This document provides guidance on inspecting roof and waterproofing systems. It describes a systematic 4-phase inspection process: 1) interior visual inspection to identify water damage; 2) exterior inspection to examine building components; 3) roof/waterproofing system inspection; and 4) analysis and recommendations. Key components to examine at each phase are identified, including structure, roof surface, flashing, drainage, sealants and more. Detailed inspection helps locate any defects impacting the watertight barrier between exterior and interior.
This document provides guidance on inspecting roof and waterproofing systems. It describes a systematic 4-phase inspection process: 1) interior visual inspection to identify water damage; 2) exterior inspection to examine building components; 3) roof/waterproofing system inspection; and 4) analysis and recommendations. Key components to examine at each phase are identified, including structure, roof surface, flashing, drainage, sealants and more. Detailed inspection helps locate any defects impacting the watertight barrier between exterior and interior.
This document provides guidance on inspecting roof and waterproofing systems. It describes a systematic 4-phase inspection process: 1) interior visual inspection to identify water damage; 2) exterior inspection to examine building components; 3) roof/waterproofing system inspection; and 4) analysis and recommendations. Key components to examine at each phase are identified, including structure, roof surface, flashing, drainage, sealants and more. Detailed inspection helps locate any defects impacting the watertight barrier between exterior and interior.
CHAPTER FOUR - INSPECTION SECTION GENERAL Roof and waterproofing systems are comprised of many parts that work together to provide watertight barrier between the exterior and interior of the building. The partial or complete failure of any one component may result in failure of the entire system. The visual inspection of the roof and waterproofing systems includes an evaluation of: lnterior components of the building associated with the roof and waterproofing systems such as ceiling, and walls; Exterior components, including the facade, parapets, fascias, and drainage; The roof surface, including flashing, drainage, penetrations, parapets, and edge details; Waterproofing system, including sealant joints, mortar joints, building expansion joints, exposed flashing, and surface drainage. Typical roof components are illustrated in Figures 4-1 and 4-2. The inspection and repair of roof and waterproofing systems should accomplished trained personnel in: The basic make-up of the system being inspected; ldentifying the various defects; Making recommendations to accomplish the necessary repairs; Recognizing when repairs are beyond the HA's abllity. SECTION PREPARATION FOR INSPECTION Prior to inspection, the lnspector should review the Historical Oata File, especially the most recent inspection report and any related work orders. Leaks reported since the last inspection should noted the inspection roof plan. The lnspector should take the following items with him or her for conducting the inspection: Blank inspection report form; Roof plan with leak locations noted; of last inspection report; V ROOF AND WATERPROOFING (8194) 4-1 INSPECTION LEGEND 1. COPING 2.
3. BASE FLASHING 4. ROOF MEMBRANE 5. INSULA110N 6. DRAIN 7. PARAPET 'NALL 8. FACADE 9. WINDOW 1 DRAIN UNE 11. CEIUNG 12. WALL 13. FLOOR S1RUC11URE 14. FOUNDA 110N 15. FLOOR SLAB 16. FOUNDA 1lON DAMPPROOFING 17. FOUNDA 110N DRAIN 18. FINISHED GRADE Figure 4-1: Building Cornponents-Flat-Roofed Buildings V ROOF AND WATERPROOFING (8J94) 4-2 INSPECTION LEGEND 1. SHINGLE ROOFlNG 2. ROOF DECK 3. PIPE PENE'!RA 110N 4. FASCIA 5. 6. DOWNSPOUT 7. SOFFlT FACADE 9. W!NDOW 1 0. IIOT 1!51'.1:1 11. CEIUNG 12. WAU. 13. FLOOR 14. FOUNDA 110N 15. FLOOR SLAB 16. FOUNDA 110N DAMPPROOFlNG 17. FOUNDA 110N DRAIN 1 FlNISHED GRADE Figure 4-2: Building Components-Sloped-Roofed Buildings V ROOF AND WATERPROOFING (8194) INSPECTION ruler, colored pencil or pen; Aerosol can of bright marking paint; Sharp knife; Measuring tape; Flashlight; Small trowel to scrape sealant and gravel; Large trash bag to collect roof-top debris; Level; Camera and Pocket whisk SECTION SYSTEMATIC INSPECTION OF STRUCTURE, ROOFING, AND WATERPROOFING SYSTEMS The following are the recommended procedures for inspecting roof and waterproofing systems, whether the systems are inspected at the same time or separately. Each inspection should follow prescribed routine which the inspector to examine each component. lnspection guides are included in Appendix These guides can used as is, or tailored to meet specific requirements. typical inspection will consist of four phases: Visual inspection of building interior; Visual inspection of building exterior; Visual inspection of roof or waterproofing system and components; Analysis and recommendations. The basic components of each phase are illustrated in Figures 4-3 and 4-4. Under certain circumstances, fifth phase, consisting of specialized testing, may required to determine the causes of leaks and the extent of the damage observed during the routine inspection. SECTION D FIRST PHASE: INTERIOR INSPECTION Visually inspect the interior of the structure related to the roof or waterproofing systems. The following elements should inspected: Check structural system for deterioration. reflective cracking, efflorescence (white powder) on walls, ceilings, underside of roof deck, and at foundation walls. Check for water stains on ceilings, piping, ducts, walls, and supporting members. Note the exact locations of water damage measurement to building components that can located on roof or exterior of building. At least two measurements should taken from convenient points such as eaves, edges, valleys, or other locations. V ROOF AND WATERPROOFING (8194) INSPECTION lnspect interior area darnage for potential source of leak. Where water seen dripping through the sheathing, locating the source is relatively simple, provided there is insulation under the roof membrane. steeply sloped roofs where water or moisture appears the ceiling, the rafters immediately the moist spot should inspected for some distance. The drip line will show the rafter, and the point of water entry located with measurements. Some typical sources for interior leaks are: Water leaking through deck penetrations; Water tracking along pipes or structural members and dripping off at changes in direction or elevation; Saturated insulation water and drain-line piping; Condensation below HVAC ducts. (Note that stains below HVAC ducts may result from condensation or from pipe delects.) When the source is not readily apparent, inspect penetrations such as vent pipes, where such leaks rnay develop. Note these locations with measurements, and record. Discussions with tenants rnay helpful in determining whether or not the leak occurs every time it rains, only during hard-driving rains, or some time after rain has ended. SECTION SECOND PHASE: EXTERIOR INSPECTION Transfer measurements potential leak sources from interior inspection to exterior of building and mark locations with lumber crayon. Visually inspect the exterior of the building. Elements that rnay inspected include, but are not limited to: for cracks, water stains, open sealant joints, pointing delects, loose or deteriorated brick, clogged weep holes. Parapet-<:heck for cracks, water stains, pointing delects, open sealant joints. Such delects may caused base-flashing delects. Mark delect locations the plan so the roof area near the defect inspected. Windows and door openingS-<:heck for delective sealant around window and doors, deteriorated wood and metal trim, rusted lintels, clogged window weeps and door-head flashing. Foundation-grading at foundation should slope away from building with depressions in the grade against the building. for adequate support and for damage to gutters and downspouts. Leaks observed during the interior inspection can result from clogged gutters and downspouts. Also, melting snow and ice rools ice darns at eaves or gutters cause water penetration. Note exterior delects in relation to leaks observed during interior inspection to determine exterior condiOons are resulting in the interior darnage. V ROOF AND WATERPROOFING (8/94) 4-5 INSPECTION IZ }-----; ... ,- LEGEND F1RST PHASE - INSPECTION 1. SLAB 2. ROOF noNS 3. WALLS 4. OF AND DOORS 5. SIDE OF FOUNDA noN WALLS SECOND PHASE - INSPECnON FINISHED GRADE SLOPE FOR POS!nVE DRAIN SLOPE (NO 7. MORTAR PO!NnNG (IF APPUCABLE) 8. F FOR CRACKS AND STAINING 9. ARAPET 1 AND BUILDING SEALANTS PHASE - ROOF INSPECnON 11. COPING 12. 13. BASE F1LASHING 14. ROOF MEMBRANE 15. ROOF DRAINAGE INCLUOING SLOPE AND RAIN LEADER FOR PROPER FLNCnONING Figure 4-3: Components of Visual Inspection V ROOF AND WATERPROOFING (8194) INSPECTION LECEND FIRST PHASE - 1. UNOERSIDE OF ROOF 2. ROOF 3. WALLS 4. OF WINDOWS AND DOORS 5. SIDE OF FOUNOA TION WALLS SECOND PHASE - 6. FINISHED GRADE SLOPE FOR DRAIN SLOPE (NO 7. MORTAR POINilNG (IF APPUCABLE) FACADE FOR CRACKS AND STAINING 9. AND DOWNSPOUT ACHMENT 10. DOWNSPOUT DISCHARGE GRADE (SPLASH BLOCK) OR DRAIN 1 1. WINDOW AND BUIUDING
PHASE - ROOF 12. SHJNGLES 13. FLASHING 14. FOR DEBRIS,
Figure 4-4: Components of Visual Inspection-Sloped Roofs V ROOF AND WATERPROOFING (8J94) 4-7 INSPECTION SECTION F THIRD PHASE: ROOF INSPECTION This is to provide procedures for each typical roof Par1 8 of this is list of typical related to specific types. 11 is that the familiarize themselves with the roof details prior to the roof. The Roofing and Waterproofing Manual also of proper roof 1. ROOF SURFACE of the roof surface all walls, other items that affect the water1ight of the roof system. Carefully areas damage repor1ed or the survey. Debris, clogged water. materials left the roof the to improve the level of 2. FLASHING INSPECTION attributed to are actually leaks occur, the should of the first areas Typical are Figure 4-5. The are for Check height. Eight is the height for base water the roof heavy over1op low Carefully the materials the for of breaks or moisture. Look for laps or seams, of from ver1ical surfaces, of weather exposed to direct deteriorate more rapidly those the Check to see that felts base sheets are tightly adhered to the strip or wall surface. Loose base detected the mid-way the roof the venical surface. Check for other of water the outside of walls parapets. Areas should clearly marked for repair. Check for the base This is of the roof the wall or that the base is Check metal for see that it is properly wedged place or is securely to receiver, whichever is Check that the the top edge of is well to the wall the should shaped to water away from V ROOF AND WATERPROOFING (8/94) 4-8
the wall. Check that counterflashing is securely set in reglet. Loose counterflashing should reset and missing or too-shallowly set counterflashing should replaced new counterflashing. Check of wall counterflashing to determine whether there are open joints, or cracks that could allow water infiltration into wall and behind base flashing. Open mortar joints should resealed. Weep holes, which al/ow water to the wal/, shou/d not sea/ed. lf necessary, repoint the joints with mortar. Figure 4-5: Flashing Components 3. DRAINAGE LECEND 1. WALL OR ARAPET 2. REGLET 3. /N REGLET SHOWN) 4. BASE FLASHING 5. CANT INSULA 7. DECK (WOOD PLANK SHOWN) ROOF MEMBRANE General components of roof drainage systems are shown in Figures 4-6 and 4-7. The fol/owing is suggested drainage inspection checklist: Check that the flat roof-deck slope is unobstructed and permits free drainage. Look for sagging and depressed areas, standing water, washed-out slag, or water-stained areas. Plant growth, foreign and debris should removed. Check rain leaders and strainers to see that they are in place and in good Look for broken and clogged drains, strainers, and damaged gravel stops. V ROOF AND WATERPROOFING (8194) 4-9 INSPECTION Check for ponding water. Standing water may indicate thatthe drain is settoo high or not in the correct location. Look for defective drain flashing. Determine if the roof membrane is securely clamped within the drain ring. Check that the roof membrane does not or reduce lhe effective size of the drain pipe opening. Membrane inside clamping ring should cut to within one inch of the clamping ring. Check gutter attachment to the edge of roof to determine whether it is adequately supported. Note whether gutter is clear of debris, gutter joints are sealed watertight, and if there are holes in the gutter. Verify that the gutters are level or slope downward to lhe downspout and that the downspout is firmly secured to the outlet tube. Check that the downspout is free-draining at grade, adequately connected to ground drain pipe or that the splash are properly located, and water is discharged to an area with good slope away from the building. LEGEND 1. ROOF SURFACE 2. SUPPORT (SPIKE AND FERRULE SHOWN) 3. 4. 5. DOWNSPOUT DOWNSPOUT 7. SPLASH BLOCK (DRAIN NOT SHOWN) 8. FlNISHED GRADE Figure 4-6: Gutter and Downspout Components V ROOF AND WATERPROOFING (8194) 4-10 INSPECTION LEGEND 1. DRAIN DOME 2. CLAMPING RING 3. DRAIN 4. DRAIN BODY 5. ROOF MEMBRANE 6. INSULA110N 7. DECK
DRAIN PIPE Figure 4-7: Roof Drain Components 4. ROOF EDGE INSPECTION Gravel stops and metal roof-edge strips embedded in the roof membrane often leak because the metal and roofing materials expand at different rates and thus separate. The separations appear as between the roof membrane and the metal. This type of gravel-stop installation is shown in Figure 4-8. Roof-edge details should inspected for: Damaged, missing, unattached, or deteriorated overhanging material and fascia boards; Split or cracked stripping felts; Open or broken joints between metal pieces. 5. COPING INSPECTION Determine whether the coping the parapet wall is masonry, membrane, or metal. lf metal, note the type and thickness/gauge/weight and update in the Historical Data File if necessary. Check for open mortar and sealant joints which require repair. Check that the roof membrane continues over the top of the parapet below the coping. lf not, determine the counterflashing is adequate. lf the coping is metal, note the condition of the finish. Check for peeling paint, rust, corrosion, and V ROOF AND WATERPROOFING (8194) 4-11 INSPECTION holes. Check whether exposed heads are sealed water1ight.
LEGEND 1. FASCIA 2. GRAVEL 3. 4. 5. ROOF MEMBRANE
6. INSULA nON 7. DECK SHOWN) 8. MASONRY F ACADE Figure 4-8: Gravel Stop Components 6. MEMBRANE INSPECTION the elastomeric, Verify update the Historical Data Rle ff Check the Historical Data File to see ff the roof is re-<:over. lf there are patches, their especially the the roof List but limited to, debris clogged surface of roof for The aggregate roof should fully cover the flood coat. There should spots. systerns, the ballast should well distributed. fullyadhered or systems, should out. Note any exposed open seams, loose or other areas of deterioration which need to repaired. Check the of walkway pads, pavers, the roof adjacent to them. Check for if and depth roof plan. Emphasize the need for if but not to, removal V ROOF AND WATERPROOFING (8194) 4-12 INSPECTION of debris and foreign objects that damage the membrane, redistribution of ballast, of smooth-surfaced of aggregate at exposed felts built-up roofs. 7. ROOFTOP EQUIPMENT SUPPORT INSPECTION typically roofs heat pumps, large small HVAC These items are frames or, sometimes directly the roof the supports to that they are flashed water-tight. The items should as part of this Check supports for the of surfaces. Check base of to supports. Note deteriorated, loose, or base lf there are shields supports, check that they are securely sealed water-tight. Check n there is whether it has with manufacturers' Also, that has removed. Check n or other objects have roof to removed. 8. INSPECTION PROCEDURES MEMBRANE The list is to the listed (see the Glossary for of Note the of the roof lllustrations of typical built-up roof are in Figure 4-9. Built-Up Roof Built-up roof are constructed of layers of felt with the felts to provide the The roof enher smooth-surfaced (usually with or surfaced with gravel or slag embedded flood coat of Check built-up roofs for the deficiencies: Blisters: the size whether they are or Mark blisters with highly so that others the roof avoid Slippage ridges; Splits, holes, fishmouths; Loss of top surface or exposed and deteriorated felts, alligatoring (see Figure 4-9), lack of between plies. V ROOF AND WATERPROOFING (8/94) 4-13 INSPECTION BUIL T-UP ROOF DEFICIENCIES
.. GRAPHIC REPRESENTATION OF MEMBRANE SPLIT MEMBRANE
DECK GRAPHIC REPRESENTATION OF MEMBRANE SPLIT GRAPHIC OF RIDGES IN MEMBRANE Alligatored flood coat Figure 4-9: Built-Up Roof Deficiencies V ROOF AND WATERPROOFING (8194) 4-14 INSPECTION Modlfled Bltumen Rooflng is either or smooth-surlaced material, typically applied three-foot strips with at the seams. The material appears similar to roll except that the is much thicker. Check for the
seams, or other type of Roll Rooflng Roll is fehs that have treated with asphah surlaced side with small aggregate. Ahhough this material is typically used, it may some or storage Check for the or improperly or lapped seams; Poor surface or lost weathered edges, holes. d. Metal Roofing There are various metal systems. The first step metal roof is to the type of metal used so that appropriate materials specified for the repairs. check for the of surfaces; Rust; Small holes, cuts, Loose seams; solder height; especially copper Check areas where there are flows, valleys, crickets, or roof for or worn metal (11 the metal is the surlace to protect it from further wear. 11 area is metal patch should 11 the area is Jarge, the metal should replaced.) d. Slate, Tile, and Other Rigid Roofing Typical slate roof are Figure 4-1 Check for the loose tile; heads; V ROOF AND WATERPROOFJNG (8194) 4-15 JNSPECTION plaster lath optional ------ slate 1 ' ' ' 1 ' 1 , ' 1 Figure 4-10: Slate Roof Components lnadequate head laps; Rotted nailers; Deteriorated underlayment where tiles are missing); Deteriorated fasteners (look at loose tiles); --- elastic cement plaster latll roof :--+--no less than
Metal flashing---see criteria for metal roofs. Check erosion in drainage channels, along valleys, and at drip lines. f. Asphalt Shlngles Check for the foliowing: Loss of mineral surfacing; Splitting and surface cracking; Wind damage at "free' tabs; lmproper overhang or lack of drip edge at rake and eave, resutting in rotting of wood sheathing; Cur1ing or cupping, brittleness; Evidence of leaks at projections like vent pipes. V ROOF AND WATERPROOFING (8194) 4-16 INSPECTION SECTION G FOURTH PHASE: WATERPROOFING INSPECTION 1. GENERAL The lnspector should star1 with sample inspection of exterior wall finishes, including mor1ar joints, sealant joints at window and door perimeters, window stiles, and building expansion joints. This inspection should provide enough information to determine whether detailed inspection is required. When there is interior damage potentially associated with the waterproofing system, the wall areas above and near the interior damage should carefully inspected. For leaks at and below-grade, the ground surface drainage at the wall exterior, the foundation waterproofing, and the footing drain, if any, should inspected. 2. WATERPROOFING INSPECTION Foundation Check walls for efflorescence, of plaster, water stains, cracks, and spalls. 11 there are water the walls, note their sketch elevation of the wall. Check the floor for ponded water or watermarks, check floor to sure they are clear. 11 there is sump pump, lift the float to the pump to sure it operates. Most leaks corrected (pot holes), sloping the finished grade away from the foundation, the downspouts to closed conduits. the exterior note the items related to the waterproofing: Depressions and slope of finished grade; Location of roof drainage discharge and how (whether) it is directed away from the building. Brlck Masonry Facades the facade for the following mor1ar joints; Clogged weep holes; or deteriorated at soft joints; Exposed powdery substance the of wall); Stains or discolorations; Cracked brick Note whether they are isolated breaks or par1 of larger crack through several courses of the (Cracks from V ROOF AND WATERPROOFING (8194) 4-17 INSPECTION settlement or from shrinking and swelling soils require an engineering study.) Spalled bricks. Note whether they are single bricks or part of larger area of deterioration. lf any of these conditions are observed, make sketch of the facade and mark the locations of the SECTION PHASE: ANALYSIS AND RECOMMENDATIONS After all the data is collected, for repair, or should made. repair that are the of the should accomplished shortly after the the weather is good. Otherwise, the use of should there is structural damage, structural should for SECTION 1 SIXTH PHASE: ADDITIONAL TESTING At times is required to the suspected leak sources to assess the of darnage, such as wet the source or cause of leaks accomplished staff Procedures for leaks are the the of wet however, requires the use of specialized which is typically HAs. The basic are discussed Chapter Three. SECTION J LOCATING LEAKS Leaks should located corrective taken as soon as Eariy the of darnage to the roof the Leaks should the The procedures for leaks are the various for exterior, roof-surface lf leak sources are readily from visual try to locate the leak source as described the SECTION WATERTESTING 1. WATER-TESTING FOUNDATIONS Dig small the wall above the area of suspected failure. Pit should approximately two feet square foot deep. Visually the exposed or record Fill the with water, keep the hose just to the water level. Allow the water to for at least hour and V ROOF AND WATERPROOFING (8194) 4-18 INSPECTION continually monitor the interior ol the structure lor leak. Delmhorst Moisture Meter or similar meter can otten helplul in tests when the interior damage may the result ol increased moisture content ol the wall rather than actualleaking ol water. 11 the test is unsuccesslul, water test the wall, and then any doors or windows the leaking loundation. Lack ol proper waterprooling termination or through-wall llashing could the source ol leaks. Another source is rising damp. This phenomenon, which lrom ground water rising in masonry loundation walls capillary action, would not apparent lrom water testing. (Delmhorst Moisture Meters are manulactured Delmhorst lnstrument Company. 50 lndian Lane East Towaco, New Jersey 07082, Telephone 800/222-0638.) 2. WATER-TESTING WATERPROOFED WALLS Start water-testing spraying water at the lowest point ol the wall that could contribute to the leak; do not test the wall below the interior leak. For an extended test, sprinkler can uselul. After allowing sulticient time lor water to penetrate the wall, spray the wall at higher elevation. When water penetrates the structure, note the location being tested and stop the test. Clean-up and remove water lrom the interior area. For leaks associated with wind- driven rain, water-testing may not effective. Therelore, results lrom water-testing walls may not always conclusive. 3. WATER-TESTING ROOFS lsolate the rool area the leak, plug the rool drain with plug, and llood the isolated rool area. Have an assistant continually monitor the building interior at the leak location lor the entry ol water or moisture. The assistant should notify the tester when the leak starts. 11 no leak occurs after approximately one hour ol llood testing, remove the drain plug. Then move the hose and spray the llashings near the leak, one at time. The approach should to water-test lrom the lowest point to the highest point ol the rool. When the interior leak starts, note the area being tested, shutoff the water, and clear the rool ol water. Provide buckets and rags at the interior leak location to collect the water penetrating lrom the water-test. 4. LENGTH OF TESTS One hour is typically sulticient time lor water-tests to produce results. 11 leak occurs in less time, the test should stopped immediately and the water leak cleaned up. The main lactors contributing to the length ol time are the severity ol the leak and the mass and porosity ol material which the water must penetrate to appear on the interior. V ROOF AND WATERPROOFING (8194) 4-19 INSPECTION 5. VERIFY RESUL TS Moving water quickly from one location to another during testing can lead to inaccurate results. 11 there is the result of test. allow water to stop leaking and repeat Since the leak path is already retesting should produce results much more quickly than the original test. 11 is important to note that successful water-testing is systematic and methodical means that requires practice and patience. 6. EXERCISE CAUTION Prior to water-testing roof systems. the live-load of the roof should checked to ensure that the water to ponded on the roof will not overload the structure. (Water weighs approximately 5 pounds per square foot per inch of depth). water test may in damage in the interior of the building. Therefore, the inspector should evaluate the potential for interior damage to the structure. private property, and equipment when determining to water-test, and should take precautions to protect the interior elements (for instance, move and cover plastic). Water-testing may not successful on re-cover roofs because water can travel between the original and re-cover roof for great distances before leaking into the building at deck crack or penetration. Water can collect on the original roof membrane and not leak into the building until well after the lnspector has left the property. 7. EQUIPMENT The following equipment is required or useful for water'lesting: Hose; Spray nozzle, sprinkler, or soaker hose as required; Bucket, rags, and shop vacuum (if to catch water; Drain plugs; Plastic sheeting and duct tape to isolate water-test areas; Flashlight; Hose key, needed; Delmhorst or other moisture meter measure to location of leak. Measure leak location from anything that can seen _at the exterior of the building, such as vent pipe or fan housing. END OF CHAPTER FOUR V ROOF AND WATERPROOFING (8194) 4-20 INSPECTION