Вы находитесь на странице: 1из 10

Subject:

Area:
Date:
Equipment Foundation:

Design of Lean Concrete


Pump Pits
6-Apr-14
22201A

Pipe Ring Properties

Author:
Chk. By:

OD
pipe ring

diam (ID)=
Wt=
unit wt.=
pipe ring wall "tw"=
Length of pipe ring " L" =

Lean Concrete Parameters


diam. (OD)=
thk. " t" =
Unit Wt. =
compressive strenght =

1981
8110
33.3
191.0

mm
kg/pc
kN/m
mm

5.5 m

lean concrete
2363
150
20
20

mm
mm
kN/m3
MPa

uplift force verification


moment capacity verification

VERIFIED
VERIFIED

COMPUTATION
fv
Fy
Fy
Fy

=0
= [Pipe Ring Wt x L ]+[ t xOD x unit wt lean concrete]
1
= [33.27 x 5.5] + [150/1000 x 2363/1000 x20]
1
=
190.08 kN
1

Top of Slab Level =


Ground Level =
Water Level =
Unit weight of Water =

0.61
0.00
96
-3.00
86.16

m
m
ft . DMD
m
ft . DMD

10 kN/m3
63.659 lb/ft3

Area

= r^2
=

4.39 m2

UPLIFT FORCE
P1 = x H x Area
= 10 x 2.97 x 4.39
P1
130.38 kN
Concrete Total Weight=
190.080 kN
Total Weight =
190.08 kN

Height
Height

" h1" =
" h2" =

3.00 m
2.970
m
9.74 ft

GL

WL

Subject:
Area:
Date:
Equipment Foundation:
Factor of Safety =

Design of Lean Concrete


Pump Pits
6-Apr-14
22201A
1.458
>
HENCE OK
COMPRESSIVE STRESS @ EDGE OF LEAN CONCRETE

Author:
Chk. By:

OD

1.1

Force "Fy1"=

190.08 kN
Area
-Area
Area net=
OD
ID
= 4.39 - 3.09
=
Stress = 190.08

Area

OD

4.39 m2

Area

ID

3.09 m2

1.3 m2
/ 1.3

= 146.21538462 kN/m2
Moment of Inertia for lean concrete edge portion
Using stress equation below:

Considering the force of action only on the pipe ring wall thickness as critical
Moment of Inertia about x axis = 1/12 bh3
b=
h=

0.191 m
0.15 m

Ix = 5.37188E-005 m4
c=
0.075 m
stress computed =

Mcomp=

0.1047267692 kN-m
Check Moment capacity of lean conrete
Compressive strenght allow.=
Ix = 5.37188E-005 m4
c=
0.075 m
Mallow=
14.325 kN-m
Mallow
Mcomp
>

20000 kN/m2

VERIFIED

CIB
PST

ncrete

CIB
PST

Equipment No.:
Description:
Equipment Weight

22201A/B
154.090844 kN
34641 lb

Concrete Unit weight

25 kN/m3

W
W

L
H

Top plan

Side View

Geometric Dimensions
Description

Qty

Length

unit
Top Slab
Vertical walls
Base Slab

Dimensions
Width

1
1
1

(m)
2.413
2.413
3.404

inch
95.005
95.005
134.022

(m)
2.413
2.413
3.404

inch
95.005
95.005
134.022

Height
(m)
0.610
5.639
0.330

inch
24.017
222.019
12.993

Unit weight
kN/m3
25.000
25.000
25.000
Subtotal 1

lb/ft3
159.147
159.147
159.147

Total Weight
kN
kip
88.794
19.962
820.837
184.531
95.595
21.491
1005.225 kN
225.984 kip

Deductive section
Description

Qty
unit

Cavity Shaft (top)


Cavity Shaft (wall)

Dimensions
Width/ Diam.

Length
(m)
1
1

inch
-

(m)
1.219
1.753

inch
47.994
69.019

Height
(m)
0.610
4.648

inch
24.017
183.001

Unit weight
kN/m3
25.000
25.000
Subtotal 2

Net Weight =
Net Weight =

lb/ft3
159.147
159.147

Total Weight
kN
kip
17.798
4.001
280.453
63.048
298.251 kN
67.050 kip
Subtotal1-Subtotal2
706.974 kN
158.934 kip

Self weight

stability Moment due to seflweight

706.97400363 kN
158.934 kip

Earth Weight around footing =

126.21 kN
28.374 kip

Equipment Weight =

154.09084445 kN
34.641 kip

[ Moment for Equipment]=

506.500 kNm

[ Vertical load (-)]

987.28 kN
221.949 kip

Stabilization Moment 'Ms =

=
=

[ Vertical load (-)] x [ x distance]


1,678.4 kN-m
1,237,902.55 lb-ft

Overturning Moments' Mo=

[ Hor. load] x [ Y distance]+ [ Moment Eqpt]


799.2655 kN-m
589,507.98 lb-ft

X=

1.700 m
66.932 in

Y=

6.579 m
259.028 in

A
X
[ Hor. load (due to equipment )]

44.5 kN
10.004 kip

[ Hor. load (due to seismic load )]

22.52 kN
5.062 kip

[ Hor. load]

67.02 kN
15.066 kip

SLIDING VERIFICATION
Internal friction angle of soil ==

=2/3 x

[ vert. load] x tan


[ Hor. load]

34
22.667
=

412.31
67.02

FS

6.15

> 1.50

SATISFIED

> 1.50

SATISFIED

OVERTURNING VERIFICATION
Ms
Mo

=
1,678.37
799.27

FS

2.10