11/9/01

Listing of Test Specimens for Steel Moment Connection Tests

Compiled by Kurt McMullin San Jose State University June 1997

Research Tests from 1942 through 1996


This listing represents the available published literature on rigid steel moment-resisting frame connections. The purpose of the list is to allow for structural engineers to obtain a better understanding of the experimental test data available for different configurations of beam-to-column subassemblies. It was initially compiled as a part of my doctoral studies at the University of California at Berkeley. In my current role as an Assistant Professor at San Jose State University, I have been assisted in expanding the list though the research of my students. Their assistance in expanding the list is greatly appreciated.

11/9/01 MOMENT CONNECTION EXPERIMENTAL TESTS


Researcher (1) Johnston & Deits 1942 Brandes & Mains 1944 Specimen No. (2) JD-W9 JD-W10 JD-W20 JD-W21 BM-1 BM-2 BM-3 BM-4 BM-5 BM-6 BM-7 BM-8 BM-9 BM-10 BM-11 BM-12 BM-13 BM-14 BM-15 BM-16 BM-17 BM-18 BR-1W BR-1L BR-2W BR-2L BR-3W BR-3L BR-4W BR-4L BE-1W BE-1L BE-2W BE-2L BE-3W BE-3L BE-4W BE-4L Specimen (3) W18x47 W18x47 W14x34 W18x85 W12x25 W12x50 W18x47 W18x85 W18x85 W18x85 W18x85 W18x85 W18x85 W18x85 W18x85 W18x85 W18x85 W18x85 W18x85 W18x85 W18x85 W18x85 8x4x18 RSJ Flange Connection (4) Welded Plate Web Connection (5) None Mode (6) Yield Frac. Frac. Frac. Yield Yield Frac. Yield Frac. Frac. Yield Yield Frac. Frac. Frac. Frac. Frac. Frac. Frac. Frac. Frac. Frame M Test Set-up (7) Double Cant. N (8) M

Welded Plate

None

Double Cant.

Baker & Roderick 1952

Baker & Eickhoff 1955

5x3x11 RSJ

Frame

11/9/01 MOMENT CONNECTION EXPERIMENTAL TESTS


Researcher (1) Driscoll 1956 Specimen Specimen No. (2) (3) D-1W B10x17 D-1L B10x17 D-2W B8x13 D-2L B8x13 D-3W B10x17 D-3L B10x17 D-4W B8x13 D-4L B8x13 SSB-3L W12x36 SSB-3R SSB-4L SSB-4R DB-T4 W30x108 DB-T9W W12x36 DB-T9L W12x36 B4x13 NWD-1W B4x13 NWD-1L B4x13 NWD-2W B4x13 NWD-2L B4x13 NWD-3W B4x13 NWD-3L B4x13 NWD-4W B4x13 NWD-4L B4x13 NWD-5W B4x13 NWD-5L B4x13 NWD-6W B4x13 NWD-6L W8x17 NWD-7W NWD-7L W8x17 5x3x11 BC-UW BC-UL BC-LW BC-LL FDS-1 W8x13 FDS-2 W14x30 W24x100 FDS-3 FDS-5 W36x230 Flange Connection (4) Web Connection (5) Mode (6) Test Set-up (7) Frame N (8) M

Schilling, Schutz & Beedle 1956 Driscoll & Beedle 1957 Nelson, Wright & Dolphin 1957

Welded

Welded

Frame

Welded

Welded

L.B. L.B. None Yield

L Test Frame Frame Frame

Baker & Charlton 1958 Fisher, Driscoll & Schutz 1958

2-story Frame

Welded

Welded

L.B. L.B.

L Test

11/9/01 MOMENT CONNECTION EXPERIMENTAL TESTS


Researcher (1) Wakabayashi 1969 Specimen No. (2) W-1W W-1L W-2W W-2L W-3W W-3L PS-1 PS-2 PS-3 PS-4 PS-5 PS-6 PS-7 PS-8 P-1 P-2 PALS-1 PALS-2 PALS-3 PALS-4 PALS-6 PALS-7 PALS-8 2-Bay, 6-Story Dual System N-R1 N-R2 N-SR1 N-SR2 T-2 T-3 T-5 T-13 T-17 T-18 EP-3 EP-5 Specimen (3) H250x125 Flange Connection (4) Web Connection (5) Mode (6) Test Set-up (7) Frame N (8) M

Popov & Stephen 1970

Popov 1983 Popov, Amin, Louie & Stephens 1985

W18x50 W18x50 W18x50 W18x50 W24x75 W24x75 W24x75 W18x50 W24x76 W18x40 W18x40 PG 18 PG 18 PG 18 W18x71 W18x71 W16x31 W18x35 W18x40 W10x15

Full Pen. Weld

Full Pen. Weld Full Pen. Weld

P. Bolted Welded P. Bolted P. Bolted P. Bolted P. Bolted Welded None P-Bolted Bolted Bolted

Whittaker, Uang & Bertero 1987 Nader 1988

Welded

Welded

Frac. L.B. Frac. Frac. L.B. Frac. L.B. Frac. L.B. Frac. Frac. Frac. Frac. Frac. Frac. Frac. Frac. None

Cant.

Cant. Double Cant.

6-Story Frame

8 11 9 9 11 8 10 6 13 10 3 10 4 6 4 11 12 EQ

Welded Plate Welded Plate Bolted Bolted

Dbl. Angle Bolted Bolted Bolted

Tsai 1988

Engelhardt & Popov 1989

W18x40 W18x35 W21x44 W18x35 W18x35 W21x44 W12x22 W12x16

None None None None Frac. Frac. Frac. Frac. Frac. Frac. Frac. Frac.

Frame

EQ

Cant.

EBF EBF

5 4 3 5 6 6 13 12

11/9/01 MOMENT CONNECTION EXPERIMENTAL TESTS


Researcher (1) Harriott & Astaneh 1990 Whittaker, Uang & Bertero 1990 Engelhardt & Husain 1992 Specimen No. (2) HA-1 HA-2 HA-3 2-bay, 6-story Frame EH-1 EH-2 EH-3 EH-4 EH-5 EH-6 EH-7 EH-8 ES-1a ES-1b ES-2a ES-2b ES-3a ES-3b ES-5a ES-5b ES-6a ES-6b ES-7a ES-7b ES-8a ES-8b ES-9b EE-1T EE-1B EE-2T EE-2B EE-3T EE-3B EE-4T EE-4B EE-5T EE-5B Specimen (3) W18x50 Flange Connection (4) Bolted Flange Web Connection (5) Bolted None Bolted Welded Mode (6) Frac. Frac. Frac. None Test Set-up (7) Cant. N (8)

W16x31 W18x35 X18x40 W24x55 W24x55 W24x55 W18x60 W18x60 W21x57 W21x57 W21x57 W36x150

Welded

Frame

EQ

Engelhardt & Sabol 1994

Elnashai & Elghazouli 1994

H250x 130x 9x9

Full Pen. Weld Bolted Full Pen. Weld Bolted Full Pen. Weld Bolted Full Pen. Weld Bolted Full Pen. Weld Bolted Full Pen. Weld Bolted Full Pen. Weld Bolted Full Pen. Weld Bolted + PW Bolted Full Pen. Weld Bolted Full Pen. Weld Full Pen. Weld Bolted + PW Full Pen. Weld Bolted + PW Bolted FP Pen Weld Bolted FP Pen Weld Bolted FP Pen Weld Bolted FP Pen Weld Bolted VP Pen Weld Bolted VP Pen Weld Bolted FP Pen Weld Bolted FP Pen Weld Bolted FP Pen Weld Bolted FP Pen Weld Bolted FP Pen Weld Bolted Bolted

Frac. Frac. Frac. Frac. Frac. Frac. Frac. Frac. Frac. Frac. Frac. Frac. Frac. L.B. L.B. Frac. L.B. L.B. L.B. L.B. L.B. L.B. L.B. None

Cant.

Cant.

Partial 2-Story Frame

2 2 6 1 7 5 8 6 0.5 3 0.5 6.5 6.5 16 17 4.5 17 18 21 21 21 21 12 M M 6 6 9 9 EQ EQ EQ EQ

11/9/01 MOMENT CONNECTION EXPERIMENTAL TESTS


Specimen No. (1) (2) Tsai, Wu & TWP-TH1 Popov TWP-TH2 1995 TWP-TH3 TWP-TH4 TWP-TH5 TWP-TH6 TWP-TH7 TWP-TH8 TWP-TH9 TWPTH10 Jokerst J-1 1995 J-2 Blackman & BP-PN1 Popov BP-PN2 1995 BP-PN3 BP-NSF1 BP-NSF6 Xue, Kaufman, XKLF-A-2 Lu & Fisher XKLF-A-3 1996 XKLF-A-4 Researcher Specimen (3) PG 21 Flange Connection (4) Welded Web Connection (5) Bolted Mode (6) Frac. Frac. Frac. Frac. Frac. Frac. Frac. Frac. Frac. Frac. L.B. L.B. Frac. Frac. Frac. Frac. L.B. Frac. L.B. L.B. Test Set-up (7) Cant. N (8)

W30x90 W36x150

Welded Plate Welded Welded Welded Weld + Plate Haunched Welded Welded Welded

Bolt + Weld Bolted Bolted Bolted Welded Bolted Bolted Welded Welded

Cant. Cant.

W36x150

Cant.

15 22 4 1 4 7 9 4 7 14

NOTES: 1. Flange connection types: welded= full penetration weld with no rathole, full pen weld= traditional pre-Northridge connection, FP Pen= flange reinforcing plate with full pen weld through both beam flange and plate, VP Pen= vertical plates added to flange with fillet welds to column full pen weld to beam flange. 2. Web connection types: bolted= traditional pre-Northridge shear plate welded to column and bolted to web, P bolted= some bolts included for erection or service load that may or may not carry the full shear requirements for the connection, P W= full penetration weld between beam web and column flange. 3. Mode of failure: L.B. = local buckling, Frac. = fracture, Yield = yielding occurred in connection but testing was stopped before complete failure occurred, None = testing was stopped before any failure was established. 4. N = number of cycles of test, M means monotonic test.

11/9/01 REFERENCES American Society of Civil Engineers (1967). Bibliography on Bolted and Riveted Joints. ASCE Manuals and Reports on Engineering Practice, Number 48. Task Committee on Structural Connections of the Committee on Metals of the Structural Division. New York. Anderson, J. C. and Xiao, Y. (1995). Progress report on cyclic testing of the AAA connection specimens. A report to Sponsor: SAC Joint Venture. Department of Civil Engineering, University of Southern California, Los Angeles. Applied Technology Council (1992). Guidelines for Cyclic Testing of Components of Steel Structures. Redwood City, CA. Astaneh, A. (1993). "The innovative concept of semi-rigid composite beam" Proceedings, ASCE Structures Congress, Irvine California, April 1993. Astaneh-Asl, A. (1994). Seismic behavior and design os steel semi-rigid structures. Proceedings, First International Workshop and Seminar on Behavior of Steel Structures in Seismic Areas, STESSA 94. Timisoara, Romania. Astaneh, A., Nader, M. and Harriott, J. D. (1991). "Behavior and design considerations in semirigid frames." Proceedings, AISC National Steel Construction Conference, Washington, DC., June 5- 7. Attiogbe, E. and Morris G. (1991). Moment-rotation functions for steel connections. Journal of Structural Engineering, ASCE, Volume 117, Number 6, June, pages 1703 to 1739. Baker, J. F. and Charlton, T. M. (1958). A test on a two-storey single-bay portal structure. British Welding Journal, Volume 5, Number 5, May, page 226 to 238. Baker, J. F. and Eickhoff, K. G. (1955). The behavior of saw-tooth portal frames. Proceedings, Conference on the Correlation between Calculated and Observed Stresses and Displacements in Structures, Institute of Civil Engineers, page 107. Baker, J. F. and Roderick, J. W. (1952). Tests on full-scale portal frames. Proceedings of the Institution of Civil Engineers, Volume 1, Number 1, Paper Number 5838, January, pages 71 to 94. Ballio, G., and Calado, L. (1986). Steel bent sections under cyclic loads, experimental and numerical approaches. Costruzioni Metalliche, Number 1, in Italian and English. Ballio, G., Calado, L. Leoni, F., and Perotti, F. (1986). Numerical simulation of the cyclic behaviour of steel subassemblages. Costruzioni Metalliche, Number 5, in Italian and English. 7

11/9/01 Ballio, G., and Castiglioni, C. A. (1995). Seismic behaviour of steel sections. Journal of Constructional Steel Research, Volume 34, Number 1, pages 75 to 101. Ballio, G., and Castiglioni, C. A. (19XX). An approach to the seismic design of steel structures based on cumulative damage criteria. accepted for publication by Earthquake Engineering and Structural Dynamics. Ballio, G., Plumier, A. and Thunus, B. (1990). Influence of concrete on cyclic behavior of composite connections. IABSE Symposium, Bruxelles, BE. Ballio, G., and Zandonini, R. (1985). An experimental equipment to test steel structural members and subassemblages subject to cyclic loads. Ingegneria Sismica, Anno II, Number 2, pages 25 to 40. Bedair, O. and Sherbourne, A. (1994). A generalized approach to the local stability of stiffened plates part I - mathematical formulation. Proceedings, ASCE Structures Congress, Atlanta, GA. Bendigo, R. A., Hansen, R. M. and Rumpf, J. L. (1963). Long bolted joints. Journal of the Structural Division, ASCE, Volume 89, Number ST6, Proc. Paper 3727, December, pages 187 to 213. Bertero, V. V., Popov, E. P., and Krawinkler, H. (1970). Half-scale tests of subassemblages of multistory unbraced steel frames under cyclic loading. 3rd Japan Earthquake Engineering Symposium. Bertero, V. V., Popov, E. P., and Krawinkler, H. (1972). Beam-column subassemblages under repeated loading. Journal of the Structural Division, ASCE, Volume 98, Number ST5, Proc. Paper 8915, May, pages 1137 to 1159. Bertero, V. V., Krawinkler, H. and Popov, E. P. (1973). "Further studies on seismic behavior of steel beam-column subassemblages." EERC Report UCB/EERC-73/27, University of California at Berkeley, CA. Blackman, B., and Popov, E. P. (1995). "Studies in steel moment resisting beam-to-column connections for seismic-resistant design." EERC Report UCB/EERC-95/11, University of California at Berkeley, CA. Disque, R. O. (1964). Wind connections with simple framing. Engineering Journal, AISC, Volume , Number 3, Third Quarter, July, pages 101 to 103. Driscoll, G. C., Jr. (1956). Test of two-span gabled portal frame. Proceedings, AISC National Engineering Conference, 74. Driscoll, G. C. Jr. and Beedle, L. S. (1957). The plastic behavior of structural members and frames. The Welding Journal, Volume 36, Number 6, June, pages 275-s to 286-s. 8

11/9/01

Engelhardt, M. D. and Husain, A. S. (1992). Cyclic tests on large scale steel moment connections. Report No. PMFSEL-92-2, Phil M. Ferguson Structural Engineering Laboratory, Department of Civil Engineering, Universtiy of Texas at Austin. Engelhardt, M. D. and Sabol, T. A. (1994). Testing of welded steel moment connections in response to the Northridge earthquake. Progress report to the AISC Advisory Subcommittee on Special Moment Resisting Frame Research. Engelhardt, M. D., Winneberger, T., Zekany, A. J. and Potyraj, T. J. (1996). The dogbone: connection - Part II. Modern Steel Construction, AISC, August, pages 46 to 55. Etheta, C. B. and Owens, G. W. (1981). A semi-rigid connection for composite frames: initial test results. Proceedings, International Conference on Joints in Structural Steelwork, Pentech Press, London. Harriott, J. D. and Astaneh, A. (1990). "Cyclic behavior of steel top-and-bottom plate connections." EERC Report UCB/EERC-90/19, University of California at Berkeley, CA. Johnston, B. and Deits, G. R. (1942). Tests of miscellaneous welded building connections. The Welding Journal, Volume 21, Number 1, January, pages 5-s to 27-s. Jokerst, M. (1995). Human Genome Laboratory Steel Joint Test - Technical Brief Forell/Elsesser Engineers, Inc., San Francisco. Kanno, P. and Deierlien, G. (1994). Cyclic behavior of joints between steel beams and reinforced concrete columns. Proceedings, ASCE Structures Congress, Atlanta, GA. Kaufmann, E. J. and Fisher, J. W. (1995). Simulated beam flange-to-column flange tension tests. ATLSS Engineering Research Center, Lehigh University, Bethlehem, Penn. Kim, S. W., (1969). Experiments on A572 (grade 65) steel beams. Report No. 343.4, Fritz Engineering Laboratory, Lehigh University, Bethlehem, PA., August. Kishi, N., Chen, W. F. (1990). Moment-rotation relations of semi rigid connections with angles. Journal of the Structural Division, ASCE, Volume 116, Number 7, July, pages 1813 to 1834. Krawinkler, H., Bertero, V. V. and Popov, E. P. (1971). "Inelastic behavior of steel beam-tocolumn subassemblages." EERC Report UCB/EERC- 71/07, University of California at Berkeley, CA. Moore, D. B., Nethercot, D. A., Kirby, P. A. (1993). Testing steel frames at full scale. Building Research Establishment (BRE), No. SP91021, January. 9

11/9/01 Naeim, F., DiJulio, Jr., R., Benusksa, K., Reinhorn, A. M. and Li, C. (1995). "Seismic response of haunch repaired steel SMRFs: Analytical modeling and a case study." SAC Joint Venture Report No. SAC-95-07, SAC Joint Venture Partnership, Sacramento, CA. Naka, T., Kato, B., and Watabe, M. (1967). Research on the behavior of steel beam-to-column connections. Laboratory for Steel Structures, Department of Architecture, University of Tokyo. Plumier, A. (1994). Behavior of connections. Journal of Constructional Steel Research, Volume 29, pages 95 to 119. Popov, E. P. (1982). Seismic steel framing systems for tall buildings. Engineering Journal, AISC, Volume 19, Number 3, Third Quarter, pages 141 to 149. Popov, E. P. (1983). "Seismic moment connections for moment-resisting steel frames." EERC Report UCB/EERC-83/02, University of California at Berkeley, CA. Popov, E. P., Amin, N. R., Louie, J. C., and Stephen, R. M. (1985). Cyclic behavior of large beamcolumn assemblies. Earthquake Spectra, Volume 1, Number 2, pages 203 to 238. Popov, E. P. and Franklin, H. A. (1966). Steel beam-to-column connections subjected to cyclically reversed loading. Preliminary Report presented at the 1965 annual meeting of the Structural Engineers Association of California. American Iron and Steel Institute, New York, February. Popov, E. P. and Pinkney, R. B. (1969). Cyclic yield reversal in steel building connections. Journal of the Structural Division, ASCE, Volume 95, Number ST3, March, pages 327 to 353. Popov, E. P. and Pinkney, R. B. (1971). Cyclic yield reversal in steel building connections. Engineering Journal, AISC, Volume 8, Number 3, July, pages 66 to 79. Popov, E. P and Stephen, R. M. (1970). "Cyclic loading of full-scale steel connections." EERC Report UCB/EERC-70/03, University of California at Berkeley, CA. Popov, E. P and Stephen, R. M. (1972). "Cyclic loading of full-size steel connections." Bulletin No. 21, Steel Research for Construction, American Iron and Steel Institute, New York, February. Puhali, R., Smotlak, I. and Zandonini, R. (1990). Semi-rigid composite action: experimental analysis and a suitable model. Journal of Constructional Steel Research, Special Issue on Composite Construction, Volume 15, Numbers 1 & 2. Rogec, J. E., Huang, J. S. and Chen, W. F. (1973). Test of a fully-welded beam-to-column connection. Publication No. 188, Welding Research Council.

10

11/9/01 Rosa, A., Lu, L. W. and Viscomi, B. (1994). ATLSS connectors in semi-rigid composite connections. ASCE Structures Congress, Atlanta, GA. Ruzek, J. M., Knudsen, K. E., Johnston. E. R., and Beedle, L. S. (1954). Welded portal frames tested to collapse. The Welding Journal, Volume 33, Number 9, September, page 469-s to 480-s. Shanmugam, N. E. and Ting, L. C. (1995). "Welded interior box-column to I-beam connections." Journal of Structural Engineering, ASCE, Volume 121, Number 5, pages 824 to 830. Shilling, G. C., Schutz, F. W., Jr., and Beedle, L. S. (1956). Behavior of welded single-span frames under combined loading. The Welding Journal, Volume 35, Number 5, May, pages 234-s to 252-s. Sivakumaran, K. and Chen, S. (1994). Seismic behavior of type PR steel frames. ASCE Structures Congress, Atlanta, GA. Takanashi, K. (1994). Experimental behavior of multi-storey steel frames. Journal of Constructional Steel Research, Volume 29, pages 175 to 189. Tang, D. and Clough, R. W. (1979). Shaking table earthquake response of steel frame. Journal of the Structural Division, ASCE, Volume 105, Number ST1, January, pages 221-243. Ting, L. C., Shanmugam, N. E. and Lee, S. L. (1993). Design of I-beam to box-column connections stiffened externally. Engineering Journal, AISC, Volume 30, Number 4, Fourth Quarter, pages 141 to 149. Tsai, K. C. (1988). Steel Beam-Column Joints in Seismic Moment Resisting Frames. A dissertation submitted to the Faculty of the Graduate School of the University of California at Buffalo in partial fulfillment of the requirements for the degree of Doctorate of Philosophy Tsai, K. C., Wu, S. and Popov, E. P. (1995). Experimental performance of seismic steel beam-tocolumn moment joints. Journal of Structural Engineering, ASCE, Volume 121, Number 6, June, pages 925 to 931. Uang, C. M. and Bondad, D. (1995). Progress report on cyclic testing of three repaired UCSD specimens. Report to SAC Joint Venture, University of California, San Diego, CA. Van Dalen, K. and Godoy, H. (1982). Strength and rotational behavior of composite beam-tocolumn connections. Canadian Journal of Civil Engineering, Septembre. Wakabayashi, M.. (1969). Full scale tests using portal frames without bracing subjected to constant vertical and varying horizontal load. Transactions, Architectural Institute of Japan, extra, August. 11

11/9/01

Whittaker, A. S., Uang, C. M. and Bertero, V. V. (1987). "Earthquake simulation tests and associated studies of a 0.3-scale model of a six-story eccentrically braced steel structure." EERC Report UCB/EERC-87/02, University of California at Berkeley, CA. Whittaker, A. S., Uang, C. M. and Bertero, V. V. (1990). "An experimental study of the behavior of dual steel systems." EERC Report UCB/EERC-88/14, University of California at Berkeley, CA. Witteveen, J., Stark, J. W. B., Bijlaard, F. S. K. and Zoetemeijer, P. (1982). Welded and bolted beam-to-column connections. Journal of the Structural Division, ASCE, Volume 108, Number ST2, February, pages 433 to 455. Xue, M., Kaufmann, E. J., Lu, L. W. and Fisher, J. W. (1996). Achieving ductile behavior of moment connections - Part II. Modern Steel Construction, June, pages 38 to 42. Yang, T. S., and Popov, E. P. (1995). "Behavior of pre-Northridge moment resisting steel connections." EERC Report UCB/EERC-95/08, University of California at Berkeley, CA.

12