ECONOMICAL PUMPING MAIN CALCULATIONS

From Sump at Hill to OHSR

2014
Demand in lpm

Growth Rate( Percentage):

0.5

Base Year

Prospective

Ultimate

2014

2024

2034

MWL(OHSR)=

100.7

109

115

FVL(Sump)=

45.97

104.1667 104.16667

Design of Economic size of Pumping Main

1st 10 years

GL(Sump)=

46.97

2nd 10 Years

Year of Comm (Initial)

0.125 MLD

Discharge at Installation

0.125

0.131 MLD

Prospective

0.131 MLD

At end of 10 Years

0.131

0.138 MLD

Ultimate

0.138 MLD

Avg Discharge

0.128

0.135 MLD

Length of pipeline

115 LPM

569.00 M

Static Head for Pump

56.73 m

Combined Efficiency

Hours of Pumping at end of 10yrs

65 %

Cost of pumpset

16000 Rs./kw

15.63

15.65 Hrs

KW required @

0.050 H1

0.052 H2

65 %Efficiency

14 %

Avg days

Life of pumpsets
Energy charges
Hours of pumping
Stand By

10 years

Annual cost of electrical energy


Pump cost Captalised
Energy charges captalised

16 Hours

16

Average hours of Pumping for avg discharge

Interest rate

7.5 Rs./kw

16

365

365

42796.95 KW1
0.27
5.216

42847.83 KW2
0.27
5.216

50 %
INTERNAL DIA.

Design Period
Static Head for Pipes

Appx. Dia

67

mm

20

PIPE

CLASS

DIA (mm)

THICKNESS

55.73

HDPE
HDPE
HDPE
HDPE
HDPE
HDPE

8 Kg/sqcm

100
200
225
250
280
315

12.10
13.40
15.10
16.70
18.70
21.00

8 Kg/sqcm
8 Kg/sqcm
8 Kg/sqcm
8 Kg/sqcm
8 Kg/sqcm

Finished Item
cost (Rs. /RM)
C

75.80
173.20
194.80
216.60
242.60
273.00

140
140
140
140
140
140

947.00
1157.00
1448.00
1779.00
2214.00
2849.00

CR

E (Kg/m2)

1
1
1
1
1
1

90000000
90000000
90000000
90000000
90000000
90000000

Sl.No

1
2
3
4
4
5

Dia in mm

Type

Class

100

HDPE

8kg/sqcm

200

HDPE

8kg/sqcm

225

HDPE

10kg/sqcm

250

HDPE

10kg/sqcm

280

HDPE

10kg/sqcm

315

HDPE

10kg/sqcm

Static
head

55.73
55.73
55.73
55.73
55.73
55.73

water
hammer
Head

Total
Head

19.65

Head Limits
Pressure Check
Static

Pumping

75.38

80.00

80

OK

2.59

58.32

80.00

80

OK

2.18

57.91

100.00

80

OK

1.75

57.48

100.00

80

OK

1.10

56.83

100.00

80

OK

1.10

56.83

100.00

80

OK

Velocity
(m/s)

0.53
0.10
0.08
0.07
0.04
0.04

Pipe Desc

Pipe rate

Tot Cap cost


(Rs. in
lakhs)

100 HDPE-8kg/sqcm 947.00


200 HDPE-8kg/sqcm 1157.00
225 HDPE-10kg/sqcm1448.00
250 HDPE-10kg/sqcm1779.00
280 HDPE-10kg/sqcm2214.00
315 HDPE-10kg/sqcm2849.00

The Most Economical Pipe is


100 HDPE-8kg/sqcm
Total head excluding W.H =
58.52 m <80 m, Hence O.K.
Total head including W.H =
78.17 m < 1.1x80m. Hence O.K., without providing water hammer controlling devices on pipe line.
Table 1 showing velocity and loss of Head for different pipe size

Dia in mm

Frictional Head loss per


1000 m

S.No.
1
2
3
4
5
6

1st stage
4.05
0.08
0.04
0.03
0.02
0.01

100
200
225
250
280
315

2nd stage
4.45
0.08
0.05
0.03
0.02
0.01

Velocity in m/s
I stage
flow
0.504
0.099
0.073
0.067
0.058
0.042

Total Head in 'm' for 569m pipe lengths including 56.73 m of static Head

II stage
flow
0.531
0.099
0.083
0.067
0.058
0.042

Frictional
Losses
2.30
0.05
0.02
0.02
0.01
0.01

I stage flow
Total in M
Other
Losses
0.23
59.26
0.00
56.78
0.00
56.76
0.00
56.75
0.00
56.74
0.00
56.74

Table II showing Kilowatts required and cost of Pump sets for differenct pipe sizes

S.No.

1st stage flow

Int dia of pipe

KW
required

H1
Total Head loss

1
2

100
200

59.26
56.78

4.40
4.22

II nd stage flow
Cost of
KW
H2
Pump set
required
Rs.in lakhs Total Head loss
0.70
59.52
4.66
0.68
56.78
4.45

Cost of
Pump set
Rs.in lakhs
0.75
0.71

II stage flow
Frictional Losses
Other
Losses
2.53
0.25
0.05
0.00
0.03
0.00
0.02
0.00
0.01
0.00
0.01
0.00

Total in M

59.52
56.78
56.76
56.75
56.74
56.74

18.94
19.55
21.20
23.08
25.56
29.17

3
4
5
6

225
250
280
315

56.76
56.75
56.74
56.74

4.22
4.22
4.22
4.22

0.67
0.67
0.67
0.67

56.76
56.75
56.74
56.74

4.44
4.44
4.44
4.44

0.71
0.71
0.71
0.71

Table III Showing comparative statement of overall cost structure of pumping main

Total Head in mts


S.No.

Int dia of pipe

1
2
3
4
5
6

100
200
225
250
280
315

1st Stage

59.26
56.78
56.76
56.75
56.74
56.74

Class of
2nd stage
Pipe reqd

59.52
56.78
56.76
56.75
56.74
56.74

8kg/sqcm
8kg/sqcm
10kg/sqcm
10kg/sqcm
10kg/sqcm
10kg/sqcm

Rate per
m length
(Rs.)

947.00
1157.00
1448.00
1779.00
2214.00
2849.00

1st stage of flow


Cost of
Annual cost
pipe line
Cost of
Energy charges
of energy
(Rs. in
pumpsets
capitalised
charges
lakhs)

5.39
6.58
8.24
10.12
12.60
16.21

0.70
0.68
0.67
0.67
0.67
0.67

1.89
1.81
1.81
1.81
1.80
1.80

9.83
9.42
9.42
9.42
9.41
9.41

Total
Capitalise
d cost

Cost of
pumpsets

15.93
16.68
18.33
20.21
22.69
26.30

0.75
0.71
0.71
0.71
0.71
0.71

2nd stage of flow


Annual cost
Energy
of energy
charges
charges
capitalised

2.00
1.90
1.90
1.90
1.90
1.90

10.41
9.94
9.93
9.93
9.93
9.93

Pipe

CR

PVC

PVC

HDPE

HDPE

AC

AC

CI

0.85

CI

DI

DI

PSC

PSC

BWSP

BWSP

GRP

GRP

7
8
9
10
11
12
13
14
15
16

17
18

160
155

Cap Cost

155
150

Series1

145

Pipe
Cap Cost
140
100 HDPE-8kg/sqcm 18.94
135
180 HDPE-8kg/sqcm
200 HDPE-8kg/sqcm
19.55
225 HDPE-10kg/sqcm21.20

200 HDPE-8kg/sqcm

225 HDPE-8kg/sqcm

Pipe

e.

17
18
19
20

of flow

Grand
Intl cap
total
investmt for
Capitalise
p/s and
d (Rs. in
annual elec

3.01
2.87
2.87
2.87
2.87
2.87

18.94
19.55
21.20
23.08
25.56
29.17

PVC

HDPE

AC

CI

DI

PSC

BWSP

GRP

PVC

HDPE

AC

CI

DI

PSC

BWSP

63

63

80

80

100

350

250

350

4kg/sqcm 4kg/sqcm Class-10

LA

K7

6kg/sqcm

12kg/sqcm

75

75

100

100

125

400

300

400

6kg/sqcm 6kg/sqcm Class-15

K8

8kg/sqcm

14kg/sqcm

90

90

125

125

150

450

350

450

10kg/sqcm 8kg/sqcm Class-20

K9

10kg/sqcm

16kg/sqcm

110

110

150

150

200

500

400

500

10kg/sqcm Class-25

K10

12kg/sqcm

18kg/sqcm

125

125

200

200

250

600

450

600

14kg/sqcm

20kg/sqcm

140

140

250

250

300

700

500

700

16kg/sqcm

22kg/sqcm

160

160

300

300

350

800

600

800

24kg/sqcm

180

180

350

350

400

900

700

900

26kg/sqcm

200

200

400

400

450

1000

800

1000

28kg/sqcm

225

225

450

450

500

1100

900

250

250

500

500

600

1200

1000

280

280

600

600

700

1300

1100

315

315
355
400

700
750
800
850

700
750
800
900

750
800
900
1000

1200
1300
1400
1500

900

1000

1100

1600

1000

1050

1200

30kg/sqcm

IF(C36=$AO$2,$AO$3:$AO$5,IF(C36=$AP$2,$AP$3:$AP$6,IF(C36=$AQ$2,$AQ$3:$AQ$6,IF(C36=$

1000

PVC

GRP

HDPE

AC

CI

DI

PSC

BWSP

GRP

3Bar

315

400

1000

1050

1200

1300

1600

1000

6Bar

280

355

900

1000

1100

1200

1500

900

9Bar

250

315

850

900

1000

1100

1400

800

12Bar

225

280

800

800

900

1000

1300

700

15Bar

200

250

750

750

800

900

1200

600

22kg/sqcm

180

225

700

700

750

800

1100

500

24kg/sqcm

160

200

600

600

700

700

1000

450

26kg/sqcm

140

180

500

500

600

600

900

400

28kg/sqcm

125

160

450

450

500

500

800

350

30kg/sqcm

10

110

140

400

400

450

450

700

11

90

125

350

350

400

400

600

12

75

110

300

300

350

350

500

13
14
15
16

63

90
75
63

250
200
150
125

250
200
150
125

300
250
200
150

450
400
350
300

17

100

100

125

250

18

80

80

100

PVC

HDPE

Q$2,$AQ$3:$AQ$6,IF(C36=$AR$2,$AR$3:$AR$5,IF(C36=$AS$2,$AS$3:$AS$6,IF(C36=$AT$2,$AT$3:$AT$8,IF(C36=$AU$2,$AU$3:$AU$12,IF(C36=$AV$2,$AV$3:$AV$7,"NOT AVLBLE"))))))))

PUMPING MAIN TO HILL 2 ELSR


1 Natural Ground Level of the proposed 150 kl Sump at Hill No.2 in IT Park:

46.97 m

2 Proposed Ht of Centifugal pump

50.97 m

2 Low Ground Level of the proposed 150 kl Sump at Hill No.2 in IT Park:
3 Length of Pumping Main from the Proposed sump at Hill 2 to the ELSR on Hill 2

45.97 m
428.00 m

4 Natural Ground Level of the ELSR on Hill 2:

85.2 m

LVL

5 LWL of Existing ELSR on Hill No.2

95.7 m

LVL

6 MWL of Existing ELSR on Hill No.2:

100.7 m

LVL

7 Static Head : (MWL of ELSR LWL of Sump)

56.73 m
0.46
7.6 Q

8 Approximate dia
8 Loss of Head due to Friction

hf

9 Driving Head
10 Total Head:

=(1.1{[607980*Q1.81 ]/(d4.81) )} )
Total Hf
consider

60.00 m

215.43 mm
3.0 m/Km
1.27 m
2.00 m

200mm dia

Hence, the Head is considered as 100 m.60.00 m


11 Capacity of ELSR in Hill No.2: 225 KL
Total Demand of water per day

1380 KL

12 Hours for filling Proposed: 16 Hours( Considering as uninterrupted Power Supply)


13 Discharge per Hour

86250 LPH

14 Discharge per Minute

1437.5 LPM

Design the Pump for 720 LPM @ 62m head and one standby
15 Design of Pump
H.p=
QXrXh/4500Xn
for Centifugal pump consider efficienty is 65 %

16 Design of Pumping Main pipe line

Total Head = Pumping Head + Water Hammer Head


WHH

Total Head

say 7.5 HP

6.33 HP
and One standby

Water Hammer Cociffient X Q


94.282707
154.28 m

200mm dia of K-9 DI pipe

Distribution system
of Hill No 2
Data
MWL of OHSR
1 GL at OHSR
2 Highest GL in distrubution syst
3 Min assumed residual head
4 Frictinal losses in pipe line
hence staging of OHSR is
LWL

100.7
+ 85.2
87.2
3
2

mts
mts
mts
assume @2mt/KM
7.00
95.7

Max allowed frictional losses in distribution system is 3mts per km


Staging of OHSR
IS 3370 of 2009
Code for water retainng structures
Water retaining structures should be designed to uncracked sections and min M30
Water retaining structures should be designed sesmic zones and wind loads

Hf

=1.1{[607980*Q

1.81

]/(d

4.81)

)}
velocity

Height
MWL

5.00
=LWL+ht

100.70

=Q/A
QinLPM
A in Sqmt

=MWL-GL

Demand
Daily
along pipe Balance
demand
Slno
Pipe demand line
From To (in KL)
(in KL)
1
2
3
4
4A
5
1
R
1
690
690
0
2
1
2
690
460
230
3
1
3
230
120
110
4
1
4
120
120
0

Assume
d
losses(
%)
10%
6
0.1
0.1
0.1
0.1

Hours of
supply of
deailey
demand
8 Hrs
7
14
14
14
16

Provide dia in
Approx
mm HDPE 80
Length dia in
demand in KM mm
CL 4kg/cm2
LPM
Nominal ID
8
9
10
11
12
821
0.15
172
160
160
548
0.60
140
110
110
143 1.165
72
90
90
125
0.45
67
75
75
TTL

Frictional losses
Per km
Total
13
14
3.15
0.47
9.18
5.51
2.12
2.47
4.00
1.80

Hydraulic gradient
level
Start
End
15
16
100.7 100.23
100.23
94.72
100.23
97.76
100.23
98.43

GL
Residual head
Start
End
Min
Max
17
18
21
22
85.2
86.5
13.73
18.73
86.5
87.2
7.52
12.52
86.5
84.7
13.06
18.06
84.0
76.0
22.43
27.43

Static
head
23
14.20
13.50
16.00
24.70

Type /
class of
pipe
24
HDPE 160
HDPE 110
HDPE 90
HDPE 90

Velocity
25
0.68
0.96
0.37
0.47

A in Sqmt

Remarks
26

Distribution system
of Hill No 2
Data
MWL of OHSR
1 GL at OHSR
2 Highest GL in distrubution syst
3 Min assumed residual head
4 Frictinal losses in pipe line
hence staging of OHSR is
LWL

Height
MWL

Demand
Daily
along pipe Balance
demand
Slno
Pipe demand line
From To (in KL)
(in KL)
1
2
3
4
4A
5
1
R
1
690
690
0
2
1
2
690
460
230
3
1
3
230
120
110
4
1
4
120
120
0

100.7
+ 85.2
87.2
3
2

5.00
=LWL+ht

Assume
d
losses(
%)
10%
6
0.1
0.1
0.1
0.1

mts
mts
mts
assume @2mt/KM
7.00
95.7

Max allowed frictional losses


Staging of OHSR
IS 3370 of 2009
Water retaining structures sh
Water retaining structures sh

100.70

Hours of
supply of
deailey
demand
8 Hrs
7
14
14
14
16

TTL
Length
demand in KM
LPM
8
9
821
0.15
548
0.60
143 1.165
125
0.45

Max allowed frictional losses in distribution system is 3mts per km


Staging of OHSR
IS 3370 of 2009
Code for water retainng structures
Water retaining structures should be designed to uncracked sections and min M30
Water retaining structures should be designed sesmic zones and wind loads

Hf

Provide dia in
mm HDPE 80
2
CL 4kg/cm
Nominal ID
10
11
12
172
160
160
140
110
110
72
90
90
67
75
75

Approx
dia in
mm

=1.1{[607980*Q1.81 ]/(d4.81) )}

Frictional losses
Per km
Total
13
14
3.15
0.47
9.18
5.51
2.12
2.47
4.00
1.80

Hydraulic gradient
level
Start
End
15
16
100.7 100.23
100.23
94.72
100.23
97.76
100.23
98.43

GL
Start
17
85.2
86.5
86.5
84.0

End
18
86.5
87.2
84.7
76.0

Residual head
Min
21
13.73
7.52
13.06
22.43

velocity

=Q/A
QinLPM
A in Sqmt

=MWL-GL

Static
head

Residual head
Max
22
18.73
12.52
18.06
27.43

23
14.20
13.50
16.00
24.70

Type /
class of
pipe
24
HDPE 160
HDPE 110
HDPE 90
HDPE 90

Velocity Remarks
25
0.68
0.96
0.37
0.47

26