Академический Документы
Профессиональный Документы
Культура Документы
Introduction
Introduction
A well completion consists of a series of operations that are necessary to enable a well to produce(and to sustain the production of) hydrocarbons following the installation and cementing of the casing. Casing installation
Well Casing
Casing Head
The casing head is the lowest part of the wellhead assembly and is almost always connected to the surface casing string. It supports subsequent drilling wellhead and completion equipment