Item Description

Cement bag cutting & feeding into Silo. Workshop area Maintenance Store Area Maintenance Laboratory area maintenance Site Maintenance Work AFCONS Area Maintenance Site maintenance Work (Wages Payment)

Unit
MT Sqm Sqm Sqm LS Sqm LS

Quantity
1,027.200 490.659 107.987 833.550 14.553 142.077 23.707 5.911 1,017.200 1,150.453 15.726 709.259 499.000 12.948 12.948 4.243 2.627 16.023

Site Maintenance Work LS Charges for Pile Boring, cage lowering Rmt Charges for Tremmie lowering, bentonite Cum flushing, pile concreting Charges for Bentonite mixing and MT arrangement for bentonite shifting to pile bore Charges for segment concreting with pipe Cum line Per Day / Deployment of adequte traffic marshals Per Head for day and night Charges for Pile cap reinforcement cutting, MT bending at yard as per BBS Charges for Pile cap reinforcement fixing at MT site as per drawing & BBS Charges for Pier reinforcement cutting, MT bending at yard as per BBS Charges for Pier reinforcement fixing at site MT as per drawing & BBS Charges for applying one coat of Cement MT Slurry in Reinforcement Bar . Charges for Pile Cage Reinforcement cutting, bending, fixing, lapping, cover MT block fixing, hook fixing including all toos and tackles, manpower etc. Charges for Pile cap reinforcement cutting, MT bending at yard as per BBS Charges for Pile cap reinforcement fixing at MT site as per drawing & BBS Charges for Pier & Pier cap reinforcement cutting, bending at yard as per BBS Charges for Pier & Pier cap reinforcement fixing at site as per drawing & BBS Charges for applying one coat of Cement Slurry in Reinforcement Bar . Charges for Segment Reinforcement steel shifting, cutting, bending etc. Charges for Shifting Reinforcement from steel yard to work site Charges for Inhibitor solution painting Charges for Helical & Anchor cone fixing Charges for Pile Head Chipping Charges for Segment Reinforcement steel shifting, cutting, bending etc. Charges for Shifting Reinforcement from steel yard to work site Charges for Inhibitor solution painting Charges for Segment Reinforcement steel shifting, cutting, bending etc. Charges for Shifting Reinforcement from steel yard to work site Charges for Inhibitor solution painting Charges for segment profiling Charges for shuttering & De-Shuttering (For Segments S1, S2, S4) Charges for ventilation pipe fixing Charges for Buffing, Oiling, Cleaning for soffit Bed L/C for writing nomenclature on segment concrete surface Charges for sand blasting on segment Charges for painting on parapet shutter, segment, pier and other structural works Charges for other fabrication (Segment shutter repair) Barricading board Fabrication work MT

78.407

26.121 26.121 5.809

MT MT MT MT MT Sqm CUM MT MT MT MT MT MT RM Sqm Nos Sqm Nos Sqm MT MT MT

3.647 110.337 32.088 32.088 32.088 8.000 46.032 84.993 84.993 84.993 14.296 14.296 14.296 15.500 46.621 12.000 6.290 254.000 494.998 14.618 9.174 15.844