Вы находитесь на странице: 1из 4

4/22/2014

Bored Piles - Bilfinger Spezialtiefbau GmbH

Bored Piles
The large number of pile systems currently available on the market reflects the significance of pile foundations. Bored piles can be either used as single foundation piles (on/offshore), pile groups, inclined piles, or in various combinations for retaining walls. In general, bored piles can be installed in a variety of soils including very soft clays, dense sands and hard rock. Various drilling techniques and excavation tools are employed as needed. Bilfinger offers the following methods to excavate piles of various diameters depending on the soil conditions: Rotary Drilling Method Drive-Drill Excavation Method (Grab + Chisel) Reversed Circulation Method (RCD) Airlifting Method (and combinations with RCD) Flush drilling Method (for smaller diameter) Down-the-Hole-Hammer Drilling Method Blasting Methods If required, we own equipment to install steel casings using the following methods: <dir><dir> Driving (Drop Weight and Hammers) Vibrating (Vibro-hammers) Oscillating (VRM) Rotating (RDM) Pneumatic Installation (Hochstrasser-Weise Method) If casings are not required, or cannot be used, we can stabilize the borehole with water, bentonite or polymer. If the surrounding soils are stable enough, the continuous flight auger method can be used for drilling without any support. We also offer energy pile installation. These piles combine a load bearing capacity with the ability to retrieve thermal energy from the surrounding ground. Pile test methods like static, dynamic or even the O-cell test method are among our standard practices. We have performed several vertical compression pile tests up to 50 MN.

Downloads
Bangkok/Thailand, Bang Na Expressway Bored Piles (Construction Period: 01/1997 - 07/1999) [PDF, 117 KB]

Bangkok/Thailand, Second Stage Highway Bored Piles (Construction Period: 07/1990 - 06/2000) [PDF, 211 KB]

http://www.spezialtiefbau.bilfinger.com/en/services/deep-foundations/bored-piles/

1/4

4/22/2014

Bored Piles - Bilfinger Spezialtiefbau GmbH

Basel/Switzerland, Building Pit Roche Building 1 (Construction Period: 02/2011 - 02/2012) [PDF, 4.6 MB]

Berlin, Shopping Mall Stephankiez (Construction Period: 02/2009 - 07/2009) [PDF, 111 KB]

Cologne, Joint Venture Rheinpark Cologne (Construction Period: 02/2006 - 09/2006) [PDF, 533 KB]

Cologne, Test Pile Rheinhallen Rheinpark Cologne (Construction Period: 12/2005 - 02/2006) [PDF, 520 KB]

Darmstadt, Pile Load Test FAIR (Construction Period: 07/2011 - 01/2012) [PDF, 154 KB]

Dsseldorf, Hafenspitze Dsseldorf (Construction Period: 03/2008 - 11/2008) [PDF, 728 KB]

Frankfurt/Main, MAB FrankfurtHochVier, batch 1 (Construction Period: 07/2004 - 04/2008) [PDF, 107 KB]

Hamburg, Airport City-Rail Motorway Section 5-8 (Construction Period: 10/2005 - 01/2006) [PDF, 704 KB]

Hamburg, Development Ericusspitze (Construction Period: 06/2008 - 11/2008) [PDF, 527 KB]

Ho-Chi-Minh-City/Vietnam, Phu My Bridge (Construction Period: 08/2007 - 04/2008) [PDF, 706 KB]

Kitzingen, Northern Bypass Kitzingen, Section 1 (Construction Period: 08/2009 - 07/2010) [PDF, 1.0 MB]

Lagos/Nigeria, Foundation Rose of Sharon (Construction Period: 06/2011 - 09/2012) [PDF, 0.9 MB]

Ludwigshafen, Rheingalerie (Construction Period: 06/2008 - 09/2008) [PDF, 570 KB]

Mannheim, Large power station Mannheim Block 9 (Construction Period: 06/2009 - 12/2012) [PDF, 3.3 MB]
http://www.spezialtiefbau.bilfinger.com/en/services/deep-foundations/bored-piles/ 2/4

4/22/2014

Bored Piles - Bilfinger Spezialtiefbau GmbH

Marmet/West Virginia/USA, Marmet Locks and Dam Replacement (Construction Period: 03/2004 - 05/2004) [PDF, 65 KB]

Munich, Foundation Piles Sparda Bank (Construction Period: 05/2009 - 08/2009) [PDF, 854 KB]

Munich, New Building HFF SMAEK (Construction Period: 05/2007 - 11/2007) [PDF, 603 KB]

Niederfinow, Ship Canal Lift Niederfinow-Bored Piles (Construction Period: 06/2010 - 11/2010) [PDF, 182 KB]

Offenbach/Main, Excavation Pit Department Store KOMM (Construction Period: 01/2008 - 07/2008) [PDF, 0.9 MB]

Panama, Puente Centenario (Construction Period: 04/2002 - 09/2002) [PDF, 197 KB]

Rdental near Coburg, Tunnel Reitersberg (Construction Period: 04/2009 - 07/2009) [PDF, 1.1 MB]

Sarpsborg/Norway, Ny Sandesund Bridge (Construction Period: 07/2006 - 09/2006) [PDF, 597 KB]

Taichung/Taiwan, Taiwan High Speed Rail Bored Piles (Construction Period: 04/2000 - 06/2004) [PDF, 262 KB]

Toledo/USA, Maumee River Bridge (Construction Period: 04/2002 - 09/2003) [PDF, 359 KB]

Vancouver/Canada, Golden Ears Bridge Mono-Piles (Construction Period: 09/2006 - 12/2007) [PDF, 759 KB]

Vancouver/Canada, Golden Ears Bridge River Piles (Construction Period: 09/2006 - 04/2007) [PDF, 334 KB]

Vinh Long/Vietnam, My Thuan Bridge (Construction Period: 11/1997 - 08/1998) [PDF, 295 KB]

http://www.spezialtiefbau.bilfinger.com/en/services/deep-foundations/bored-piles/

3/4

4/22/2014

Bored Piles - Bilfinger Spezialtiefbau GmbH

http://www.spezialtiefbau.bilfinger.com/en/services/deep-foundations/bored-piles/

4/4

Вам также может понравиться