5.Prepareamethodstatement(TabularFormat)forasmallthree(3)bedroombungalow.

METHODSTATEMENT
CONTRACT:CONSTRUCTIONOFATHREEBEDROOMBUNGALOW DATE:30THMARCH,2013SHEETNO.1OF2 BY:WISDOMKWAMEAGBOZO(20281748) S/No OPERATIONS Q'TY METHOD RESOURCES PLANT LABOUR OUTPUT CONSTANT DURATION REMARKS

SUBSTRUCTURE 1 CLEARSITEVEGETATION 720m2 Clearsitevegetationusingadozer.Load clearedvegetationintolorriesandcart CATDozer,D6 awaytotip Excavateusingdozer.Pushexcavated material15mawayfromexcavations Excavatefoundationsmanuallyusingpick axesandshovels Loadexcavatedmaterialusingshovels intobarrowsandcartawaytotip10m awayfromexcavations Loadexcavatedmaterialusingshovels intobarrowsandcartawaytotip5km awayfromsite Mixconcretetorequiredspecification usingamixeranddischargeinto foundationswiththeaidofbucketsor headpans Markoutandcutmildsteel reinforcement,bendintorequiredshape andfixinplacewiththeaidofbinding wires Mixconcretetorequiredspecification usingamixeranddischargeinto foundationswiththeaidofbucketsor headpans Markoutthepositionofblockworkon thesurfaceoffoundation.Mixmortar usingconcretemixerandlayblocks Measureandmarkouttheshapeofthe formworkontimberboardsandcutout. Oilthesurfacesoftheboardtoreceived concreteandfixintoposition Mixconcretetorequiredspecification usingamixeranddischargeinto Concrete formworkwiththeaidofbucketsor mixer headpansandvibrateusingapoker vibrator Fillexcavationswithmaterialarisingfrom excavationsusingshovelsandpickaxes. Plate Compactfilledsurfaceswithaplate Compactor compactor Filltomakeuplevelswithmaterial obtainedoffsiteusingshovels.Compact filledsurfaceswithaplatecompactor Measureandmarkouttheshapeofthe formworkontimberboardsandcutout. Oilthesurfacesoftheboardtoreceived concreteandfixintoposition Mixconcretetorequiredspecification usingamixeranddischargeinto formworkwiththeaidofbucketsor headpansandvibrateusingapoker vibrator Plate Compactor Concrete mixer CATDozer,D6 1Banksman 500m2/day 1.44

2 3 4

EXCAVATIONTOPSOIL EXCAVATEPITSANDTRENCHES DISPOSALOFEXCAVATEDMATERIALONSITE

500m

1Banksman 10Labourers

2/ 500m day

1 5.33 3.58

96m3 96m
3

1.8m3/manday 2.68m3/manday 5m3tippertruck with5manday loadinggang

Barrow

10Labourers

DISPOSALOFEXCAVATEDMATERIALOFFSITE

36m

Tippertruck

5Labourers

INSITUCONCRETEINFOUNDATION (BLINDING)

1.5m

Concrete mixer

1operator, 2masons,2 2.7m3/gangday labourers(gang sizeof1) 2steelbenders 0.42t/gangday 2labourers 1operator,2 masons,7 2.7m3/gangday labourers(gang sizeof4) 2masons2 labourers(gang 10m/gangdays sizeof5)

0.56

FIXANDPLACEREINFORCEMENTIN FOUNDATION

1.9t

4.52

INSITUCONCRETEINFOUNDATION

14m3

1.30

BLOCKWORKINFOUNDATION

156m

Concrete mixer

3.12

FORMWORKTOSIDESOFCOLUMNSIN 10 FOUNDATION

66m

2carpenters 7.6m/gangdays 2labourers

2.89

11 INSITUCONCRETEINCOLUMN

4m3

1operator,2 masons,7 3.1m3/gangday labourers(gang sizeof1) 5Labourers (gangsizeof 6.13m3/manday 2) 5Labourers (gangsizeof 6.13m3/manday 2) 2carpenters 2 30m/gangday labourers(gang sizeof2) 1operator,2 masons,7 3.4m3/gangday labourers(gang sizeof5)

1.29

12 FILLINGTOEXCAVATIONS

65m

5.30

13 FILLINGTOMAKEUPLEVELS

80m3

6.53

14 FORMWORKTOSIDESOFBED

101m

1.68

15 INSITUCONCRETEINBED

38m

Concrete mixer

2.24

SUPERSTRUCTURE Markoutandcutmildsteel reinforcement,bendintorequiredshape andfixinplacewiththeaidofbinding wires Measureandmarkouttheshapeofthe formworkontimberboardsandcutout. Oilthesurfacesoftheboardtoreceived concreteandfixintoposition Mixconcretetorequiredspecification usingamixeranddischargeinto formworkwiththeaidofbucketsor headpansandvibrateusingapoker vibrator 2Steel Fixer/Bender 0.3t/gangday 2labourers (gangsizeof2) 2carpenters 2labourers 7.6m/gangdays (gangsize5) 1operator,2 masons,7 3.1m3/gangday labourers(gang sizeof5)

FIXANDPLACEREINFORCEMENTIN 16 COLUMNS

3.44t

5.73

FORMWORKTOSIDESOFCOLUMNSAND 17 SIDESANDSOFFITOFLINTEL

77m

2.03

18 INSITUCONCRETEINCOLUMNSANDLINTEL

18m3

Concrete mixer

1.16

5.Prepareamethodstatement(TabularFormat)forasmallthree(3)bedroombungalow.
METHODSTATEMENT
CONTRACT:CONSTRUCTIONOFATHREEBEDROOMBUNGALOW DATE:30THMARCH,2013SHEETNO.2OF2 BY:WISDOMKWAMEAGBOZO(20281748) S/No OPERATIONS Q'TY METHOD RESOURCES PLANT LABOUR OUTPUT CONSTANT DURATION REMARKS

19 BLOCKWORK

625m

Markoutthepositionofblockworkon thesurfaceofconcretebed.Mixmortar usingconcretemixerandlayblocks Measureandmarkouttherooftruss membersandcutintoshape.Apply preservativetreatmentbysurface brushingandfabricateintoposition Placeandnailcorrugatedaluminium roofingsheetstohardwoodpurlins Mixmortartospecification,prepare surfacestoreceiverenderandapply mortar Primefabricatedframes.Bondedand pointedtomasonryincementsand mortar Preparesurfacestoreceivefinish.Mix mortarasbackingtospecificationandlay backing.Applyfinish,groundandpolish Fixpvcpipedconduitsthroughwallsand ceilingincludingallassociatedbends Fixpvcpipesthroughwallsandfloors includingallassociatedbends.Layingto requiredgradientusingaspiritlevel Measureandmarkoutceilingboardsand cutintoshape.Fixintopositionbynailing tohardwoodnoggins Fixcarriersincludingscrewingornailing louvrecarreirstohardwoodwindow frames Installbladesintolouvrecarriersincluding fixingmosquitoproofnetingwithcover battens Fixdoorsintoframesincludinginstalling morticelock Markoutthepositionofholestofix bracketstoreceivebasinsandinstallwc, showerroseandassociatedfittings Preparesurfacestoreceivepainting.Mix paintandapplyontothesurfacesinthe requirednumberofcoats Installflourescentlampandfittingaswell asceilingfan.Markoutandfixswitches

Concrete mixer

2masons2 labourers(gang 10m/gangdays sizeof5)

12.5

20 FIXINGROOFCARCASSING

685m2

2carpenters,2 labourers(gang 30m2/gangday sizeof2) 2carpenters,2 labourers(Use 70m2/gangday agangof3) Concrete mixer 2masons,2 labourers(Use 30m2/gangday agangof5) 2carpenters,2 labourers(Use 2gangs) 6Nr/gangday

4.89

21 ROOFCOVERING

685m

3.26

22 RENDERING

652m2

4.35

23 FIXWINDOWANDDOORFRAMES

55Nr.

24 FLOORFINISHESINCLUDINGBACKING

150m2

2masons,2 labourers(Use 12.5m2/gangday agangof2) 1electrician1 apprentice(use 18.3m/gangday 1gangsize) 1Plumber1 apprentice(use 16m/gangday 2gangsize) 2Carpenters 2Labourers 20m/gangdays (use2gang size) 2Carpenters 2Labourers 16Nr./gangday (use2gang size) 2Carpenters 2Labourers 80Nr./gangday (use3gang size) 1Carpenters 1Labourers 8Nr./gangday (use1gang size) 2Plumber1 apprentice(use 3Nr./gangday 1gangsize) 2painters1 labourer(use3 40m/gangdays gangsize) 1electrician1 apprentice(use 30Nr./gangday 1gangsize) 1electrician1 apprentice(use 80Nr./gangday 1gangsize) 1electrician1 apprentice(use 2Nr./gangday 1gangsize)

25

PIPEWORKSFORGENERALLIGHTINGAND POWER

120m

6.56

26

PIPEWORKSFORGENERALPLUMBING INSTALLATION

90m

2.81

27 CEILINGBOARDING(PLYWOOD)

120m2

28 FIXLOUVRECARRIERS

90Nr.

2.81

29 GLAZING

250Nr.

1.04

30 FIXDOORS

10Nr.

1.25

31 FIXANDINSTALLSANITARYAPPLIANCES

8Nr.

32 GENERALPAINTING

750m2

6.25

33

FIXANDINSTALLGENERALAPPLIANCESFOR LIGHTING FIXANDINSTALLGENERALAPPLIANCESFOR POWER FIXANDINSTALLLIGHTNINGPROTECTION SYSTEM

30Nr.

34

12Nr.

Markoutandfixsockets

0.15

35

2Nr.

Installairterminationrod,tapes,earth terminationrodandelectrode

Вам также может понравиться