Sheet2 Client: Project : Shazim Ali Farouk Yathali's Commercial Centre BILL OF PROVISIONAL QUANTIES ITEM NO: DESCRIPTION

SUMMARY OF QUANTITIES A PRELIMINARIES B EARTH OR!S C CONCRETE OR!S D BLOC!S" PLASTER# PAINTIN$ E TILIN$ AND FLOOR OR!S F INDO S AND DOORS $ STAIRS AND LIFTS H PLUMBIN$ AND ELECTRICAL I SITE OR!S TOTALS A PRELIMINARIES Notes: Prices shall include all that is necessary for the completion of works according to drawings, specs and Engineers directives but not defined in other sections %&% Pro"ect #anager %&' Foreman %&( %ight &atch %&) Contractors '((ice %&* )ehicle an* Fuel %&+ Bank Costs %&, $nsurance %&- Security %&. +ools, -a**er an* +ackle %&% Consuma.les %&%' +em/orary &ater Connection %&%( +em/orary 0lectricty Connection %&%) Store1 She*s %&%* Site +oilet %&%+ +ele/hone 1 Fa2 1 Cell /hone %&%, Site '((ice %&%- %otice Boar*s %&%. -an* Sur3eyor %&' 4uantity Sur3eyor %&'% 0ngineer %&'' Cleaning Tot/l o0 Bill 1 Preli2in/rie3 B EARTH OR!S 4 %otes: Prices for Excavation item shall include the removal of any buried structure not to be part of the proposed construction, including transport of excavated, surplus material and buried structure (not to be part of the proposed construction) to a location approved by the engineer or his representative outside the site, workmanship and any where else, needed, all according to drawings, specifications, conditions and directed instructions by the Engineer or his representative. Quantities of Excavation he Price for excavation includes demolishing and removal any of existing structures. !ebris material shall be disposed off to approve site as directed by the Engineer or his representative. "ack#filling item should be in layers ($%cm max. each & compaction test '()). Prices shall includes supply, wetted, compacted, transporting, tested and anywhere else, needed, all according to drawings, specifications, conditions and directed instructions by the Engineer or his representative. $tem $tem $tem $tem $tem $tem $tem $tem $tem $tem $tem $tem $tem $tem $tem $tem $tem $tem $tem $tem $tem 5ate: 16th 7an 281! By: Akil Peters QTY Cell: 3325 1! AMOUNT

UNIT

RATE

OR!S

Page 1

Sheet2

*uitable +lean sand or kurkar soil material should be used for back#filling in layers ($%cm max. each & compaction test '()), selected from the approval excavated soil or imported. Prices shall includes supply, wetted, compacted, transporting, tested and anywhere else, needed, all according to drawings, specifications, conditions and directed instructions by the Engineer or his representative. %&% 02ca3ation o( any soil ty/e accor*ing to the elements' *imensions mentione* in the *ra:ings :ith all re;uire* :orks %&' Back(ill at areas sho:n on the *ra:ing .y usings a//ro3e* e2ca3ate* material :ith all re;uire* :orks= $nclu*es maintaining le3els sho:n in the *ra:ings, s/eci(ication an* *irecte* .y the 0ngineer or >is ?e/resentati3e using suita.le material @25cm ma2= each A 6<B com/actionC TOTAL OF BILL B 5EARTH OR!S6 C CONCRETE OR!S CF 98!

CF

!23<

4 Notes: Prices for all concrete items shall include shuttering, steel reinforcement tests, supply and placing of concrete, Mix Design, vibrating, curing, polythene sheet for concrete that may be in contact with soil!, bitumen and the like" #llow for sleeves, making good of surfaces and the like" #llow for all re$uired works to meet specifications, conditions and directives of the Engineer or his representatives Concrete 1 B/3e %&% Su//ly an* cast Concrete .elo: sla. gra*e, inc= su//orts, (orm:orks an* rein(orcements= 3888Psi @1:2:! mi2 ratioC Concerete 1 Sl/7 4 Notes: #ll %labs are &' ( )***psi %&' Su//ly an* cast groun* (loor sla. :ith all re;uire* :orks= %&( Su//ly an* cast Concrete (or (irst an* secon* (loor sla. :ith all re;uire* :orks %&) Su//ly an* cast Concrete (or roo( :ith all re;uire* :orks= %&* Su//ly an* Cast Concerete (or Stair an* -i(t roo( :ith all re;uire* :orks Concerete 1 Be/23 %&+ Su//ly an* Cast Concrete (or .eams :ith all re;uire* :orks Concrete8 Col92n3 %&, Su//ly an* Cast concrete (or colums :ith all re;uire* :orks TOTAL OF BILL C 5CONCRETE D BLOC!S" PLASTER# PAINTIN$ OR!S6 OR!S

CF

SF

!598

SF

69 2

SF

!56<

SF

<88

CF

3622

CF

999

Notes: Prices of block works shall include supply of hollow concrete blocks from good and approved factories and installed in good manner and include for cement sand Mortar +:)!" #llow for materials, testing, sacffolds, workmanship, ducts, sleeves and pipes, tools and the like as needed

Page 2

Sheet2 Prices for Plastering shall include supply of all materials and e$uipment need" Prices of Painting works for walls and ceilings shall include supply of all materials sacffolds, workmanship and tools as needed -: Bloc;3 Belo< Sl/7 =r/>e %&% Place an* set <2<219 .locks .elo: gra*e :ith all re;uire* :orks E?tern/l Bloc;3 1 +: Place an* set 92<219 .locks :ith all re;uire* :orks Intern/l Bloc;3 1 ): Place an* set !2<212 hollo: clay .locks :ith all re;uire* :orks Intern/l Bloc;3 1 +: Place an* set 92<219 .locks Pl/3terin= '&% Plaster e2ternal :alls t:o (aces an* all re;uire* :orks= '&' Plaster internal :alls t:o (aces an* make goo* :ith all re;uire* :orks P/intin= (&% Paint 02terior one un*ercoat /rimer an* min= t:o coats :ith all re;uire* :orks (&' Paint $nterior one un*ercoat :ith min= t:o coats :ith all re;uire* :orks TOTAL OF BILL BLOC!S AND PLASTER E Tilin= /n> Floor or;3 %otes: Prices of ,ile works shall include the supply of all materials and e$uipment need" mortar, skirting, workmanship, and all else re$uired to complete works" %&% %onDsli/ Ceramic tiles 12in 2 12in :ith all re;uire* :orks %&' 02ta o3er $tems Tot/l o0 Bill Tilin= /n> Floor F INDO S AND DOORS Notes: Price of windows and doors includes supplying, workmanship, fixation for locks, of good $uality and complete and all necessary pasty need to complete works in>o<3 %&% Su//ly an* $nstall &in*o:s 9(t 2 <8 in Com/lete :ith silicone, sealant, an* all necessary items to com/lete :orks %&' Su//ly an* $nstall &in*o:s 12(t 2 2 in Com/lete :ith silicone, sealant, an* all necessary items to com/lete :orks Door3 '&% Su//ly an* $nstall 5oor 32in 2 <8in :t one lea( '&' Su//ly an* $nstall 5oor 39in 2 <8in :t one lea( '&( Su//ly an* $nstall 5oor 2in 2 <8in :t or;3 SF 1!868 SF 6623 SF 6623

SF

69

SF

6622

SF

568!

SF

!33

SF

86!

SF

1 81

PS

%r

12

%r

12

%r

21

%r

12

%r Page 3

Sheet2 t:in lea( Tot/l o0 Bill in>o<3 /n> Door3

$ St/ir3 /n> Li0t3 Notes: %hall -nclude all reinforcements, support, materials, workmanship, testing and all tools for the completion of works according to drawings, specs and Engineers directives St/ir3 Su//ly an* $nstall Stairs SF Li0t $nstall an* Fit #echancial li(t $tem Tot/l o0 Bill St/ir3 /n> Li0t H Pl927in= /n> Electric/l Notes: ,he .ontractor shall include and allow for all costs or expenses of all items and works re$uired to complete works ,he exact length of pipes" /alves and the like will be determined during the implementation of the 0orks Prices should also include all excavation, backfilling, supporting, cutting and all associated works" %&% Su//ly an* $nstall :hite 3itreous china toilet :ith (lush cistern o( 2 gal ca/acity, seat, mounte*, an* har* seat co3ers, inc :ate /i/es an* *rainage an* all re;uire* (ittings an* :orks= %&' Su//ly an* $nstall :hite 3itreous china :all mounte* urinals an* all re;uire* (ittings an* :orks= %r

<<

1<

%r

%&( Su//ly an* $nstall :hite 3itreous china %r hange* :ash .asin :ith all necessary (itting to:el rail, su//ort, :ater mi2er, ta/s, tra/s *rainage an* like= %&) +esting an* $ns/ection %&* 02tra '3er $tems Electric/l Notes: -nclude all conduits, connection boxes, controls, wires, connectors, clamps, cables, bolts and all necessary items to complete works" .ontractor shall submit shop drawings for all electrical works to be approved by Engineer before executing works #s built drawings shall be submited after handing over the work #ll electrical works shall be executed according to the %tandards, drawings, specification and Engineer1s instructions '&% $nstall an* Su//ly all 0lectrical 5e3ices $nclu*ing $ns/ections an* +estings an* all re;uire* :orks= Tot/l o0 Bill Pl927in= /n> Electric/l I SITE OR!S PS $tem PS

21

Notes: %hall include for all materials and works for the preparation and making good of the site as defined by specification and Engineers Page !

Sheet2 -nstructions" %&% ?emo3ing to/ soil o( site u/ to <E inclu*e (or le3elling site %&' Su//lying an* $nstalling suita.le har*to/ :ith all re;uire* :orks 5etermine* .y 0ngineer %&( $nstall Site 5rainage incl= All necessary tools an* materials to com/lete :orks as /er 0ngineers *irecti3e Tot/l o0 Bill 1 Site or;3 SF 11<2<

SF

29<

PS

Page 5