Вы находитесь на странице: 1из 2

Country:

International

Home

Sitemap

Contact

Login

Please Enter A Search Item

Formwork Systems
About MEVA Fields of expertise Products Concrete Pressure Calculator News Download Mediathek Press

Breaking record after record


The Burj Khalifa the Tower of Dubai
The Burj Khalifa will be the highest building ever erected by mankind. The exact height is a being kept secret in order not prevent any competitor surpassing it. The final height will exceed 800 m (2,625 ft). After completion in 2009, 35 million visitors from all over the world are expected every year. The Burj will beat a long list of records: It will bet he highest structure ever, the building with the highest habitable level and the highest viewing platform. In June 2007, the Burj Dubai surpassed the Tapei 101 and reached the status of being the highest building in the world.

Download
GIF (300 dpi) [1,92 kB] TIF (300 dpi) [21,87 MB] JPG (72 dpi) [45,94 kB]

TIF (300 dpi) [22,89 MB] JPG (72 dpi) [52,37 kB] JPG (300 dpi) [5,79 MB] JPG (72 dpi) [64,34 kB] JPG (300 dpi) [821,44 kB] JPG (72 dpi) [76,45 kB]

The MevaDec slab formwork system achieved a record-breaking 154 levels and 224,808 m! without a single re-facing and without a single delay.

PNG (300 dpi) [33,53 kB] PNG (72 dpi) [5,07 kB] JPG (300 dpi) [2,96 MB] JPG (72 dpi) [71,67 kB]

Structural works have been completed on the Burj Dubai, the worlds highest building. Cladding and steel works are continuing. The Desert Flower: Design of the Burj Khalifa The tower is composed of three elements arranged around a central core. A Y-shaped floor plan maximizes views of the Persian Gulf. As the tower rises, it tapers to minimise wind impact which is awesome: the antenna at the top of the Burj is designed for a deflection of +/- 12 m! The tower will cover a floor space of 4.000.000 m!. An Armani Hotel with 403 apartments will occupy the lower 37 floors. Floors 45 through 108 will have private apartments. Offices and suites occupy the rest, except for a 123rd floor The footprint of the tower resembles lobby and 124th floor observation deck, the the shape of a desert flower. The highest in the world. tower tapers as it rises in order to reduce wind resistance.

Text as DOC

Services
Print preview Add to watchlist

MEVAs drop-head technology allows the panels to be stripped and moved to the next cycle while post-shore remain in place to support the freshly poured slab.

The MevaDec slab formwork panels are so light, they are moved by hand. No crane is needed. Quick-lowering system enables 3 day-per-slab cycle with the MevaDec slab formwork system The biggest share of the on-site concrete works is dedicated to the slabs totalling 224,808 m! (532 slabs on 154 floor levels) MEVA supplies a complete formwork solution with its slab formwork system MevaDec. A total of only 3,000 m! of MevaDec slab formwork are required to supply the entire construction process. The slabs are poured at 6 pm formwork is stripped at noon the following day. Two factors help to keep up this pace: The MevaDec drop head with quick-lowering system allows stripping the panels and beams while the props remain as reshoring. The low weight allows the panels to be transferred to the next floor level by using a lifting gear. 100% wood-free, all-plastic facing avoids re-facing Plywood facing would have disintegrated after a number of uses, requiring re-facing. Building at great heights, this would have meant costly, time-wasting logistics and handling effort or excessive, expensive inventory. Only the MevaDec with its unique all-plastic, 100% woodfree facing copes with unlimited re-uses and never needs refacing. The MEVA claim was proved true up to level 154, when structural works were completed.

Turner Construction (U.S.A.) acts as project 6 - MEVA employs a 100% woodmanager for contractor Emaar Properties free, all-plastic facing in all its The tower, designed by Skidmore, Owings and formwork system. The facing copes Merrill, who also designed the Sears Tower in with unlimited re-uses, is nailable like Chicago and the Freedom Tower in New York plywood, never rots nor warps and City, is being built under the auspices of Turner can be cleaned on site using a highConstruction (USA). The consortium consists of pressure washer. Samsung (Korea), BeSix (Belgien) and Arabtec (United Arab Emirates) and is managed by Samsung. As a result of the spotless track record in the Burj Khalifa, Turner Corporation officially recommends the MevaDec slab formwork system as the forming solution in high-rise construction. Back to list

top MEVA Schalungs-Systeme GmbH Terms Imprint

Вам также может понравиться