

8.45
8.45

0.3
1.0

1.481
0.3

7.509Cum
5.070Cum

S.No

Description of item
Bearing pedastals
Pier pedastals

13

Rate

Per

Amount

6.170Cum
12.375Cum
34.812Cum

5412.78

1Cum

188431

1X6
1X80

63.00
63.00

22.00
22.00

6.10
6.10

50727.60cc
676368.00cc
727095.60cc

0.70

1.00cc

508967

1X12
1X4

41.30
5.59

---0.475

---0.275

495.600Cum
2.921Cum
498.521Cum

6585.90

1Cum

3283206

1X12
1X2

13.07
3.50

7.50
7.50

0.075
0.075

88.223Cum
3.938Cum
92.160Cum

6166.69

1Cum

568322

15.645Cum

4855.34

1Cum

75962

VRCC(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing and vibrating charges but excluding cost and
fabrication charges of steel for approach slab
Approach Slab

17

Quantity
Depth
0.15
0.5

VRCC(1:1:2) mix using 20mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing and vibrating charges but excluding cost and
fabrication charges of steel for wearing coat
Over Deck slab
Over approach

16

Measurements
Bredth
0.42
1.5

VRCC(1:11/2:3) Controlled concrete mix using 20mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing and vibrating charges but excluding cost and
fabrication charges of steel for Super structure.
Deck slab
Kerbs over fly wings

15

1X118
1X11

Length
0.83
1.5

Supplying and fixing of fully moulded type Neoprene Rubber Bearing of 500X320X84mm size
including the cost and conveyance of bearings and labour charges for fixing the same in position
confirming to specifications stipulated in specification for bridges and road works of MOST
drawings.
Abutments
Piers

14

Nos

1X2

3.50

7.45

0.300

VRCC(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing and vibrating charges but excluding cost and
fabrication charges of steel for hand rails&hand posts

S.No

Description of item
Over Deck slab
Over approach

18

Nos
1X24
1X4

Length
13.07
5.59

Measurements
Bredth
-------

Quantity
Depth
-------

313.68m
22.36m
336.04m

1X4

1X4

46.70

1Kg

8872007

3.14*(6.59*6.59)

----

1.414*0.3

57.846Cum

1358.69

1Cum

78594

100.00

5.19

0.300

622.726Cum

648.52

1Cum

403852

3.14*(6.59*6.59)

----

1.414*0.15

28.923Cum

443.31

1Cum

12822

3.15

6.25

4.270

168.131Cum

344.03

1Cum

57843

70.455Cum

1234.05

1Cum

86945

433.440Cum

724.86

1Cum

314183

Providing filter media behind abutments using 50% of 150mm size soling stone of HBG metal
and remaining 50% with 40mm size HBG metal including cost,sienorage and conveyance of all
materials including all labour charges etc.complete
Length=7.45-0.6+2(3.75-0.3) = 13.75m

24

174142

Providing gravel filling behind abutment after laying filter media including cost,sienorage and
conveyance of gravel to site including spreading,watering,rolling with hand road roller etc.complete
with 1/3rd compaction including all labour charges etc.complete
1X2

23

1.00m

Providing gravel backing 150mm thick under revetment including cost,sienorage and conveyance
of all materials to site including all labour charges etc.complete
1X4

22

518.22

Rough stone dry packing for revetment using 300mm size Rough stone including cost and conveyance of all materials and all labour
charges etc.complete.
Approaches

21

Amount

Rough stone packing for revetment with concrete grouting using CC(1:4:8) using 300mm size Rough stone including cost and conveyance of all
materials and all labour charges etc.complete
Quadrants

20

Per

Cost supply and fabrication charges of steel including cost of binding wire and all labour charges etc.complete
189995Kg

19

Rate

1X2

13.75

0.60

4.270

Providing aprons with jeddy stone of 450mm to 600mm size including cost,seinorage and
conveyance of all materials including all labour charges etc.complete
1X2

----

216.72

----

S.No

Description of item

Nos

Measurements
Bredth

Length
25

22.65
22.65

0.50
1.00

2.000
0.500

45.300Cum
22.650Cum
67.950Cum

4348.96

1Cum

295512

----

----

12Nos

869.11

1Nos

10429

----

13Nos

1598.10

1Nos

20775

-------

91.20m
42.00m
133.20m

126.62

1.00m

16866

----

----

----

Providing 100mm dia AC pipe for weep holes at 1m c/c in both horizontal and vertical
directions so that the weep holes in each horizontal row staggered from the weep holes
lying immediately above and below for abutmentys and wing walls including cost and
conveyance of AC pipe and labour charges for cutting to required length,placing the pipe
with a slope of 1:20 towards retaining face etc.complete for finished item of work
Abutments
Return walls

29

Amount

Providing expansion joints including cost and conveyance of all materials from approved
source to site fabricated with 2 Nos.MS angles of size 75X75X6mm for 7.5m 1 No.MS plate
of 140X6mm for 7.5m 200 Nos.of 12mm dia MS iron anchor bars of 30.6 Cms and
nuts including welding of MS plate and MS angles and also welding MS anchor bars and
fitting with anchor bolts and nuts including all labour charges for cutting,fixing and painting
the exposed faces of MS angles with anti corrosive paint including 4% TOT
1X13

28

Per

Supplying and fixing of GI Drainage spouts complete as per MOST specification


No.2705.
1X12

27

Rate

Cement Concrete(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing charges for Curtain walls.
1X2
1X2

26

Quantity
Depth

1X96
1X84

0.95
0.50

-------

Drilling of 150mm dia conformatory bore holes below water level in all types of soils at each
pier and abutment locations to required depth(excluding refusal strata) including transport
of boring craft and all other accessories to site,providing boring platform,drilling,insertion of
150mm dia MS casing pipe for collection of disturbed/undisturbed soil samples at 1.50m
interval or at the change strata for conducting various tests as per specifications,removing
casing pipe after completing boring works,incidental royalties etc.complete as per MOST
technical specification No.2400

S.No

Description of item

Nos
Length
1X19

30

Measurements
Bredth

15.00

----

Quantity

Rate

Per

Amount

Depth
----

285.00m

450.00

1.00m

128250

Rough stone packing for revetment with concrete grouting using CC(1:4:8) using 300mm size Rough stone
including cost and conveyance of all materials and all labour charges etc.complete for bridge approaches
1X2

100.00

3.50

0.300

210.00Cum

1358.69

4863.757Cum

292.55

1.00Cum

285324

B)Bridge approaches:31

Filling with quarry rubbish from approved quarry and carted to road
side including conveyance charges etc.complete for widening and
filling including spreading,watering and rolling with power road roller
irrespective of thickness etc.complete
As per Calculation Sheet

32

100.00

1.20

1.50

360.00Cum

55.64

1.00Cum

20030

1.20

0.30

72.00Cum

2840.65

1.00Cum

204527

(0.90+0.3)/2

1.50

180.00Cum

3166.38

1.00Cum

569948

Cement Concrete(1:4:8) mix using 40mm HBG chips including


cost and conveyance of all materials and all labour charges
including machine mixing charges
1X2

34

1422902

Earth work exacavation and depositing on the bank with an initial


lead and lift in loamy and clayey soils as per SS-20B by manual
labour for foundations
1X2

33

1.00Cum

100.00

Cement Concrete(1:3:6) mix using 40mm HBG chips including


cost and conveyance of all materials and all labour charges
including machine mixing charges
1X2

35

Provision for Caution Boards.

36

Provision for design deviation&price escalation

100.00

----------------------------- LS ------------------------------------------------------------------- LS --------------------------------------------------------

10000
3449625

S.No

Description of item

37

Provision for over heads&contractors profit

38

Provision for unforeseen items

Nos

Measurements
Quantity
Length
Bredth
Depth
------------ LS --------------------------------------------------------

Rate

Per

5691881

------------ LS --------------------------------------------------------

62246
TOTAL

Assistant Exe.Engineer
PR,Sompeta

Dy.Exe.Engineer
PR,Sompeta

Amount

43700000

LEAD STATEMENT
Name of the work:-Construction of High level Bridge on the R/F Baruva to Battigalluru
Est.Cost:- Rs.437.00 Lakhs
S.No

Description of item

Name of the quarry


MR

1
2
3
4
5
6
7
8
9

Gravel
Sand for filling
Sand for Mortar
Granite stone(225mm) for revetment
40mm HBG metal-SS5
20mm HBG metal-SS5
Quarry rubbish
Soling stone 150mm size
Jeddy stone for aprons 450 to 600mm size

J.L.Kota
Mahendratanaya
Mahendratanaya
J.L.Kota
J.L.Kota
J.L.Kota
J.L.Kota
J.L.Kota
J.L.Kota

12.00
1.20
1.20
12.00
12.00
12.00
12.00
12.00
12.00

1.Certified that the above leads are correct to the best of my knowledge

Assistant Exe.Engineer
PR,Sompeta

Dy.Exe.Engineer
PR,Sompeta

Lead in Kms
CT
Total

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

12.00
1.20
1.20
12.00
12.00
12.00
12.00
12.00
12.00

Initial
Cost

48.00
37.00
89.00
102.00
385.00
650.00
20.50
65.50
136.00

Conveyance Seinorage Blasting


charges

143.60
90.80
90.80
162.00
162.00
162.00
162.00
162.00
162.00

20.00
36.00
36.00
45.00
45.00
45.00
0.00
45.00
45.00

0.00
0.00
0.00
0.00
60.00
60.00
0.00
0.00
0.00

Machine Deduct
Total
crushing stacking
charges
0.00
0.00
0.00
0.00
0.00
162.50
0.00
0.00
0.00

(-)4.60
(-)9.20
(-)9.20
(-)15.20
(-)15.20
(-)15.20
(-)9.20
(-)15.20
(-)15.20

207.00
154.60
206.60
293.80
636.80
1064.30
173.30
257.30
327.80

DESIGN OF HIGH LEVEL BRIDGE ON THE ROAD FROM BARUVA TO BATTIGALLURU


Hydraulic Particulars:1.Maximum Flood Level

103.55m

2.Ordinary Flood level

101.11m

3.Lowest Bed level

97.01m

4.Average bed slope

0.0008

5.Rugosity Coefficient

0.03

6.Bottom of deck proposed

104.15m

7.Road Crest level

104.990m

8.Width of carriage way

7.50m

9.Catchment area

176.62SqKm

10.Dickens constant

13.00

11.Ryve's constant

6.80

Soil Particulars:0.00 to 2.00m

Silty clay

2.00 to 5.00m

Silty sand

5.00 to 7.00m

Fine sand

Above 7.00m

Coarse sand

Discharge Calculations:1)Area Velocity method:a)At the proposed bridge site:Maximum Flood level
Slope
Rugosity Coefficient
S.No

103.55m
0.0008
0.03

Chainage R.L

1
2
3
4
5
6
7
8

Hydraulic Radius

0
20
45
65
85
110
130
150

Depth of
flow
(m)

103.55
101.35
99.43
98.12
97.01
99.87
101.89
103.23

R=

0.00
2.20
1.92
1.31
1.11
2.86
2.02
1.34

Average
depth of
flow
(m)

Distance
(m)

0.00
1.10
2.06
1.61
1.21
1.99
2.44
1.68

0.00
20.00
25.00
20.00
20.00
25.00
20.00
20.00

Total area/Wetted perimeter =

Area
(Sqm)

Wetted
perimeter
(m)

0.00
22.00
51.50
32.30
24.20
49.63
48.80
33.60
262.03

0.00
20.05
25.05
20.05
20.05
25.06
20.05
20.06
150.37

1.74

Velocity V =

1/nX(R2/3XS1/2)

Discharge Q =

AXV

1.36m/sec
356.35Cumecs

b)At 400m Upstream of proposed bridge site:Maximum Flood level


Slope
Rugosity Coefficient
S.No

103.59m
0.0008
0.03

Chainage R.L

1
2
3
4
5
6
7
8

0
20
45
65
85
110
130
150

Depth of
flow
(m)

103.59
101.85
99.93
98.62
97.51
100.37
102.39
103.73

0.00
1.74
1.92
1.31
1.11
2.86
2.02
1.34

Hydraulic Radius

R=

Velocity V =

1/nX(R2/3XS1/2)

Discharge Q =

AXV

Average
depth of
flow
(m)

Distance
(m)

0.00
0.87
1.83
1.61
1.21
1.99
2.44
1.68

0.00
20.00
25.00
20.00
20.00
25.00
20.00
20.00

Area
(Sqm)

Wetted
perimeter
(m)

0.00
17.40
45.75
32.30
24.20
49.63
48.80
33.60
251.68

Total area/Wetted perimeter =

0.00
20.05
25.05
20.05
20.05
25.06
20.05
20.06
150.37

1.67
1.33m/sec
334.73Cumecs

c)At 400m Downstream of proposed bridge site:Maximum Flood level


Slope
Rugosity Coefficient
S.No

103.35m
0.0008
0.03

Chainage R.L

1
2
3
4
5
6
7
8

0
20
45
65
85
110
130
150

Depth of
flow
(m)

102.85
99.85
98.93
97.62
96.12
99.37
101.39
102.73

0.00
3.00
0.92
1.31
1.50
3.25
2.02
1.34

Hydraulic Radius

R=

Velocity V =

1/nX(R2/3XS1/2)

Discharge Q =

AXV

2)Catchment area method:-

Average
depth of
flow
(m)

Distance
(m)

0.00
1.50
1.96
1.11
1.41
2.38
2.64
1.68

0.00
20.00
25.00
20.00
20.00
25.00
20.00
20.00

Total area/Wetted perimeter =

Area
(Sqm)

Wetted
perimeter
(m)

0.00
30.00
49.00
22.30
28.10
59.38
52.70
33.60
275.08

1.83
1.41m/sec
387.86Cumecs

0.00
20.05
25.05
20.05
20.05
25.06
20.05
20.06
150.37

a)Dicken's formula:Q = CM3/4 =

629.83Cumecs

b)Ryve's formula:Q = CM2/3 =

214.43Cumecs

Maximum Discharge =

629.83Cumecs

Maximum Velocity =

1.41m/sec

Ventway Calculations(H.F.L Condition):Assuming afflux =


Width of river at H.F.L =
Clear span =
Depth of flow =

x =

0.15m
150.00m
13.30m
6.54m

di =

Head due to velocity of approach =

(Vmax2/2g)X[di/(di+x)]2

0.097m

Combined head due to Velocity of approach and


afflux

hi =

0.247m

Velocity through vents

0.90X(2ghi)1/2 =

Vv =

Linear water way required

LWW = Qd/(VvXdi) =

No.of vents required =

LWW /LC

As per the width of the river =


at H.F.L

1.98m/sec
48.61m
3.654887218
11.27819549

No.of vents to be provided

12Nos

No.of piers =

11Nos

Afflux Calculations(H.F.L Condition):Un obstructed area of cross section


Total vented area provided =

A =

262.03Sqm

No.of ventsXClear spanX(BDL-LBL) =

1139.54Sqm

Which is greater than the Un obstructed area of cross section


Using Orifice formula for calculation of discharge
Q = Co X (2g)1/2 X L X Dd X [h+(1+e)u2/2g]1/2
In the present case,
Linear water way =
L =
Un obstructed width = W =
L/W =
Corresponding to this value the coefficient Co =
Corresponding to this value the coefficient e =
Hence

159.60m
150.00m
1.064
0.89
0.6

448.61 = 0.89X4.43X69X3.7X[h+1.6u2/2g]1/2
0.198632 =

h + 0.0815u2

At just upstream of the bridge


Q = W X (Dd + h) X u
448.61 = 80X[3.70+h]u
u = 5.607/(3.70+h)
Substituting
0.1986 =

h + 0.0815[5.607/(3.70+h)]2

Solving h = 12 cm,which is already accounted for.

Scour Depth Calculations:Discharge for design of foundations =


Lacey's Silt factor for very fine silt = 1.76Xm1/2 =

1.30XMax.Discharge =

837.67Cumecs
1.5

Discharge per metre width of foundations = q =

5.249

Normal scour depth D = 1.34(q2/f)1/3 =

3.50m

Maximum scour depth Dm = 2.0XD =

7.00m

Depth of foundation = Dm + Max.of 1.2m or 1/3 Dm =

9.33m

Bottom level of foundation =

94.22m

Depth of foundation below low bed level =

2.79m

Individual well foundations are proposed due to poor bearing capacity of soil in shallow depths
The well foundations are proposed to be found at a depth of 11.75m from Lowest bed level
No launching aprons,cut off walls are proposed.

Assistant Exe.Engineer
PR,Sompeta

Dy.Exe.Engineer
PR,Sompeta

Cross section at Proposed Bridge site


104.00

103.00
102.00
101.00
100.00
99.00
98.00
97.00
96.00
95.00
0

10

20

30

40

50

60

70

80

90

100

110

120

130

Cross section at 400m U/S of the Proposed Bridge site


104.00
103.00
102.00
101.00
100.00
99.00
98.00
97.00
96.00

96.00
95.00
0

10

20

30

40

50

60

70

80

90

100

110

Cross section at 400m D/S of the Proposed Bridge site


104.00
103.00
102.00
101.00
100.00
99.00
98.00

97.00
96.00

120

130

96.00
95.00
0

10

20

30

40

50

60

70

80

90

100

110

120

130

130

140

150

130

140

150

130

140

150

Name of the Road:

CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

103.000
102.000

101.000
100.000
99.000
98.000
-6.000

-5.000

F- Level
G- Level

100.100
100.100

Sl.No.
1

Chainage
2

1
2
3
4
5
6
7

-5.670
-3.750
-1.875
0.000
1.875
3.750
5.670

-4.000

Name of the Road:

-3.000

-2.000

-1.000

0.000

1.000

2.000

3.000

102.020
100.500

102.075
102.120
102.075
101.505
101.550
101.505
CROSS SECTION AT - 0/000
Formation L. Ground Level Difference
Mean
3
4
5
6
100.100
102.020
102.075
102.120
102.075
102.020
100.100

100.100
100.500
101.505
101.550
101.505
100.300
100.100

0.000
1.520
0.570
0.570
0.570
1.720
0.000

4.000

5.000

6.000

102.020
100.300

100.100
100.100

Distance
7

Area
8

0.000
1.920
1.875
1.875
1.875
1.875
1.920

0.000
1.459
1.959
1.069
1.069
2.147
1.651
9.354

0.000
0.760
1.045
0.570
0.570
1.145
0.860

CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

104.000
103.000

102.000
101.000
100.000
99.000
-7.000 -6.000 -5.000 -4.000 -3.000 -2.000 -1.000

F- Level
G- Level

99.750
99.750

Sl.No.
1

Chainage
2

1
2
3
4
5
6
7

-6.460
-3.750
-1.875
0.000
1.875
3.750
6.310

Name of the Road:


104.000

0.000

1.000

2.000

3.000

102.460
100.100

102.515
102.560
102.515
100.955
101.000
100.955
CROSS SECTION AT - 0/020
Formation L. Ground Level Difference
Mean
3
4
5
6
99.750
102.460
102.515
102.560
102.515
102.460
99.900

99.750
100.100
100.955
101.000
100.955
100.200
99.900

0.000
2.360
1.560
1.560
1.560
2.260
0.000

0.000
1.180
1.960
1.560
1.560
1.910
1.130

CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

4.000

5.000

6.000

7.000

102.460
100.200

99.900
99.900

Distance
7

Area
8

0.000
2.710
1.875
1.875
1.875
1.875
2.560

0.000
3.198
3.675
2.925
2.925
3.581
2.893
19.197

104.000
103.000
102.000

101.000
100.000
99.000

-8

-7

-6

F- Level
G- Level

99.750
99.750

Sl.No.
1

Chainage
2

1
2
3
4
5
6
7

-6.900
-3.750
-1.875
0.000
1.875
3.750
6.950

-5

-4

-3

-1

102.900
99.950

102.955
103.000
102.955
100.255
100.300
100.255
CROSS SECTION AT - 0/040
Formation L. Ground Level Difference
Mean
3
4
5
6
99.750
102.900
102.955
103.000
102.955
102.900
99.700

Name of the Road:

-2

99.750
99.950
100.255
100.300
100.255
99.850
99.700

0.000
2.950
2.700
2.700
2.700
3.050
0.000

0.000
1.475
2.825
2.700
2.700
2.875
1.525

102.900
99.850

99.700
99.700

Distance
7

Area
8

0.000
3.150
1.875
1.875
1.875
1.875
3.200

0.000
4.646
5.297
5.063
5.063
5.391
4.880
30.339

CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

104.000
103.000
102.000
101.000

100.000
99.000
-8

-7

-6

F- Level
G- Level

101.570
101.570

Sl.No.
1

Chainage
2

1
2
3
4
5
6
7

-5.520
-3.750
-1.875
0.000
1.875
3.750
5.590

Name of the Road:


104.000
103.000
102.000

-5

-4

-3

-2

-1

103.340
102.210

103.395
103.440
103.395
102.535
102.580
102.535
CROSS SECTION AT - 0/060
Formation L. Ground Level Difference
Mean
3
4
5
6
101.570
103.340
103.395
103.440
103.395
103.340
101.500

101.570
102.210
102.535
102.580
102.535
101.920
101.500

0.000
1.130
0.860
0.860
0.860
1.420
0.000

0.000
0.565
0.995
0.860
0.860
1.140
0.710

CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

103.340
101.920

101.500
101.500

Distance
7

Area
8

0.000
1.770
1.875
1.875
1.875
1.875
1.840

0.000
1.000
1.866
1.613
1.613
2.137
1.306
9.535

102.000
101.000
100.000
99.000
98.000
-9

-8

-7

F- Level
G- Level

99.160
99.160

Sl.No.
1

Chainage
2

1
2
3
4
5
6
7

-8.370
-3.750
-1.875
0.000
1.875
3.750
8.360

Name of the Road:

-6

-5

-4

-3

-2

-1

103.780
98.410

103.835
103.880
103.835
98.805
98.850
98.805
CROSS SECTION AT - 0/080
Formation L. Ground Level Difference
Mean
3
4
5
6
99.160
103.780
103.835
103.880
103.835
103.780
99.170

99.160
98.410
98.805
98.850
98.805
98.410
99.170

0.000
5.370
5.030
5.030
5.030
5.370
0.000

0.000
2.685
5.200
5.030
5.030
5.200
2.685

103.780
98.410

99.170
99.170

Distance
7

Area
8

0.000
4.620
1.875
1.875
1.875
1.875
4.610

0.000
12.405
9.750
9.431
9.431
9.750
12.378
63.145

CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

105.000
104.000
103.000
102.000
101.000

100.000
99.000
98.000

97.000
-9

-8

-7

F- Level
G- Level

99.100
99.100

Sl.No.
1

Chainage
2

1
2
3
4
5
6
7

-8.710
-3.750
-1.875
0.000
1.875
3.750
8.660

Name of the Road:


106.000
105.000

104.000
103.000
102.000
101.000
100.000

-6

-5

-4

104.060
97.640

-3

-2

-1

104.115
104.160
104.115
98.055
98.100
98.055
CROSS SECTION AT - 0/100
Formation L. Ground Level Difference
Mean
3
4
5
6
99.100
104.060
104.115
104.160
104.115
104.060
99.150

99.100
97.640
98.055
98.100
98.055
97.460
99.150

0.000
6.420
6.060
6.060
6.060
6.600
0.000

0.000
3.210
6.240
6.060
6.060
6.330
3.300

CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

104.060
97.460

99.150
99.150

Distance
7

Area
8

0.000
4.960
1.875
1.875
1.875
1.875
4.910

0.000
15.922
11.700
11.363
11.363
11.869
16.203
78.418

100.000
99.000
98.000
97.000
96.000
-12 -11 -10

-9

F- Level
G- Level

104.990
101.215

Sl.No.
1

Chainage
2

1
2
3
4
5
6
7

-3.750
-3.750
-1.875
0.000
1.875
3.750
3.750

-8

-7

-6

-5

-4

-3

-2

-1

104.990
101.260

104.990
104.990
104.990
101.305
101.350
101.305
CROSS SECTION AT - 0/120
Formation L. Ground Level Difference
Mean
3
4
5
6
104.990
104.990
104.990
104.990
104.990
104.990
104.990

Name of the Road:

101.215
101.260
101.305
101.350
101.305
101.260
101.215

3.775
3.730
3.685
3.640
3.685
3.730
3.775

1.888
1.865
3.708
3.663
3.663
3.708
3.753

10

11

12

104.990
101.260

104.990
101.215

Distance
7

Area
8

0.000
0.000
1.875
1.875
1.875
1.875
0.000

0.000
0.000
6.952
6.867
6.867
6.952
0.000
27.638

CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

106.000
105.000
104.000
103.000
102.000

101.000
100.000

99.000
-6.000

-5.000

F- Level
G- Level

104.990
99.120

Sl.No.
1

Chainage
2

1
2
3
4
5
6
7

-3.740
-3.750
-1.875
0.000
1.875
3.750
3.750

-4.000

Name of the Road:


106.000
105.000
104.000
103.000
102.000
101.000
100.000
99.000

98.000

-3.000

104.990
99.230

-2.000

-1.000

0.000

1.000

2.000

3.000

104.990
104.990
104.990
99.340
99.430
99.340
CROSS SECTION AT - 0/140
Formation L. Ground Level Difference
Mean
3
4
5
6
104.990
104.990
104.990
104.990
104.990
104.990
104.990

99.120
99.230
99.340
99.430
99.340
99.230
99.120

5.870
5.760
5.650
5.560
5.650
5.760
5.870

2.935
2.880
5.705
5.605
5.605
5.705
5.815

CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

4.000

104.990
99.230

5.000

6.000

104.990
99.120

Distance
7

Area
8

0.000
0.010
1.875
1.875
1.875
1.875
0.000

0.000
0.029
10.697
10.509
10.509
10.697
0.000
42.441

98.000
97.000
-6.000

-5.000

F- Level
G- Level

104.990
97.430

Sl.No.
1

Chainage
2

1
2
3
4
5
6
7

-3.740
-3.750
-1.875
0.000
1.875
3.750
3.750

-4.000

-5.000

F- Level
G- Level

104.990
96.450

Sl.No.
1

Chainage
2

1
2
3
4
5
6
7

-3.740
-3.750
-1.875
0.000
1.875
3.750
3.750

-2.000

-1.000

0.000

1.000

2.000

3.000

104.990
97.650

104.990
104.990
104.990
97.890
98.120
97.890
CROSS SECTION AT - 0/160
Formation L. Ground Level Difference
Mean
3
4
5
6
104.990
104.990
104.990
104.990
104.990
104.990
104.990

Name of the Road:


106.000
105.000
104.000
103.000
102.000
101.000
100.000
99.000
98.000
97.000
96.000
-6.000

-3.000

97.430
97.650
97.890
98.120
97.890
97.650
97.430

7.560
7.340
7.100
6.870
7.100
7.340
7.560

3.780
3.670
7.220
6.985
6.985
7.220
7.450

5.000

6.000

104.990
97.650

104.990
97.430

Distance
7

Area
8

0.000
0.010
1.875
1.875
1.875
1.875
0.000

0.000
0.037
13.538
13.097
13.097
13.538
0.000
53.305

CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

-4.000

-3.000

-2.000

-1.000

0.000

1.000

2.000

3.000

104.990
96.680

104.990
104.990
104.990
96.890
97.010
96.890
CROSS SECTION AT - 0/180
Formation L. Ground Level Difference
Mean
3
4
5
6
104.990
104.990
104.990
104.990
104.990
104.990
104.990

Name of the Road:

4.000

96.450
96.680
96.890
97.010
96.890
96.680
96.450

8.540
8.310
8.100
7.980
8.100
8.310
8.540

4.270
4.155
8.205
8.040
8.040
8.205
8.425

4.000

5.000

6.000

104.990
96.680

104.990
96.450

Distance
7

Area
8

0.000
0.010
1.875
1.875
1.875
1.875
0.000

0.000
0.042
15.384
15.075
15.075
15.384
0.000
60.960

CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

106.000
105.000

104.000
103.000

102.000
101.000
100.000
99.000
-6.000

-5.000

-4.000

-3.000

-2.000

-1.000

0.000

1.000

2.000

3.000

4.000

5.000

6.000

F- Level
G- Level

104.990
99.450

Sl.No.
1

Chainage
2

1
2
3
4
5
6
7

-3.740
-3.750
-1.875
0.000
1.875
3.750
3.750

104.990
99.560

104.990
104.990
104.990
99.690
99.870
99.690
CROSS SECTION AT - 0/200
Formation L. Ground Level Difference
Mean
3
4
5
6
104.990
104.990
104.990
104.990
104.990
104.990
104.990

Name of the Road:

99.450
99.560
99.690
99.870
99.690
99.560
99.450

5.540
5.430
5.300
5.120
5.300
5.430
5.540

104.990
99.560

104.990
99.450

Distance
7

Area
8

0.000
0.010
1.875
1.875
1.875
1.875
0.000

0.000
0.027
10.059
9.769
9.769
10.059
0.000
39.683

2.770
2.715
5.365
5.210
5.210
5.365
5.485

CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

106.000
105.000
104.000
103.000
102.000
101.000
-11

-10

-9

-8

F- Level
G- Level

104.990
101.755

Sl.No.
1

Chainage
2

1
2
3
4
5
6
7

-3.750
-3.750
-1.875
0.000
1.875
3.750
3.750

Name of the Road:

-7

-6

-5

-4

-3

-2

-1

104.990
101.800

104.990
104.990
104.990
101.845
101.890
101.845
CROSS SECTION AT - 0/220
Formation L. Ground Level Difference
Mean
3
4
5
6
104.990
104.990
104.990
104.990
104.990
104.990
104.990

101.755
101.800
101.845
101.890
101.845
101.800
101.755

3.235
3.190
3.145
3.100
3.145
3.190
3.235

10

11

104.990
101.800

104.990
101.755

Distance
7

Area
8

0.000
0.000
1.875
1.875
1.875
1.875
0.000

0.000
0.000
5.939
5.855
5.855
5.939
0.000
23.588

1.618
1.595
3.168
3.123
3.123
3.168
3.213

CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

106.000

105.000

104.000

103.000

102.000
-9

F- Level
G- Level

-8

-7

104.990
103.095

-6

-5

104.990
103.140

-4

-3

-2

-1

104.990
104.990
104.990
103.185
103.230
103.185
CROSS SECTION AT - 0/240

104.990
103.140

104.990
103.095

Sl.No.
1

Chainage
2

1
2
3
4
5
6
7

-3.750
-3.750
-1.875
0.000
1.875
3.750
3.750

Name of the Road:

Formation L. Ground Level


3
4
104.990
104.990
104.990
104.990
104.990
104.990
104.990

103.095
103.140
103.185
103.230
103.185
103.140
103.095

Difference
5

Mean
6

Distance
7

Area
8

1.895
1.850
1.805
1.760
1.805
1.850
1.895

0.947
0.925
1.827
1.782
1.782
1.827
1.873

0.000
0.000
1.875
1.875
1.875
1.875
0.000

0.000
0.000
3.427
3.342
3.342
3.427
0.000
13.537

CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

105.000

104.000
103.000
102.000
101.000
100.000
99.000
98.000
-9

-8

-7

F- Level
G- Level

101.490
101.490

Sl.No.
1

Chainage
2

1
2
3
4
5
6
7

-6.900
-3.750
-1.875
0.000
1.875
3.750
6.910

Name of the Road:

-6

-5

-4

-3

-2

-1

104.640
102.030

104.695
104.740
104.695
102.480
103.130
102.580
CROSS SECTION AT - 0/260
Formation L. Ground Level Difference
Mean
3
4
5
6
101.490
104.640
104.695
104.740
104.695
104.640
101.480

101.490
102.030
102.480
103.130
102.580
102.230
101.480

0.000
2.610
2.215
1.610
2.115
2.410
0.000

104.640
102.230

101.480
101.480

Distance
7

Area
8

0.000
3.150
1.875
1.875
1.875
1.875
3.160

0.000
4.111
4.523
3.586
3.492
4.242
3.808
23.762

0.000
1.305
2.413
1.913
1.863
2.262
1.205

CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

105.000
104.000
103.000
102.000
101.000
100.000
-9

-8

-7

F- Level
G- Level

101.010
101.010

Sl.No.
1

Chainage
2

-6

-5

104.140
101.550

-4

-3

-2

-1

104.195
104.240
104.195
102.000
102.650
102.100
CROSS SECTION AT - 0/280
Formation L. Ground Level Difference
Mean
3
4
5
6

104.140
101.750

Distance
7

101.000
101.000
Area
8

1
2
3
4
5
6
7

-6.880
-3.750
-1.875
0.000
1.875
3.750
6.890

101.010
104.140
104.195
104.240
104.195
104.140
101.000

Name of the Road:

101.010
101.550
102.000
102.650
102.100
101.750
101.000

0.000
2.590
2.195
1.590
2.095
2.390
0.000

0.000
1.295
2.392
1.892
1.842
2.242
1.195

0.000
3.130
1.875
1.875
1.875
1.875
3.140

0.000
4.053
4.486
3.548
3.455
4.205
3.752
23.499

CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

105.000
104.000
103.000
102.000
101.000
100.000

-8

-7

-6

F- Level
G- Level

101.480
101.480

Sl.No.
1

Chainage
2

1
2
3
4
5
6
7

-5.910
-3.750
-1.875
0.000
1.875
3.750
5.920

-5

-4

-3

-2

-1

103.640
102.020

103.695
103.740
103.695
102.470
103.120
102.570
CROSS SECTION AT - 0/300
Formation L. Ground Level Difference
Mean
3
4
5
6
101.480
103.640
103.695
103.740
103.695
103.640
101.470

Name of the Road:

101.480
102.020
102.470
103.120
102.570
102.220
101.470

0.000
1.620
1.225
0.620
1.125
1.420
0.000

0.000
0.810
1.422
0.922
0.872
1.272
0.710

103.640
102.220

101.470
101.470

Distance
7

Area
8

0.000
2.160
1.875
1.875
1.875
1.875
2.170

0.000
1.750
2.667
1.730
1.636
2.386
1.541
11.709

CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

105.000
104.000
103.000

102.000
101.000
100.000
-6.000

-5.000

F- Level
G- Level

101.030
101.030

Sl.No.
1

Chainage
2

1
2
3

-5.860
-3.750
-1.875

-4.000

-3.000

-2.000

-1.000

0.000

1.000

2.000

103.140
101.570

103.195
103.240
103.195
102.020
102.670
102.120
CROSS SECTION AT - 0/320
Formation L. Ground Level Difference
Mean
3
4
5
6
101.030
103.140
103.195

101.030
101.570
102.020

0.000
1.570
1.175

0.000
0.785
1.373

3.000

4.000

5.000

6.000

103.140
101.770

101.020
101.020

Distance
7

Area
8

0.000
2.110
1.875

0.000
1.656
2.573

4
5
6
7

0.000
1.875
3.750
5.870

103.240
103.195
103.140
101.020

Name of the Road:

102.670
102.120
101.770
101.020

0.570
1.075
1.370
0.000

0.872
0.822
1.222
0.685

1.875
1.875
1.875
2.120

1.636
1.542
2.292
1.452
11.152

CONS. OF HIGH LEVEL BRIDGE ON MAHENDRATANAYA RIVER

105.000
104.000
103.000
102.000

101.000
100.000
-6.000

-5.000

F- Level
G- Level

100.730
100.730

Sl.No.
1

Chainage
2

1
2
3
4
5
6
7

-5.660
-3.750
-1.875
0.000
1.875
3.750
5.670

-4.000

-3.000

-2.000

-1.000

0.000

1.000

2.000

102.640
101.270

102.695
102.740
102.695
101.720
102.370
101.820
CROSS SECTION AT - 0/350
Formation L. Ground Level Difference
Mean
3
4
5
6
100.730
102.640
102.695
102.740
102.695
102.640
100.720

100.730
101.270
101.720
102.370
101.820
101.470
100.720

0.000
1.370
0.975
0.370
0.875
1.170
0.000

0.000
0.685
1.172
0.672
0.622
1.022
0.585

3.000

4.000

5.000

6.000

102.640
101.470

100.720
100.720

Distance
7

Area
8

0.000
1.910
1.875
1.875
1.875
1.875
1.920

0.000
1.308
2.198
1.261
1.167
1.917
1.123
8.975

104.74

*-

ABSTRACT QUANTITY OF QUARRY RUBBISH FOR APPROACHES


Name of the Work: Construction of High level Bridge on the R/F Baruva to Battigalluru
Sl.No.
1

Chainage
2

Area
3

Mean
4

Distance
5

Quantity
6

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

0
20
40
60
80
100
120
140
160
180
200
220
240
260
280
300
320
350

9.354
19.197
30.339
9.535
63.145
78.418
27.638
42.441
53.305
60.960
39.683
23.588
13.537
23.762
23.499
11.709
11.152
8.975

0.000
14.275
24.768
19.937
36.340
70.782
53.028
35.039
47.873
57.133
50.322
31.635
18.563
18.650
23.631
17.604
11.431
10.064

0.00
20.00
20.00
20.00
20.00
20.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
20.00
20.00
20.00
30.00

0.000
285.510
495.356
398.733
726.796
1415.634
0.000
0.000
0.000
0.000
0.000
0.000
0.000
186.499
472.617
352.084
228.613
301.914

TOTAL QUANTITY

4863.76Cum

NOTE:-As the side earth is not suitable for formation of embankment,quarry rubbish is proposed.

Asst.Executive Engineer
PR,Sompeta

Dy.Exe.Engineer
PR,Sompeta

Total Quantity of Earth work

9727.515

(0/0 - 7/8) = 7800 X 4 X 0.2


(0/0 - 7/8) = 7800 X 3.75 X 0.17
(0/0 - 7/8) = 7800 X 2 X 0.10

-6240.000
-4972.500
-1560.000

Deduct Crust Portion


GSB
WBM Base+B.T
Gravel Shoulders

Deduct Quarry Rubbish Quantity


(From 0/0 to 4/0 as side earth is not suitable for widening Etc.)

-16132.402

Earth work Quantity

Asst. Exe.Engineer
PR,Ichapuram

Deputy Exe.Engineer
PR,Ichapuram

-19177.387

Executive Engineer
PR,Tekkali

BBISH FOR APPROACHES

he R/F Baruva to Battigalluru


Remarks
7

nkment,quarry rubbish is proposed.

Superintending Engineer
PR,Srikakulam

DATA SHEET
Name of the work:-Construction of High level Bridge on the R/F Baruva to Battigalluru
Est.Cost:- Rs.437.00 lakhs
S.No Quantity
1

Description

Cement Mortor
1.00Cum Cost of sand
5800/1MT Cost of SR Cement
1.00Cum Mixing charges

Amount

(1:3)

(1:5)

(1:6)

206.60
2784.00
19.00
3009.60

206.60
1670.40
19.00
1896.00

206.60
1392.00
19.00
1617.60

Cost of 40mm HBG metal


Cost of sand
Cost of SR cement
Labour charges
Centring charges
Machine mixing charges
Add VAT@4%

636.80
206.60
5800.00
449.20
601.00
37.50

1Cum 585.86
1Cum 95.04
1000Kg 1276.00
1Cum 449.20
1Cum 601.00
1Cum 37.50
121.78
3166.38

Cement Concrete(1:4:8) mix using 40mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing charges
0.92Cum
0.46Cum
166.00Kg
1.00Cum
1.00Cum
1.00Cum

Per

Cement Concrete(1:3:6) mix using 40mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing charges
0.92Cum
0.46Cum
220.00Kg
1.00Cum
1.00Cum
1.00Cum

Rate

Cost of 40mm HBG metal


Cost of sand
Cost of SR cement
Labour charges
Centring charges
Machine mixing charges
Add VAT@4%

636.80
206.60
5800.00
449.20
601.00
37.50

1Cum
1Cum
1000Kg
1Cum
1Cum
1Cum

585.86
95.04
962.80
449.20
601.00
37.50
109.26
2840.65

Cement Concrete(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing charges
0.92Cum
0.46Cum
331.00Kg
1.00Cum
1.00Cum

Cost of 20mm HBG chips


Cost of sand
Cost of SR cement
Labour charges
Machine mixing charges
Add VAT@4%

1064.30
206.60
5800.00
449.20
37.50

1Cum 979.16
1Cum 95.04
1000Kg 1919.80
1Cum 449.20
1Cum 37.50
139.23
3619.92

S.No Quantity
Description
Rate
Per
Amount
5 Sand filling in foundations including watering and ramming including cost and conveyance of all materials
and all labour charges etc.complete
1.00Cum Cost of sand
154.60
1Cum 154.60
1.00Cum Labour charges
12.50
1Cum 12.50
Add VAT@4%
6.68
173.78
6

Granite stone dry packing for revetment using 300mm size Rough stone including cost and conveyance of all materials and all labour charges etc.complete.
1.10Cum Rough stone 300m for revetment
293.80
1Cum 323.18
1.00Cum Labour charges
1Cum 300.40
300.40
Add VAT@4%
24.94
648.52

Ganite stone packing for revetment with concrete grouting using CC(1:4:8) using 300mm size Rough stone including cost and conveyance of all materials and all labour charges
etc.complete.
1.10Cum Rough stone 300m for revetment
293.80
1Cum
323.18
1.00Cum Labour charges
1Cum
300.40
300.40
0.25Cum CC(1:4:8)
2731.39
1Cum
682.85
Add VAT@4%
52.26
1358.69

VRCC(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing and vibrating charges but excluding cost and
fabrication charges of steel for bed blocks of culverts
0.92Cum
0.46Cum
331.00Kg
1.00Cum
1.00Cum
1.00Cum
1.00Cum

Cost of 20mm HBG chips


Cost of sand
Cost of SR cement
Labour charges
Machine mixing charges
Centring charges
Vibrating Charges
Add VAT@4%

1064.30
206.60
5800.00
794.40
37.50
679.00
38.50

1Cum 979.16
1Cum 95.04
1000Kg 1919.80
1Cum 794.40
1Cum 37.50
1Cum 679.00
1Cum 38.50
181.74
4725.13

VRCC(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing and vibrating charges but excluding cost and
fabrication charges of steel for deck slab of culverts
0.92Cum
0.46Cum
331.00Kg
1.00Cum
1.00Cum
1.00Cum
1.00Cum

Cost of 20mm HBG chips


Cost of sand
Cost of SR cement
Labour charges
Machine mixing charges
Centring charges
Vibrating Charges
Add VAT@4%

1064.30
206.60
5800.00
794.40
37.50
1430.00
38.50

1Cum 979.16
1Cum 95.04
1000Kg 1919.80
1Cum 794.40
1Cum 37.50
1Cum 1430.00
1Cum 38.50
211.78
5506.17

S.No Quantity

Description

Rate

Per

Amount

10 Collection and supply of Quarry Rubbish from the approved quarry and stacking at the site including conveyance charges etc.complete for widening and
filling including spreading,watering and rolling with power road roller of 8-10 Tonnes capacity including the hire charges of PRR
1.50Cum Cost of Quarry Rubbish
1.00Cum Labour charges for filling
1.00Cum Rolling charges with PRR
Add VAT@4%

173.30
12.50
88.50

1Cum
1Cum
10Cum

259.95
12.50
8.85
11.25
292.55

11 Earth work exacavation and depositing on bank with an initial lead and lift in loamy&clayey soils
like Black Cotton soils,red earth etc complete
Manual
1.00Cum Earth work exacavation
1.00Cum Seinorage Charges
Add VAT@4%

33.50
20.00

1.00Cum
1.00Cum

33.50
20.00
2.14
55.64

13.00
20.00

Machinery
1.00Cum
1.00Cum

12 Cost supply and fabrication charges of steel including cost of binding wire and all labour charges etc.complete
1.00Kg Cost and supply of Fe415 Steel
1.00Kg Fabrication charges
Add VAT@4%

38.90
6.00

1.00Kg
1.00Kg
TOTAL

38.90
6.00
1.80
46.70

Bridge Data:13 Earth work exacavation and depositing on bank with an initial lead and lift in loamy&clayey soils
like Black Cotton soils,red earth etc complete including dewatering below low water level
Manual
1.00Cum Earth work exacavation
1.00Cum Seinorage Charges
1.00Cum Dewatering charges
Add VAT@4%

33.50
20.00
100.00

1.00Cum
1.00Cum
1.00Cum

33.50
20.00
100.00
6.14
159.64

14 Cement Concrete(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing charges for
CC(1:2:4) for approach slab
0.92Cum
0.46Cum
331.00Kg
1.00Cum
1.00Cum
1.00Cum

Cost of 20mm HBG chips


Cost of sand
Cost of SR cement
Labour charges
Machine mixing charges
Centring charges

1064.30
206.60
5800.00
449.20
37.50
143.00

1Cum 979.16
1Cum 95.04
1000Kg 1919.80
1Cum 449.20
1Cum 37.50
1Cum 143.00

13.00
20.00
0.66
33.66

S.No Quantity

15

Description
Add VAT@4%

Rate

Per

Amount
144.95
3768.64

CC(1:2:4) for curtain walls


0.92Cum
0.46Cum
331.00Kg
1.00Cum
1.00Cum
1.00Cum
1.00Cum

Cost of 20mm HBG chips


Cost of sand
Cost of SR cement
Labour charges
Machine mixing charges
Centring charges
Bailing out of water
Add VAT@4%

1064.30
206.60
5800.00
449.20
37.50
601.00
100.00

1Cum 979.16
1Cum 95.04
1000Kg 1919.80
1Cum 449.20
1Cum 37.50
1Cum 601.00
1.00Cum 100.00
167.27
4348.96

16 Mild steel wrought and put up for well cutting edge with MS angles 2 Nos.of 100X100X12mm size and MS plate of size
200X12mm including cost and conveyance of steel to site and all labour charges for fabrication,welding,fixing in position
duly bent upto sharp,anchoring hooks,threading,bolting of all bent up rods of steining and fixing in position etc.complete
for cutting edges of well curbs under piers and abutments.
1.00MT Cost and supply of MS angles
1.00MT Fabrication charges
Add MBA@20%
Add VAT@4%

38900.00
9500.00

1.00MT 38900.00
1.00MT 9500.00
1900.00
2012.00
TOTAL
52312.00

17 VRCC(1:11/2:3) mix using 20mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing and vibrating charges but excluding cost and
fabrication charges of steel for well curbs of all wells including bailing out of water and formation
of bunds for diversion of water etc.complete
VRCC(1:11/2:3) for well curbs
0.92Cum
0.46Cum
445.00Kg
1.00Cum
1.00Cum
1.00Cum
1.00Cum
1.00Cum

Cost of 20mm HBG chips


Cost of sand
Cost of SR cement
Labour charges
Machine mixing charges
Centring charges
Vibrating Charges
Bailing out of water
Add VAT@4%

1064.30
206.60
5800.00
794.40
37.50
679.00
38.50
100.00

1Cum 979.16
1Cum 95.04
1000Kg 2581.00
1Cum 794.40
1Cum 37.50
1Cum 679.00
1Cum 38.50
1Cum 100.00
212.18
5516.78

18 VRCC(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing and vibrating charges but excluding cost and
fabrication charges of steel for well steining of all wells including bailing out of water and formation
of bunds for diversion of water etc.complete

S.No Quantity

0.92Cum
0.46Cum
331.00Kg
1.00Cum
1.00Cum
1.00Cum
1.00Cum
1.00Cum

Description
VRCC(1:2:4) for well steining
Cost of 20mm HBG chips
Cost of sand
Cost of SR cement
Labour charges
Machine mixing charges
Centring charges
Vibrating Charges
Bailing out of water
Add VAT@4%

Rate

Per

1064.30
206.60
5800.00
794.40
37.50
679.00
38.50
100.00

Amount

1Cum 979.16
1Cum 95.04
1000Kg 1919.80
1Cum 794.40
1Cum 37.50
1Cum 679.00
1Cum 38.50
1Cum 100.00
185.74
4829.13

19 VCC(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing and vibrating charges but excluding cost and
fabrication charges of steel for top plugging of all wells including bailing out of water and formation
of bunds for diversion of water etc.complete
VCC(1:2:4) for top plugging of well
0.92Cum
0.46Cum
331.00Kg
1.00Cum
1.00Cum
1.00Cum

Cost of 20mm HBG chips


Cost of sand
Cost of SR cement
Labour charges
Machine mixing charges
Vibrating Charges
Add VAT@4%

1064.30
206.60
5800.00
449.20
37.50
38.50

1Cum 979.16
1Cum 95.04
1000Kg 1919.80
1Cum 449.20
1Cum 37.50
1Cum 38.50
140.77
3659.96

20 Well sinking in sandy and other loose soils under water either by manual labour,divers or dredgers,
weighing the top of steining to assist sinking etc.including dewatering and other incidental charges
such as hire charges for mechanical equipment etc.complete for wells upto 4m internal dia
4.00m internal dia

5.00m internal dia

6.50m internal dia

1.00m

Upto 2m below GL
Add VAT@4%
Total

11020.10

1.00m

11020.10
440.80
11460.90

17218.9

1.00m

17218.91 29099.95
688.76
17907.66

1.00m

29099.95
1164.00
30263.95

1.00m

From 2 to 4m below GL
Add VAT@4%
Total

13098.10

1.00m

13098.10
523.92
13622.02

20465.8

1.00m

20465.78 34587.17
818.63
21284.41

1.00m

34587.17
1383.49
35970.66

1.00m

From 4 to 6m below GL
Add VAT@4%
Total

14414.80

1.00m

14414.80
576.59
14991.39

22523.1

1.00m

22523.13 38064.08
900.93
23424.05

1.00m

38064.08
1522.56
39586.64

1.00m

From 6 to 8m below GL
Add VAT@4%

15871.10

1.00m

15871.10
634.84

24798.6

1.00m

24798.59 41909.62
991.94

1.00m

41909.62
1676.38

S.No Quantity

Description
Total

Rate

Per

Amount
16505.94

25790.54

43586.01

1.00m

From 8 to 10m below GL


Add VAT@4%
Total

17227.90

1.00m

17227.90
689.12
17917.02

26918.6

1.00m

26918.59 45492.42
1076.74
27995.34

1.00m

45492.42
1819.70
47312.12

1.00m

From 10 to 11m below GL


Add VAT@4%
Total

17477.90

1.00m

17477.90
699.12
18177.02

27309.2

1.00m

27309.22 46152.58
1092.37
28401.59

1.00m

46152.58
1846.10
47998.68

1.00m

From 11 to 12m below GL


Add VAT@4%
Total

17727.90

1.00m

17727.90
709.12
18437.02

27699.8

1.00m

27699.84 46812.74
1107.99
28807.84

1.00m

46812.74
1872.51
48685.25

21 CC(1:2:4) mix with 10% extra cement using 20mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing and vibrating charges but excluding cost and
fabrication charges of steel for bottom plugging of all wells including bailing out of water and formation
of bunds for diversion of water etc.complete
CC(1:2:4) for bottom plugging of wells
0.92Cum
0.46Cum
364.00Kg
1.00Cum
1.00Cum
1.00Cum
1.00Cum

Cost of 20mm HBG chips


Cost of sand
Cost of SR cement
Labour charges
Machine mixing charges
Centring charges
Bailing out of water
Add VAT@4%

1064.30
206.60
5800.00
449.20
37.50
601.00
100.00

1Cum 979.16
1Cum 95.04
1000Kg 2111.20
1Cum 449.20
1Cum 37.50
1Cum 601.00
1Cum 100.00
174.92
4548.02

22 Sand filling in between top and bottom pluggings including cost and conveyance of all materials
and all labour charges etc.complete
Sand filling
1.00Cum Cost of sand
154.60
1Cum 154.60
1.00Cum Labour charges
12.50
1Cum 12.50
Add VAT@4%
6.68
173.78
23 VRCC(1:11/2:3) Controlled concrete mix using 20mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing and vibrating charges but excluding cost and
fabrication charges of steel for well caps of all wells including bailing out of water and formation
of bunds for diversion of water etc.complete
VRCC(1:11/2:3) for well caps
0.92Cum Cost of 20mm HBG chips
0.46Cum Cost of sand
445.00Kg Cost of SR cement

1064.30
206.60
5800.00

1Cum 979.16
1Cum 95.04
1000Kg 2581.00

S.No Quantity
1.00Cum
1.00Cum
1.00Cum
1.00Cum
1.00Cum

Description
Labour charges
Machine mixing charges
Centring charges
Vibrating Charges
Bailing out of water
Add VAT@4%

Rate
794.40
37.50
679.00
38.50
100.00

Per
1Cum
1Cum
1Cum
1Cum
1Cum

Amount
794.40
37.50
679.00
38.50
100.00
212.18
5516.78

24 VRCC(1:11/2:3) Controlled concrete mix using 20mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing and vibrating charges but excluding cost and
fabrication charges of steel for piers,abutments,hammer head bed blocks and return walls including bailing
out of water and formation of bunds for diversion of water,if necessary etc.complete
VRCC(1:11/2:3) for Piers,abutments etc.
0.92Cum
0.46Cum
445.00Kg
1.00Cum
1.00Cum
1.00Cum
1.00Cum

Cost of 20mm HBG chips


Cost of sand
Cost of SR cement
Labour charges
Machine mixing charges
Centring charges
Vibrating Charges
Add VAT@4%

1064.30
206.60
5800.00
794.40
37.50
679.00
38.50

1Cum 979.16
1Cum 95.04
1000Kg 2581.00
1Cum 794.40
1Cum 37.50
1Cum 679.00
1Cum 38.50
208.18
5412.78

25 VRCC(1:11/2:3) Controlled concrete mix using 20mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing and vibrating charges but excluding cost and
fabrication charges of steel for bed blocks,backing walls,bearing pedastals including bailing
out of water and formation of bunds for diversion of water,if necessary etc.complete
VRCC(1:11/2:3) for bed blocks,backing walls etc.

0.92Cum
0.46Cum
445.00Kg
1.00Cum
1.00Cum
1.00Cum
1.00Cum

Cost of 20mm HBG chips


Cost of sand
Cost of SR cement
Labour charges
Machine mixing charges
Centring charges
Vibrating Charges
Add VAT@4%

1064.30
206.60
5800.00
794.40
37.50
679.00
38.50

1Cum 979.16
1Cum 95.04
1000Kg 2581.00
1Cum 794.40
1Cum 37.50
1Cum 679.00
1Cum 38.50
208.18
5412.78

26 Supplying and fixing of fully moulded type Neoprene Rubber Bearing of 500X320X84mm size
including the cost and conveyance of bearings and labour charges for fixing the same in position
confirming to specifications stipulated in specification for bridges and road works of MOST
drawings.
13440 50*32*8.4cc provisional rate
Add VAT@4%

1.30

1.00cc

17472.00
698.88

S.No Quantity

Description

Rate

Per

Amount
18170.88

27 VRCC(1:11/2:3) Controlled concrete mix using 20mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing and vibrating charges but excluding cost and
fabrication charges of steel for Beams of bridge.
VRCC(1:11/2:3) for Beams
0.92Cum
0.46Cum
445.00Kg
1.00Cum
1.00Cum
1.00Cum
1.00Cum

Cost of 20mm HBG chips


Cost of sand
Cost of SR cement
Labour charges
Machine mixing charges
Centring charges
Vibrating Charges
Add VAT@4%

1064.30
206.60
5800.00
794.40
37.50
1807.00
38.50

1Cum 979.16
1Cum 95.04
1000Kg 2581.00
1Cum 794.40
1Cum 37.50
1Cum 1807.00
1Cum 38.50
253.30
6585.90

28 VRCC(1:11/2:3) Controlled concrete mix using 20mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing and vibrating charges but excluding cost and
fabrication charges of steel for deck slab of bridge.
VRCC(1:11/2:3) for deck slab of bridge
0.92Cum
0.46Cum
445.00Kg
1.00Cum
1.00Cum
1.00Cum
1.00Cum

Cost of 20mm HBG chips


Cost of sand
Cost of SR cement
Labour charges
Machine mixing charges
Centring charges
Vibrating Charges
Add MBA@20%
Add VAT@4%

1064.30
206.60
5800.00
794.40
37.50
1430.00
38.50

1Cum 979.16
1Cum 95.04
1000Kg 2581.00
1Cum 794.40
1Cum 37.50
1Cum 1430.00
1Cum 38.50
158.88
244.58
6359.05

29 VRCC(1:1:2) mix using 20mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing and vibrating charges but excluding cost and
fabrication charges of steel for wearing coat
VRCC(1:1:2) for wearing coat
0.92Cum
0.46Cum
662.40Kg
1.00Cum
1.00Cum
1.00Cum
1.00Cum

Cost of 20mm HBG chips


Cost of sand
Cost of SR cement
Labour charges
Machine mixing charges
Centring charges
Vibrating Charges
Add VAT@4%

1064.30
206.60
5800.00
794.40
37.50
143.00
38.50

1Cum 979.16
1Cum 95.04
1000Kg 3841.92
1Cum 794.40
1Cum 37.50
1Cum 143.00
1Cum 38.50
237.18

S.No Quantity

Description

Rate

Per

Amount
6166.69

30 VRCC(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing and vibrating charges but excluding cost and
fabrication charges of steel for approach slab
VRCC(1:2:4) for approach slab
0.92Cum
0.46Cum
445.00Kg
1.00Cum
1.00Cum
1.00Cum
1.00Cum

Cost of 20mm HBG chips


Cost of sand
Cost of SR cement
Labour charges
Machine mixing charges
Centring charges
Vibrating Charges
Add VAT@4%

1064.30
206.60
5800.00
794.40
37.50
143.00
38.50

1Cum 979.16
1Cum 95.04
1000Kg 2581.00
1Cum 794.40
1Cum 37.50
1Cum 143.00
1Cum 38.50
186.74
4855.34

31 VRCC(1:2:4) mix using 20mm HBG chips including cost and conveyance of all materials
and all labour charges including machine mixing and vibrating charges but excluding cost and
fabrication charges of steel for hand rails&hand posts
VRCC(1:2:4) for hand rails and hand posts
0.92Cum
0.46Cum
445.00Kg
1.00Cum
1.00Cum
1.00Cum
1.00Cum

Cost of 20mm HBG chips


Cost of sand
Cost of SR cement
Labour charges
Machine mixing charges
Centring charges
Vibrating Charges
Add VAT@4%

1064.30
206.60
5800.00
794.40
37.50
1987.00
38.50

Per RM

1Cum 979.16
1Cum 95.04
1000Kg 2581.00
1Cum 794.40
1Cum 37.50
1Cum 1987.00
1Cum 38.50
260.50
6773.10
518.22

32 Providing gravel backing 150mm thick under revetment including cost,sienorage and conveyance
of all materials to site including all labour charges etc.complete
1.18Cum Cost of gravel
0.70Cum Man Mazdoor
0.70Cum Woman Mazdoor
Add VAT@4%

207.00
130.00
130.00

1Cum
1Cum
1Cum

244.26
91.00
91.00
17.05
443.31

33 Providing gravel filling behind abutment after laying filter media including cost,sienorage and
conveyance of gravel to site including spreading,watering,rolling with hand road roller etc.complete
with 1/3rd compaction including all labour charges etc.complete

S.No Quantity
Description
1.50Cum Cost of gravel
1.00Cum Spreading,watering and rolling
Add VAT@4%

Rate
207.00
203.00

Per
1Cum
10Cum

Amount
310.50
20.30
13.23
344.03

34 Providing aprons with jeddy stone of 450mm to 600mm size including cost,seinorage and
conveyance of all materials including all labour charges etc.complete
1.10Cum Cost of Jeddy stone
1.00Cum Labour charges
Add VAT@4%

327.80
336.40

1Cum
1Cum

360.58
336.40
27.88
724.86

35 Supplying and fixing of GI Drainage spouts complete as per MOST specification


No.2705.
1No MS grating 260X260mm at site
1No 100mm dia GI pipe 1Rmt
0.10Kg Cost of anti corrosive paint
Add VAT@4%

92.00
782.30
325.00

1No
1No
1Kg

92.00
711.18
32.50
33.43
869.11

36 Providing expansion joints including cost and conveyance of all materials from approved
source to site fabricated with 2 Nos.MS angles of size 75X75X6mm for 7.5m 1 No.MS plate
of 140X6mm for 7.5m 200 Nos.of 12mm dia MS iron anchor bars of 30.6 Cms and
nuts including welding of MS plate and MS angles and also welding MS anchor bars and
fitting with anchor bolts and nuts including all labour charges for cutting,fixing and painting
the exposed faces of MS angles with anti corrosive paint including 4% TOT
1Rmt Provisional rate

1598.10

1Rmt 1598.10

37 Providing 100mm dia AC pipe for weep holes at 1m c/c in both horizontal and vertical
directions so that the weep holes in each horizontal row staggered from the weep holes
lying immediately above and below for abutmentys and wing walls including cost and
conveyance of AC pipe and labour charges for cutting to required length,placing the pipe
with a slope of 1:20 towards retaining face etc.complete for finished item of work
1Rmt Cost of 100m AC pipe Cl-15
Add CED@12%
Add VAT@4%
Add Conveyance @6%
Add for cutting&positioning

102.09

1Rmt

102.09
12.25
4.57
6.13
1.58
126.62

38 Drilling of 150mm dia conformatory bore holes below water level in all types of soils at each
pier and abutment locations to required depth(excluding refusal strata) including transport
of boring craft and all other accessories to site,providing boring platform,drilling,insertion of
150mm dia MS casing pipe for collection of disturbed/undisturbed soil samples at 1.50m
interval or at the change strata for conducting various tests as per specifications,removing

S.No Quantity
Description
Rate
Per
Amount
casing pipe after completing boring works,incidental royalties etc.complete as per MOST
technical specification No.2400
1Rmt Provisional rate

Assistant Exe.Engineer
PR,Sompeta

450.00

1Rmt

450.00

Dy.Exe.Engineer
PR,Sompeta