SNRDP-CP2 Qingjian Group Co., Ltd.

Baseline Schedule
ID

Task Name
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94

Est. Duration Est. Start - Base Est. Finish 1


Base 1

1 CONTRACT PACKAGE CP2 CONSTRUCTION SCHEDULE


1005 days
1.1 PROJECT MILESTONE
1005 days
1.1.1 COMMENCEMENT DATE
0 days
1.1.2 COMPLETION DATE
0 days
1.1.3 COMPLETE CONSTRUCTION OF FACILITIES
0 days
1.1.4 COMPLETE EARTHWORKS
0 days
1.1.5 COMPLETE SUBBASE AND BASE COURSE
0 days
1.1.6 COMPLETE SURFACE COURSE
0 days
1.1.7 COMPLETE BRIDGE CONSTRUCTION
0 days
1.1.8 COMPLETE DRAINAGE AND SLOPE PROTECTION STRUCTURES
0 days
1.1.9 MISCELLANEOUS STRUCTURES
0 days
1.1.10 COMPLETE RELOCATION OF ELECTRICAL DISTRIBUTION SYSTEM
0 days
1.2 PRELIMINARY WORK/PREPARE/SUBMIT/APPROVE/ SHOP DRAWINGS/DESIGN MIX305 days
1.2.1 As Stake Survey
153 days
1.2.2 Survey for Drainage and Slope Protection Structures
47 days
1.2.3 Survey for Water Utilities
52 days
1.2.4 Survey for Electrical Utilities
36 days
1.2.5 Topographic Survey for Bridges
34 days
1.2.6 Prepare and Submit Shop Drawing of Road Cross Section and Profile
267 days
1.2.7 Review by Engineer of Shop Dwg of Road Cross Section and Profile
228 days
1.2.8 Prepare response & resubmit Shop Dwg of Road Cross Section and Profile
164 days
1.2.9 Approve Shop Drawing Roads
66 days
1.2.10 Prepare and Submit Shop Drawing for Drainage and Slope Protection Structures212 days
1.2.11 Review by Engineer of Shop Dwg of Drainage and Slope Protection Structures 206 days
1.2.12 Prepare response & resubmit Shop Dwg of Drainage and Slope Protection Structures
178 days
1.2.13 Approve Shop Drawing Drainage/Slope Protection
155 days
1.2.14 Prepare and Submit Shop Drawing for Water Utilities
30 days
1.2.15 Review by Engineer of Shop Dwg for Water Utilities
24 days
1.2.16 Prepare response & resubmit Shop Dwg of Water Utilities
17 days
1.2.17 Approve Shop Drawing Water Utilities
10 days
1.2.18 Prepare and Submit Shop Drawing for Electrical Utilities
50 days
1.2.19 Review by Engineer of Shop Dwg for Electrical Utilities
45 days
1.2.20 Prepare response & resubmit Shop Dwg of Electrical Utilities
38 days
1.2.21 Approve Shop Drawings Electrical Utilities
30 days
1.2.22 Prepare and Submit Shop Drawing for Bridges
66 days
1.2.23 Review by Engineer of Shop Dwg for Bridges
59 days
1.2.24 Prepare response & resubmit Shop Dwg of Bridges
57 days
1.2.25 Approve Shop Drawings Bridges
45 days
1.2.26 Submit Concrete Mix Design
30 days
1.2.27 Review by Engineer of Concrete Mix Design
14 days
1.2.28 Prepare response & resubmit Concrete Mix Design
7 days
1.2.29 Approve Concrete Mix Design
1 day
1.2.30 Prepare and Submit Shop Drawing for Engineers Quarters, Laboratory and Field15Office
days
1.2.31 Review by Engineer of Shop Dwg for Engineers Quarters, Laboratory and Field Office
14 days
1.2.32 Prepare response and resubmit Shop Dwg for Engineers Quarters, Laboratory 7 days
and Field Office
1.2.33 Approve Shop Drawings Engineers Quarters, Laboratory and Field Office
1 day
1.2.34 Submit Soil Quality Test/Stabilization Mix Design
67 days
1.2.35 Review by Engineer of Soil Quality Test/Stabilization Mix Design
14 days
1.2.36 Prepare response & resubmit Soil Quality Test/Stabilization Mix Design
7 days
1.2.37 Approve Soil Quality Test/Stabilization Mix Design
1 day
1.2.38 Prepare and Submit Shop Drawing for Miscellaneous Structures
230 days
1.2.39 Review by Engineer of Shop Dwg for miscellaneous Structures
14 days
1.2.40 Prepare response & resubmit Shop Dwg for Miscellaneous Structures
7 days
1.2.41 Approve Shop Drawing Miscellaneous Structures
0 days
1.3 FACILITIES FOR THE ENGINEERS
1005 days
1.3.1 Provide Temp. Field off, Laboratory and Living Quarters for the Engineer (Rental)92 days
1.3.2 Construction of combined Field Office & Laboratory Building and Quarter
56 days
Building for the Engineer
1.3.3 Operate/maintain field Office, Laboratory & quarters for the Engineer
871 days
1.3.4 Provide Equipment, Furnitures, Fixtures and Appliances for Field office,
46 days
Laboratory and Quarters for the Engineer
1.3.5 Provide Laboratory Testing Equipment and Apparatus for the Engineer on
30 days
Rental Basis
1.3.6 Provide , Operate and Maintain Communication Equipment/Office
1005 days
Supplies/Consummables for the Engineer
1.3.7 Provide Service Vehicle to the Engineer
46 days
1.3.8 Provide and Maintain 4w D Pickup Service Vehicle for the Engineer
1005 days
1.3.9 Provide and maintain Survey Instrument/Equipment for Assist. to the Engineer 1005 days
1.3.10 Provision of Survey Personnel
1005 days
1.3.11 Progress Photographs
1005 days
1.3.12 End of Facilities to the Engineers
0 days
1.4 OTHER GENERAL REQUIREMENTS
1005 days
1.4.1 Construction Program
1005 days
1.4.1.1 Prepare and Submit Construction Program
31 days
1.4.1.2 Review by Engineer of Construction Program
14 days
1.4.1.3 Prepare response & resubmit Const. Program
7 days
1.4.1.4 Update/Report on Construction Program
953 days
1.4.2 Quality Assurance Management System Manual
1005 days
1.4.2.1 Prepare and Submit Quality Assurance Management System Manual
30 days
1.4.2.2 Review by Engineer of QAMSM
14 days
1.4.2.3 Prepare response & resubmit QAMSM
7 days
1.4.2.4 Update/Report on QAMSM
953 days
1.4.3 Environmental and Social Safeguards
1005 days
1.4.3.1 Prepare and Submit Environmental and Social Management Plan (ESMP) 30 days
1.4.3.2 Review by Engineer of ESMP
14 days
1.4.3.3 Prepare response & resubmit ESMP
7 days
1.4.3.4 Update/Report on ESMP
953 days
1.4.4 Traffic Control
1005 days
1.4.4.1 Prepare and Submit Traffic Management Plan (TMP)
30 days
1.4.4.2 Review by Engineer of TMP
14 days
1.4.4.3 Prepare response & resubmit TMP
7 days
1.4.4.4 Update/Implement TMP
953 days
1.4.5 Project Implementation
1005 days
1.4.5.1 Prepare and Submit Project Implementation Plan (PMP)
30 days
1.4.5.2 Review by Engineer of PMP
14 days
1.4.5.3 Prepare response & resubmit PMP
7 days
1.4.5.4 Update/implement PMP
953 days
1.4.6 Construction Health and Safety incl. Materials and First Aid Facilities
1005 days

Baseline Start

Baseline Finish

Status
Apr

Mon 7/1/13
Mon 7/1/13
Mon 7/1/13
Thu 3/31/16
Thu 3/31/16
Thu 3/31/16
Thu 3/31/16
Thu 3/31/16
Wed 9/30/15
Thu 3/31/16
Thu 3/31/16
Thu 3/31/16
Mon 7/1/13
Mon 7/1/13
Mon 12/16/13
Mon 3/10/14
Mon 3/17/14
Wed 1/15/14
Wed 8/7/13
Sun 9/15/13
Mon 11/18/13
Mon 2/24/14
Tue 10/1/13
Mon 10/7/13
Mon 11/4/13
Wed 11/27/13
Tue 4/1/14
Mon 4/7/14
Mon 4/14/14
Mon 4/21/14
Wed 3/12/14
Mon 3/17/14
Mon 3/24/14
Tue 4/1/14
Mon 2/24/14
Mon 3/3/14
Wed 3/5/14
Mon 3/17/14
Fri 11/1/13
Sun 12/1/13
Sun 12/15/13
Sun 12/22/13
Mon 7/1/13
Tue 7/16/13
Tue 7/30/13

Thu 3/31/16
Thu 3/31/16
Mon 7/1/13
Thu 3/31/16
Thu 3/31/16
Thu 3/31/16
Thu 3/31/16
Thu 3/31/16
Wed 9/30/15
Thu 3/31/16
Thu 3/31/16
Thu 3/31/16
Thu 5/1/14
Sat 11/30/13
Fri 1/31/14
Wed 4/30/14
Mon 4/21/14
Mon 2/17/14
Wed 4/30/14
Wed 4/30/14
Wed 4/30/14
Wed 4/30/14
Wed 4/30/14
Wed 4/30/14
Wed 4/30/14
Wed 4/30/14
Wed 4/30/14
Wed 4/30/14
Wed 4/30/14
Wed 4/30/14
Wed 4/30/14
Wed 4/30/14
Wed 4/30/14
Wed 4/30/14
Wed 4/30/14
Wed 4/30/14
Wed 4/30/14
Wed 4/30/14
Sat 11/30/13
Sat 12/14/13
Sat 12/21/13
Sun 12/22/13
Mon 7/15/13
Mon 7/29/13
Mon 8/5/13

Mon 7/1/13
Mon 7/1/13
Mon 7/1/13
Thu 3/31/16
Thu 3/31/16
Thu 3/31/16
Thu 3/31/16
Sun 1/31/16
Wed 9/30/15
Sat 10/24/15
Thu 3/31/16
Sat 1/30/16
Mon 7/1/13
Mon 7/1/13
Thu 8/15/13
Thu 8/15/13
Thu 8/15/13
Thu 8/15/13
Mon 7/8/13
Fri 10/11/13
Fri 10/25/13
Thu 10/31/13
Thu 8/22/13
Fri 10/11/13
Fri 10/25/13
Fri 11/1/13
Thu 8/22/13
Fri 10/11/13
Fri 10/25/13
Thu 10/31/13
Thu 8/22/13
Fri 10/11/13
Fri 10/25/13
Thu 10/31/13
Thu 8/22/13
Fri 10/11/13
Fri 10/25/13
Fri 11/8/13
Fri 11/1/13
Sun 12/1/13
Sun 12/15/13
Sun 12/22/13
Mon 7/1/13
Tue 7/16/13
Tue 7/30/13

Thu 3/31/16 On Schedule


Thu 3/31/16 Late
Mon 7/1/13 Complete
Thu 3/31/16 Future Task
Thu 3/31/16 Future Task
Thu 3/31/16 Future Task
Thu 3/31/16 Future Task
Sun 1/31/16 Future Task
Wed 9/30/15 Future Task
Sat 10/24/15 Future Task
Thu 3/31/16 Future Task
Sat 1/30/16 Future Task
Thu 5/1/14 On Schedule
Sat 8/31/13 Complete
Mon 9/30/13 Complete
Mon 9/30/13 Future Task
Mon 9/30/13 Future Task
Mon 9/30/13 On Schedule
Thu 10/10/13 On Schedule
Thu 10/24/13 On Schedule
Thu 10/31/13 On Schedule
Thu 10/31/13 Future Task
Thu 10/10/13 On Schedule
Thu 10/24/13 On Schedule
Thu 10/31/13 On Schedule
Fri 11/1/13 On Schedule
Thu 10/10/13 Future Task
Thu 10/24/13 Future Task
Thu 10/31/13 Future Task
Thu 10/31/13 Future Task
Thu 10/10/13 Future Task
Thu 10/24/13 Future Task
Thu 10/31/13 Future Task
Thu 10/31/13 Future Task
Thu 10/10/13 Future Task
Thu 10/24/13 Future Task
Thu 10/31/13 Future Task
Fri 11/8/13 Future Task
Sat 11/30/13 Complete
Sat 12/14/13 Complete
Sat 12/21/13 Complete
Sun 12/22/13 Complete
Mon 7/15/13 Complete
Mon 7/29/13 Complete
Mon 8/5/13 Complete

Mon 8/5/13
Thu 8/1/13
Mon 10/7/13
Mon 10/21/13
Sun 10/27/13
Thu 8/22/13
Wed 4/9/14
Thu 4/24/14
Thu 5/1/14
Mon 7/1/13
Mon 7/1/13
Tue 8/6/13

Mon 8/5/13
Sun 10/6/13
Sun 10/20/13
Sun 10/27/13
Sun 10/27/13
Tue 4/8/14
Tue 4/22/14
Wed 4/30/14
Thu 5/1/14
Thu 3/31/16
Mon 9/30/13
Mon 9/30/13

Mon 8/5/13
Thu 8/1/13
Mon 10/7/13
Mon 10/21/13
Sun 10/27/13
Thu 8/22/13
Wed 4/9/14
Thu 4/24/14
Thu 5/1/14
Mon 7/1/13
Mon 7/1/13
Tue 8/6/13

Mon 8/5/13 Complete


Sun 10/6/13 Complete
Sun 10/20/13 Complete
Sun 10/27/13 Complete
Sun 10/27/13 Complete
Tue 4/8/14 On Schedule
Tue 4/22/14 Future Task
Wed 4/30/14 Future Task
Thu 5/1/14 Future Task
Thu 3/31/16 Late
Mon 9/30/13 Complete
Mon 9/30/13 Complete

Mon 7/1/13 Tue 12/29/15


Mon 7/1/13 Thu 8/15/13

Tue 10/1/13
Mon 7/1/13

Wed 3/30/16 On Schedule


Thu 8/15/13 Complete

Mon 7/1/13 Tue 7/30/13

Mon 7/1/13

Tue 7/30/13 Complete

Mon 7/1/13 Thu 3/31/16

Mon 7/1/13

Thu 3/31/16 On Schedule

Mon 7/1/13
Mon 7/1/13
Mon 7/1/13
Mon 7/1/13
Mon 7/1/13
Thu 3/31/16
Mon 7/1/13
Mon 7/1/13
Mon 7/1/13
Thu 8/1/13
Thu 8/15/13
Thu 8/22/13
Mon 7/1/13
Mon 7/1/13
Thu 8/1/13
Thu 8/15/13
Thu 8/22/13
Mon 7/1/13
Mon 7/1/13
Thu 8/1/13
Thu 8/15/13
Thu 8/22/13
Mon 7/1/13
Mon 7/1/13
Thu 8/1/13
Thu 8/15/13
Thu 8/22/13
Mon 7/1/13
Mon 7/1/13
Thu 8/1/13
Thu 8/15/13
Thu 8/22/13
Mon 7/1/13

Mon 7/1/13
Mon 7/1/13
Mon 7/1/13
Mon 7/1/13
Mon 7/1/13
Thu 3/31/16
Mon 7/1/13
Mon 7/1/13
Mon 7/1/13
Thu 8/1/13
Thu 8/15/13
Thu 8/22/13
Mon 7/1/13
Mon 7/1/13
Thu 8/1/13
Thu 8/15/13
Thu 8/22/13
Mon 7/1/13
Mon 7/1/13
Thu 8/1/13
Thu 8/15/13
Thu 8/22/13
Mon 7/1/13
Mon 7/1/13
Thu 8/1/13
Thu 8/15/13
Thu 8/22/13
Mon 7/1/13
Mon 7/1/13
Thu 8/1/13
Thu 8/15/13
Thu 8/22/13
Mon 7/1/13

Thu 8/15/13 Complete


Thu 3/31/16 On Schedule
Thu 3/31/16 On Schedule
Thu 3/31/16 On Schedule
Thu 3/31/16 On Schedule
Thu 3/31/16 Future Task
Thu 3/31/16 On Schedule
Thu 3/31/16 On Schedule
Wed 7/31/13 Complete
Wed 8/14/13 Complete
Wed 8/21/13 Complete
Thu 3/31/16 On Schedule
Thu 3/31/16 On Schedule
Tue 7/30/13 Complete
Wed 8/14/13 Complete
Wed 8/21/13 Complete
Thu 3/31/16 On Schedule
Thu 3/31/16 On Schedule
Tue 7/30/13 Complete
Wed 8/14/13 Complete
Wed 8/21/13 Complete
Thu 3/31/16 On Schedule
Thu 3/31/16 On Schedule
Tue 7/30/13 Complete
Wed 8/14/13 Complete
Wed 8/21/13 Complete
Thu 3/31/16 On Schedule
Thu 3/31/16 On Schedule
Tue 7/30/13 Complete
Wed 8/14/13 Complete
Wed 8/21/13 Complete
Thu 3/31/16 On Schedule
Thu 3/31/16 On Schedule

Thu 8/15/13
Thu 3/31/16
Thu 3/31/16
Thu 3/31/16
Thu 3/31/16
Thu 3/31/16
Thu 3/31/16
Thu 3/31/16
Wed 7/31/13
Wed 8/14/13
Wed 8/21/13
Thu 3/31/16
Thu 3/31/16
Tue 7/30/13
Wed 8/14/13
Wed 8/21/13
Thu 3/31/16
Thu 3/31/16
Tue 7/30/13
Wed 8/14/13
Wed 8/21/13
Thu 3/31/16
Thu 3/31/16
Tue 7/30/13
Wed 8/14/13
Wed 8/21/13
Thu 3/31/16
Thu 3/31/16
Tue 7/30/13
Wed 8/14/13
Wed 8/21/13
Thu 3/31/16
Thu 3/31/16

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

2014
Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

2015
Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

2016
Jan

Feb

Mar

Apr

7/1
3/31
3/31
3/31
3/31
3/31
9/30
3/31
3/31
3/31
50%
100%
100%
0%
0%
50%
67%
61%
46%
0%
58%
57%
50%
43%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
71%
0%
0%
5/1
100%
100%
20%
100%
100%
21%
100%
21%
21%
21%
21%
3/31

100%
100%
100%
17%
21%
100%
100%
100%
17%
21%
100%
100%
100%
17%
21%
100%
100%
100%
17%
21%
100%
100%
100%
17%
21%

Critical

Task

Manual Task

Duration-only

Baseline Milestone

Summary

External Tasks

Inactive Milestone

Critical Split

Split

Start-only

Baseline

Milestone

Manual Summary

External Milestone

Inactive Summary

Critical Progress

Task Progress

Finish-only

Baseline Split

Summary Progress

Project Summary

Inactive Task

Deadline

Baseline 1

May

SNRDP-CP2 Qingjian Group Co., Ltd. Baseline Schedule


ID
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192

Task Name

Est. Duration Est. Start - Base Est. Finish 1


Base 1

1.4.6.1 Prepare and Submit Health and Safety Plan (HSP)


1.4.6.2 Review by Engineer of HSP
1.4.6.3 Prepare response & resubmit HSP
1.4.6.4 Update/Report/ Implement HSP
1.4.7 Project Billboard/Signs
1.4.7.1 Prepare and Submit Shop Drawing of Billboard/Signs
1.4.7.2 Review by Engineer of Shop Drawing
1.4.7.3 Prepare response & resubmit Shop Drawing
1.4.7.4 Install Billboard/Signs
1.4.8 Complete Other General Requirements
1.5 EARTHWORKS
1.5.1 SECTION 3: STA 888+500 - STA 873+500 (15.00km)
1.5.1.1 Clearing and Grubbing/Removal of Trees
1.5.1.2 Excavation(Incl. pipe culvert/drain excav.)/Embankment
1.5.1.3 Removal of structures and obstructions
1.5.1.4 Removal of AC/PCCP/RCPC/RCBC
1.5.1.5 Subgrade Preparation
1.5.1.6 Complete Earthworks Sta 888+500- Sta 873+500
1.5.2 SECTION 2: STA 873+500 - STA 858+500 (15.000km)
1.5.2.1 Clearing and Grubbing/Removal of Trees
1.5.2.2 Excavation(Incl. pipe culvert/drain excav.)/Embankment
1.5.2.3 Removal of structures and obstructions
1.5.2.4 Removal of AC/PCCP/RCPC/RCBC
1.5.2.5 Subgrade Preparation
1.5.2.6 Complete Earthworks Sta 873+500- Sta 858+500
1.5.3 SECTION 1: STA 858+500 - STA 843+500 (15.000km)
1.5.3.1 Clearing and Grubbing/Removal of Trees
1.5.3.2 Excavation(Incl. pipe culvert/drain excav.)/Embankment
1.5.3.3 Removal of structures and obstructions
1.5.3.4 Removal of AC/PCCP/RCPC/RCBC
1.5.3.5 Subgrade Preparation
1.5.3.6 Complete Earthworks Sta 858+500- Sta 843+500
1.5.4 SECTION 4: STA 888+500 - STA 907+281.82 (18.78km)
1.5.4.1 Clearing and Grubbing/Removal of Trees
1.5.4.2 Excavation(Incl. pipe culvert/drain excav.)/Embankment
1.5.4.3 Removal of structures and obstructions
1.5.4.4 Removal of AC/PCCP/RCPC/RCBC
1.5.4.5 Subgrade Preparation
1.5.4.6 Complete Earthworks Sta 888+500- Sta 907+281.82
1.6 SUBBASE/BASE COURSE/SURFACE COURSE
1.6.1 SECTION 3: STA 888+500 - STA 873+500 (15.00km)
1.6.1.1 subbase and base course
1.6.1.2 Placing of PCC Pavement
1.6.1.3 Materials Test
1.6.1.4 Complete Surface Course Sta 888+500 -Sta 873+500
1.6.2 SECTION 2: STA 873+500 - STA 858+500 (15.000km)
1.6.2.1 subbase and base course
1.6.2.2 Placing of PCC Pavement
1.6.2.3 Materials Test
1.6.2.4 Complete Surface Course Sta 873+500 -Sta 858+500
1.6.3 SECTION 1: STA 858+500 - STA 843+500 (15.000km)
1.6.3.1 subbase and base course
1.6.3.2 Placing of PCC Pavement
1.6.3.3 Materials Test
1.6.3.4 Complete Surface Course Sta 858+500 -Sta 843+500
1.6.4 SECTION 4: STA 888+500 - STA 907+281.82 (18.78km)
1.6.4.1 subbase and base course
1.6.4.2 Placing of PCC Pavement
1.6.4.3 Materials Test
1.6.4.4 Complete Surface Course Sta 888+500 -Sta 907+281.82
1.7 BRIDGE CONSTRUCTION
1.7.1 Rehabilitation of Existing Bridges
1.7.1.1 BALOTO Bridge
1.7.1.1.1 Seismic Retrofit
1.7.1.1.1.1 Slab Strengthening
1.7.1.1.1.2 Column Strengthening
1.7.1.1.1.3 Approach Slab
1.7.1.1.2 Non-Seismic Retrofit
1.7.1.1.2.1 Repair of Cracks/Concrete/Abutment Slope Protection
1.7.1.2 CAGBOBORAC Bridge
1.7.1.2.1 Seismic Retrofit
1.7.1.2.1.1 Slab Strengthening
1.7.1.2.1.2 Column Strengthening
1.7.1.2.1.3 Approach Slab
1.7.1.2.2 Non-Seismic Retrofit
1.7.1.2.2.1 Repair of Cracks/Concrete/Abutment Slope Protection
1.7.1.3 MANTANG Bridge
1.7.1.3.1 Seismic Retrofit
1.7.1.3.1.1 Slab Strengthening
1.7.1.3.1.2 Column Strengthening
1.7.1.3.1.3 Approach Slab
1.7.1.3.2 Non-Seismic Retrofit
1.7.1.3.2.1 Repair of Cracks/Concrete/Abutment Slope/Pier Protection
1.7.1.4 POLANGI Bridge
1.7.1.4.1 Seismic Retrofit
1.7.1.4.1.1 Concrete Shear Keys at Abutment
1.7.1.4.1.2 Girder Strengthening
1.7.1.4.1.3 Approach Slab
1.7.1.4.2 Non-Seismic Retrofit
1.7.1.4.2.1 Repair of Cracks/Concrete/Expansion Joint/Painting
1.7.1.4.2.2 Abutment Slope Protection
1.7.1.4.2.3 Provision of Asphalt Overlay
1.7.1.4.2.4 Replacement of Approach Sidewalk and Railing
1.7.1.5 NABUANGAN BRIDGE
1.7.1.5.1 Seismic Retrofit
1.7.1.5.1.1 Concrete Shear Keys at Abutment/Pier
1.7.1.5.1.2 Girder Strengthening
1.7.1.5.1.3 Approach Slab

30 days
14 days
7 days
953 days
31 days
15 days
14 days
3 days
3 days
0 days
730 days
396 days
151 days
275 days
149 days
181 days
246 days
0 days
372 days
121 days
74 days
116 days
162 days
246 days
0 days
381 days
161 days
164 days
145 days
181 days
246 days
0 days
452 days
105 days
346 days
186 days
226 days
334 days
0 days
761 days
259 days
240 days
13 days
198 days
0 days
393 days
240 days
246 days
245 days
0 days
355 days
240 days
245 days
245 days
0 days
428 days
251 days
278 days
275 days
0 days
669 days
564 days?
62 days
62 days
15 days
50 days
12 days
30 days
30 days
108 days
80 days
23 days
29 days
30 days
30 days
30 days
140 days
140 days
31 days
30 days
24 days
61 days
61 days
168 days
77 days
23 days
23 days
28 days
84 days
33 days
31 days
4 days
20 days
306 days
165 days
60 days
44 days
30 days

Mon 7/1/13 Tue 7/30/13


Thu 8/1/13 Wed 8/14/13
Thu 8/15/13 Wed 8/21/13
Thu 8/22/13 Thu 3/31/16
Mon 7/1/13 Wed 7/31/13
Mon 7/1/13 Mon 7/15/13
Mon 7/15/13 Sun 7/28/13
Mon 7/29/13 Wed 7/31/13
Mon 7/29/13 Wed 7/31/13
Thu 3/31/16 Thu 3/31/16
Tue 10/1/13 Wed 9/30/15
Tue 10/1/13 Fri 10/31/14
Sun 10/6/13 Thu 3/20/14
Sat 11/2/13 Wed 10/1/14
Sun 2/16/14 Tue 9/30/14
Tue 1/7/14 Fri 7/25/14
Tue 12/17/13 Tue 8/19/14
Wed 9/30/15 Wed 9/30/15
Mon 11/25/13 Tue 12/2/14
Mon 11/25/13 Tue 3/25/14
Sun 3/2/14 Wed 5/14/14
Fri 2/21/14 Mon 6/16/14
Fri 2/21/14
Fri 8/1/14
Mon 3/31/14 Mon 12/1/14
Tue 12/2/14 Tue 12/2/14
Mon 2/17/14 Thu 3/5/15
Mon 2/17/14 Sun 7/27/14
Mon 2/24/14 Wed 8/6/14
Fri 2/21/14 Fri 7/18/14
Mon 4/14/14 Sat 10/11/14
Wed 7/2/14 Wed 3/4/15
Thu 3/5/15 Thu 3/5/15
Mon 4/21/14 Thu 7/16/15
Mon 4/21/14 Tue 9/9/14
Sun 6/8/14 Tue 5/19/15
Sun 6/15/14Wed 12/17/14
Sun 6/22/14 Mon 2/2/15
Sun 8/17/14 Thu 7/16/15
Thu 7/16/15 Thu 7/16/15
Wed 1/1/14 Sun 1/31/16
Wed 1/1/14 Tue 9/16/14
Mon 2/24/14 Fri 8/29/14
Fri 2/21/14 Wed 3/5/14
Fri 2/21/14
Sat 9/6/14
Sat 9/6/14
Sat 9/6/14
Sun 4/6/14 Sun 5/3/15
Sun 4/6/14 Mon 12/1/14
Sun 5/4/14 Sun 1/4/15
Sun 5/11/14 Sat 1/10/15
Sun 5/3/15 Sun 5/3/15
Sun 7/6/14 Thu 6/25/15
Sun 7/6/14 Mon 3/2/15
Sun 8/3/14
Sat 4/4/15
Sun 8/3/14
Sat 4/4/15
Thu 6/25/15 Thu 6/25/15
Sun 11/30/14 Sun 1/31/16
Sun 11/30/14
Fri 8/7/15
Sun 1/25/15 Thu 10/29/15
Sun 1/25/15Mon 10/26/15
Sun 1/31/16 Sun 1/31/16
Sun 12/1/13 Wed 9/30/15
Sun 3/16/14 Wed 9/30/15
Tue 4/29/14 Sun 6/29/14
Tue 4/29/14 Sun 6/29/14
Sun 5/11/14 Sun 5/25/14
Tue 4/29/14 Tue 6/17/14
Wed 6/18/14 Sun 6/29/14
Sun 5/11/14 Mon 6/9/14
Sun 5/11/14 Mon 6/9/14
Sat 4/19/14 Mon 8/4/14
Sat 4/19/14 Mon 7/7/14
Sat 4/19/14 Sun 5/11/14
Sun 5/11/14 Sun 6/8/14
Sun 6/8/14 Mon 7/7/14
Sun 7/6/14 Mon 8/4/14
Sun 7/6/14 Mon 8/4/14
Sat 3/29/14 Fri 8/15/14
Sat 3/29/14 Fri 8/15/14
Sun 4/20/14 Tue 5/20/14
Sat 3/29/14 Sun 4/27/14
Wed 7/23/14 Fri 8/15/14
Sun 5/25/14 Thu 7/24/14
Sun 5/25/14 Thu 7/24/14
Tue 6/24/14 Sun 10/19/14
Tue 6/24/14 Fri 9/12/14
Tue 6/24/14 Wed 7/16/14
Thu 7/24/14 Fri 8/15/14
Sat 8/16/14 Fri 9/12/14
Fri 7/25/14 Sun 10/19/14
Fri 7/25/14 Tue 8/26/14
Sat 9/13/14Mon 10/13/14
Sat 8/30/14 Tue 9/2/14
Tue 9/30/14 Sun 10/19/14
Thu 5/1/14 Mon 3/2/15
Thu 5/1/14 Sun 10/12/14
Mon 6/2/14 Thu 7/31/14
Thu 5/1/14 Fri 6/13/14
Sat 9/13/14 Sun 10/12/14

Baseline Start

Baseline Finish

Status
Apr

Mon 7/1/13
Tue 7/30/13 Complete
Thu 8/1/13 Wed 8/14/13 Complete
Thu 8/15/13 Wed 8/21/13 Complete
Thu 8/22/13
Thu 3/31/16 On Schedule
Mon 7/1/13 Wed 7/31/13 Complete
Mon 7/1/13 Mon 7/15/13 Complete
Mon 7/15/13
Sun 7/28/13 Complete
Mon 7/29/13 Wed 7/31/13 Complete
Mon 7/29/13 Wed 7/31/13 Complete
Thu 3/31/16
Thu 3/31/16 Future Task
Thu 10/31/13
Thu 3/31/16 On Schedule
Tue 10/1/13
Fri 10/31/14 On Schedule
Tue 10/1/13
Fri 2/28/14 On Schedule
Mon 11/4/13 Mon 7/21/14 On Schedule
Wed 11/4/15
Tue 9/30/14 Future Task
Sat 10/3/15
Fri 7/25/14 On Schedule
Tue 12/17/13
Tue 8/19/14 On Schedule
Thu 3/31/16
Thu 3/31/16 Future Task
Sat 3/1/14
Tue 12/2/14 On Schedule
Sat 3/1/14
Sun 6/29/14 On Schedule
Tue 3/4/14 Tue 11/18/14 Future Task
Tue 3/4/14 Wed 7/30/14 Future Task
Sat 3/8/14
Thu 9/4/14 Future Task
Mon 3/31/14 Mon 12/1/14 Future Task
Tue 12/2/14
Tue 12/2/14 Future Task
Mon 6/2/14
Thu 3/5/15 Future Task
Mon 6/2/14
Tue 9/30/14 Future Task
Thu 6/5/14
Thu 2/19/15 Future Task
Thu 6/5/14
Fri 10/31/14 Future Task
Mon 6/9/14
Sat 12/6/14 Future Task
Wed 7/2/14
Wed 3/4/15 Future Task
Thu 3/5/15
Thu 3/5/15 Future Task
Wed 10/1/14
Thu 3/31/16 Future Task
Wed 10/1/14
Sat 2/28/15 Future Task
Sat 10/4/14 Mon 9/14/15 Future Task
Sat 10/4/14
Tue 4/7/15 Future Task
Wed 10/8/14
Thu 5/21/15 Future Task
Sun 5/3/15
Thu 3/31/16 Future Task
Thu 3/31/16
Thu 3/31/16 Future Task
Wed 1/1/14
Sun 1/31/16 On Schedule
Wed 1/1/14
Tue 9/16/14 On Schedule
Wed 1/1/14
Thu 8/28/14 On Schedule
Sun 1/5/14
Sat 9/6/14 Future Task
Sun 1/5/14
Sat 9/6/14 Future Task
Sat 9/6/14
Sat 9/6/14 Future Task
Sun 8/17/14
Sun 5/3/15 Future Task
Sun 8/17/14 Mon 4/13/15 Future Task
Sun 8/24/14
Sun 4/26/15 Future Task
Mon 8/25/14
Sun 4/26/15 Future Task
Sun 5/3/15
Sun 5/3/15 Future Task
Thu 10/16/14
Thu 6/25/15 Future Task
Thu 10/16/14
Fri 6/12/15 Future Task
Fri 10/24/14
Thu 6/25/15 Future Task
Fri 10/24/14
Thu 6/25/15 Future Task
Thu 6/25/15
Thu 6/25/15 Future Task
Fri 4/24/15
Sun 1/31/16 Future Task
Fri 4/24/15 Wed 12/30/15 Future Task
Tue 4/28/15
Sat 1/30/16 Future Task
Fri 5/1/15
Sat 1/30/16 Future Task
Sun 1/31/16
Sun 1/31/16 Future Task
Sun 12/1/13 Wed 9/30/15 On Schedule
Thu 1/2/14 Wed 9/30/15 Future Task
Thu 1/2/14
Sun 3/2/14 Future Task
Thu 1/2/14
Sun 3/2/14 Future Task
Sun 2/16/14
Sun 3/2/14 Future Task
Thu 1/2/14
Sat 2/15/14 Future Task
Sun 2/16/14
Sun 2/23/14 Future Task
Thu 1/30/14
Fri 2/21/14 Future Task
Thu 1/30/14
Fri 2/21/14 Future Task
Sun 2/16/14
Fri 5/9/14 Future Task
Sun 2/16/14 Wed 4/23/14 Future Task
Tue 3/18/14
Wed 4/9/14 Future Task
Sun 2/16/14 Mon 3/17/14 Future Task
Tue 3/25/14 Wed 4/23/14 Future Task
Thu 4/10/14
Fri 5/9/14 Future Task
Thu 4/10/14
Fri 5/9/14 Future Task
Thu 4/24/14
Thu 7/24/14 Future Task
Thu 4/24/14
Thu 7/24/14 Future Task
Thu 4/24/14
Sat 5/24/14 Future Task
Sun 5/25/14 Mon 6/23/14 Future Task
Tue 7/1/14
Thu 7/24/14 Future Task
Sun 5/25/14
Thu 7/24/14 Future Task
Sun 5/25/14
Thu 7/24/14 Future Task
Tue 6/24/14 Sun 10/19/14 Future Task
Tue 6/24/14
Fri 9/12/14 Future Task
Tue 6/24/14 Wed 7/16/14 Future Task
Thu 7/24/14
Fri 8/15/14 Future Task
Sat 8/16/14
Fri 9/12/14 Future Task
Fri 7/25/14 Sun 10/19/14 Future Task
Fri 7/25/14
Tue 8/26/14 Future Task
Sat 9/13/14 Mon 10/13/14 Future Task
Sat 8/30/14
Tue 9/2/14 Future Task
Tue 9/30/14 Sun 10/19/14 Future Task
Thu 5/1/14 Sat 11/15/14 Future Task
Thu 5/1/14 Sat 11/15/14 Future Task
Sat 9/13/14 Tue 11/11/14 Future Task
Fri 10/3/14
Sat 11/15/14 Future Task
Sat 9/13/14 Sun 10/12/14 Future Task

May

Jun

Jul

Aug
Sep
100%
100%
100%

Oct

Nov

Dec

2014
Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

2015
Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

2016
Jan

Feb

Mar

Apr

17%
100%
100%
100%
100%
100%
3/31
7%
78%
12%
0%
10%
19%
9/30
9%
56%
0%
0%
0%
0%
12/2
0%
0%
0%
0%
0%
0%
3/5
0%
0%
0%
0%
0%
0%
7/16
1%
13%
0%
0%
9/6
0%
0%
0%
0%
5/3
0%
0%
0%
0%
6/25
0%
0%
0%
0%
1/31
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

Critical

Task

Manual Task

Duration-only

Baseline Milestone

Summary

External Tasks

Inactive Milestone

Critical Split

Split

Start-only

Baseline

Milestone

Manual Summary

External Milestone

Inactive Summary

Critical Progress

Task Progress

Finish-only

Baseline Split

Summary Progress

Project Summary

Inactive Task

Deadline

Baseline 1

May

SNRDP-CP2 Qingjian Group Co., Ltd. Baseline Schedule


ID
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290

Task Name

Est. Duration Est. Start - Base Est. Finish 1


Base 1

1.7.1.5.1.4 Installation of New Bearing Pad


1.7.1.5.1.5 Footing Retrofit
1.7.1.5.2 Non-Seismic Retrofit
1.7.1.5.2.1 Repair of Cracks/Concrete
1.7.1.5.2.2 Abutment Slope Protection
1.7.1.5.2.3 Provision of Asphalt Overlay
1.7.1.5.2.4 Backwall/Wingwall Reconstruction and Girder end Restoration
1.7.1.6 SULAT BRIDGE
1.7.1.6.1 Seismic Retrofit
1.7.1.6.1.1 Concrete Shear Keys at Abutment/Pier
1.7.1.6.1.2 Rod Restrainer/Column Strengthening
1.7.1.6.1.3 Approach Slab
1.7.1.6.1.4 Installation of New Bearing Pad
1.7.1.6.1.5 Footing Retrofit/Steel Shoe Bumper
1.7.1.6.2 Non-Seismic Retrofit
1.7.1.6.2.1 Repair of Cracks/Concrete
1.7.1.6.2.2 Abutment Slope Protection & Repair
1.7.1.6.2.3 Provision of Asphalt Overlay
1.7.1.6.2.4 Repair of Expansion Joint
1.7.1.7 TAFT BRIDGE
1.7.1.7.1 Seismic Retrofit
1.7.1.7.1.1 Concrete Shear Keys at Abutment/Pier
1.7.1.7.1.2 Rod Restrainer/Column Strengthening
1.7.1.7.1.3 Approach Slab
1.7.1.7.1.4 Installation of New Bearing Pad
1.7.1.7.1.5 Footing Retrofit/Steel Shoe Bumper
1.7.1.7.2 Non-Seismic Retrofit
1.7.1.7.2.1 Repair of Cracks/Concrete
1.7.1.7.2.2 Abutment Slope Protection and repair
1.7.1.7.2.3 Provision of Asphalt Overlay
1.7.1.7.2.4 Repair of expansion joint
1.7.1.8 DANAO Bridge
1.7.1.8.1 Seismic Retrofit
1.7.1.8.1.1 Approach Slab
1.7.1.8.2 Non-Seismic Retrofit
1.7.1.8.2.1 Repair of Cracks/Concrete
1.7.1.8.2.2 Abutment Slope Protection
1.7.1.9 LAPA Bridge
1.7.1.9.1 Seismic Retrofit
1.7.1.9.1.1 Concrete Shear Keys at Abutment
1.7.1.9.1.2 Approach Slab
1.7.1.9.2 Non-Seismic Retrofit
1.7.1.9.2.1 Abutment Slope Protection
1.7.1.9.2.2 Repair Expansion Joint
1.7.1.9.2.3 Replacement of Superstructure
1.7.1.9.2.4 Replacement ofApproach Sidewalk & Railing
1.7.1.10 ABANG Bridge
1.7.1.10.1 Seismic Retrofit
1.7.1.10.1.1 Concrete Shear Keys at Abutment
1.7.1.10.1.2 Approach Slab
1.7.1.10.2 Non-Seismic Retrofit
1.7.1.10.2.1 Abutment Slope Protection
1.7.1.10.2.2 Pier Scour Protection
1.7.1.10.2.3 Replacement of Superstructure
1.7.1.10.2.4 Replacement of Approach Sidewalk & Railing
1.7.1.11 MANDARINE Bridge
1.7.1.11.1 Seismic Retrofit
1.7.1.11.1.1 Concrete Shear Keys at Abutment
1.7.1.11.1.2 Girder Strengthening
1.7.1.11.1.3 Approach Slab
1.7.1.11.2 Non-Seismic Retrofit
1.7.1.11.2.1 Repair of Cracks/Concrete
1.7.1.11.2.2 Abutment Slope Protection
1.7.1.11.2.3 Pier Scour Protection/Painting
1.7.1.11.2.4 Provision of Asphalt Overlay
1.7.1.11.2.5 Repair of expansion joint
1.7.1.12 ACAS Bridge
1.7.1.12.1 Seismic Retrofit
1.7.1.12.1.1 Concrete Shear Keys at Abutment
1.7.1.12.1.2 Approach Slab
1.7.1.12.2 Non-Seismic Retrofit
1.7.1.12.2.1 Repair of Cracks
1.7.1.12.2.2 Abutment Slope Protection
1.7.1.12.2.3 Pier Scour Protection/Painting
1.7.1.12.2.4 Provision of Asphalt Overlay
1.7.1.12.2.5 Repair of expansion joint
1.7.1.13 LOOP DE LOOP BRIDGE
1.7.1.13.1 Seismic Retrofit
1.7.1.13.1.1 Concrete Shear Keys at Abutment
1.7.1.13.1.2 Approach Slab
1.7.1.13.2 Non-Seismic Retrofit
1.7.1.13.2.1 Repair of Concrete/Expansion Joint
1.7.1.13.2.2 Replacement of Superstructure
1.7.1.13.2.3 Replacement of Approach Sidewalk & Railing
1.7.1.14 CANJAGUIMET Bridge
1.7.1.14.1 Seismic Retrofit
1.7.1.14.1.1 Concrete Shear Keys at Abutment
1.7.1.14.1.2 Approach Slab
1.7.1.14.2 Non-Seismic Retrofit
1.7.1.14.2.1 Repair of Cracks/Concrete
1.7.1.14.2.2 Abutment Slope Protection
1.7.1.14.2.3 Pier Scour Protection/Painting
1.7.1.14.2.4 Provision of Asphalt Overlay
1.7.1.14.2.5 Repair of expansion joint
1.7.1.15 PISAK Bridge
1.7.1.15.1 Seismic Retrofit
1.7.1.15.1.1 Concrete Shear Keys at Abutment
1.7.1.15.1.2 Approach Slab

29 days
60 days
262 days
20 days
45 days
2 days
21 days
255 days?
210 days?
60 days
30 days
30 days?
45 days
60 days
105 days
30 days
45 days
2 days
2 days
254 days?
149 days
45 days
45 days
45 days
60 days
60 days
105 days?
30 days?
60 days
2 days
2 days
61 days
33 days
33 days
58 days
31 days
30 days
129 days
66 days
30 days
45 days
129 days
30 days
45 days
45 days
45 days
188 days
50 days
50 days
30 days
93 days
30 days
30 days
30 days
30 days
202 days
105 days
40 days
32 days
30 days
99 days
30 days
10 days
30 days
2 days
2 days
254 days
58 days
28 days
30 days
198 days
17 days
30 days
32 days
2 days
2 days
80 days
20 days
15 days
20 days
65 days
15 days
30 days
45 days
92 days
25 days
23 days
20 days
92 days
30 days
30 days
32 days
2 days
2 days
67 days?
32 days?
25 days?
30 days?

Thu 5/1/14 Thu 5/29/14


Mon 5/5/14 Fri 7/18/14
Sat 6/14/14 Mon 3/2/15
Fri 9/12/14 Wed 10/1/14
Sun 6/15/14 Tue 7/29/14
Sun 3/1/15 Mon 3/2/15
Sat 6/14/14
Fri 7/4/14
Mon 6/30/14 Wed 3/11/15
Mon 6/30/14 Sun 1/25/15
Thu 11/27/14 Sun 1/25/15
Fri 8/29/14 Sat 9/27/14
Mon 10/13/14 Tue 11/11/14
Mon 10/13/14Wed 11/26/14
Mon 6/30/14 Thu 8/28/14
Thu 11/27/14 Wed 3/11/15
Thu 11/27/14 Fri 12/26/14
Mon 1/26/15 Wed 3/11/15
Mon 1/26/15 Tue 1/27/15
Wed 1/28/15 Thu 1/29/15
Fri 8/29/14
Sat 5/9/15
Fri 8/29/14 Sat 1/24/15
Fri 10/17/14 Sun 11/30/14
Sat 9/27/14Mon 11/10/14
Tue 11/11/14 Thu 12/25/14
Wed 11/26/14 Sat 1/24/15
Fri 8/29/14Mon 10/27/14
Sun 1/25/15
Sat 5/9/15
Sun 1/25/15 Mon 2/23/15
Wed 3/11/15
Sat 5/9/15
Fri 4/10/15 Sat 4/11/15
Sun 4/12/15 Mon 4/13/15
Sun 3/23/14 Thu 5/22/14
Sun 4/20/14 Thu 5/22/14
Sun 4/20/14 Thu 5/22/14
Sun 3/23/14 Mon 5/19/14
Sun 3/23/14 Tue 4/22/14
Sun 4/20/14 Mon 5/19/14
Sun 5/11/14 Tue 9/16/14
Sun 6/1/14 Tue 8/5/14
Sun 6/1/14 Mon 6/30/14
Sun 6/22/14 Tue 8/5/14
Sun 5/11/14 Tue 9/16/14
Sun 5/11/14 Mon 6/9/14
Sun 8/3/14 Tue 9/16/14
Sun 6/15/14 Tue 7/29/14
Sun 6/22/14 Tue 8/5/14
Sun 3/30/14 Fri 10/3/14
Fri 8/15/14 Fri 10/3/14
Fri 8/15/14 Fri 10/3/14
Sat 8/30/14 Sun 9/28/14
Sun 3/30/14 Mon 6/30/14
Sun 4/27/14 Mon 5/26/14
Sun 3/30/14 Mon 4/28/14
Tue 4/29/14 Wed 5/28/14
Sun 6/1/14 Mon 6/30/14
Tue 7/15/14 Sun 2/1/15
Tue 7/15/14Mon 10/27/14
Tue 7/15/14 Sun 8/24/14
Sun 9/14/14Wed 10/15/14
Sun 9/28/14Mon 10/27/14
Sun 10/26/14 Sun 2/1/15
Sat 11/15/14 Sun 12/14/14
Fri 1/23/15 Sun 2/1/15
Wed 12/24/14 Thu 1/22/15
Sun 10/26/14Mon 10/27/14
Sun 10/26/14Mon 10/27/14
Sun 3/16/14Mon 11/24/14
Sun 3/16/14 Mon 5/12/14
Sun 3/16/14 Sat 4/12/14
Sun 4/13/14 Mon 5/12/14
Sun 5/11/14Mon 11/24/14
Sun 5/11/14 Tue 5/27/14
Sun 6/22/14 Mon 7/21/14
Sun 5/25/14 Wed 6/25/14
Sun 11/16/14Mon 11/17/14
Sun 11/23/14Mon 11/24/14
Sat 11/22/14 Mon 2/9/15
Sat 11/22/14 Thu 12/11/14
Sat 11/22/14 Sat 12/6/14
Sat 11/22/14 Thu 12/11/14
Sun 12/7/14 Mon 2/9/15
Sun 12/7/14 Sun 12/21/14
Sun 12/7/14 Mon 1/5/15
Sat 12/27/14 Mon 2/9/15
Sat 11/22/14 Sat 2/21/15
Sun 12/7/14Wed 12/31/14
Sun 12/7/14Mon 12/29/14
Fri 12/12/14Wed 12/31/14
Sat 11/22/14 Sat 2/21/15
Sat 11/22/14 Sun 12/21/14
Fri 1/23/15 Sat 2/21/15
Mon 12/22/14 Thu 1/22/15
Fri 1/23/15 Sat 1/24/15
Sun 1/25/15 Mon 1/26/15
Tue 12/30/14 Mon 3/23/15
Tue 12/30/14 Fri 1/30/15
Tue 12/30/14 Fri 1/23/15
Thu 1/1/15 Fri 1/30/15

Baseline Start

Baseline Finish

Status
Apr

Tue 7/15/14
Thu 5/1/14
Sat 6/14/14
Sat 9/13/14
Sat 6/14/14
Mon 10/13/14
Sat 6/14/14
Mon 6/30/14
Mon 6/30/14
Thu 11/27/14
Fri 8/29/14
Mon 10/13/14
Mon 10/13/14
Mon 6/30/14
Thu 11/27/14
Thu 11/27/14
Mon 1/26/15
Mon 1/26/15
Wed 1/28/15
Fri 8/29/14
Fri 8/29/14
Wed 2/25/15
Sun 9/28/14
Wed 11/12/14
Thu 11/27/14
Fri 8/29/14
Mon 1/26/15
Mon 1/26/15
Thu 3/12/15
Sat 4/11/15
Mon 4/13/15
Wed 8/27/14
Sat 9/13/14
Sat 9/13/14
Wed 8/27/14
Wed 8/27/14
Tue 10/14/14
Thu 7/17/14
Thu 7/17/14
Thu 7/17/14
Thu 7/17/14
Thu 7/17/14
Thu 11/13/14
Sun 8/31/14
Thu 7/17/14
Wed 8/6/14
Sat 8/16/14
Sat 8/16/14
Sat 8/16/14
Sun 8/31/14
Tue 9/30/14
Fri 12/19/14
Tue 9/30/14
Thu 10/30/14
Wed 11/19/14
Mon 9/15/14
Mon 9/15/14
Mon 9/15/14
Fri 10/3/14
Thu 10/16/14
Sat 9/27/14
Sat 9/27/14
Sun 1/18/15
Mon 11/17/14
Mon 11/17/14
Wed 11/19/14
Fri 10/10/14
Fri 10/10/14
Fri 10/10/14
Thu 10/16/14
Sat 10/25/14
Sat 10/25/14
Tue 1/20/15
Mon 11/17/14
Sat 11/22/14
Mon 11/24/14
Sat 11/22/14
Sat 11/22/14
Sat 11/22/14
Sat 11/22/14
Sun 12/7/14
Fri 12/12/14
Sun 12/7/14
Sat 12/27/14
Sun 12/7/14
Sun 12/7/14
Sun 12/7/14
Fri 12/12/14
Thu 1/1/15
Thu 1/1/15
Wed 3/4/15
Sat 1/31/15
Wed 3/4/15
Fri 3/6/15
Tue 12/30/14
Tue 12/30/14
Tue 12/30/14
Thu 1/1/15

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

2014
Jan

Fri 9/12/14 Future Task


Sun 6/29/14 Future Task
Tue 10/14/14 Future Task
Thu 10/2/14 Future Task
Mon 7/28/14 Future Task
Tue 10/14/14 Future Task
Fri 7/4/14 Future Task
Wed 3/11/15 Future Task
Sun 1/25/15 Future Task
Sun 1/25/15 Future Task
Sat 9/27/14 Future Task
Tue 11/11/14 Future Task
Wed 11/26/14 Future Task
Thu 8/28/14 Future Task
Wed 3/11/15 Future Task
Fri 12/26/14 Future Task
Wed 3/11/15 Future Task
Tue 1/27/15 Future Task
Thu 1/29/15 Future Task
Sun 5/10/15 Future Task
Fri 4/10/15 Future Task
Fri 4/10/15 Future Task
Tue 11/11/14 Future Task
Fri 12/26/14 Future Task
Sun 1/25/15 Future Task
Mon 10/27/14 Future Task
Sun 5/10/15 Future Task
Tue 2/24/15 Future Task
Sun 5/10/15 Future Task
Sun 4/12/15 Future Task
Tue 4/14/15 Future Task
Wed 11/12/14 Future Task
Wed 10/15/14 Future Task
Wed 10/15/14 Future Task
Wed 11/12/14 Future Task
Fri 9/26/14 Future Task
Wed 11/12/14 Future Task
Fri 12/12/14 Future Task
Sat 8/30/14 Future Task
Fri 8/15/14 Future Task
Sat 8/30/14 Future Task
Fri 12/12/14 Future Task
Fri 12/12/14 Future Task
Tue 10/14/14 Future Task
Sat 8/30/14 Future Task
Fri 9/19/14 Future Task
Sat 1/17/15 Future Task
Mon 9/29/14 Future Task
Sun 9/14/14 Future Task
Mon 9/29/14 Future Task
Sat 1/17/15 Future Task
Sat 1/17/15 Future Task
Wed 10/29/14 Future Task
Fri 11/28/14 Future Task
Thu 12/18/14 Future Task
Wed 2/18/15 Future Task
Sun 11/16/14 Future Task
Thu 10/2/14 Future Task
Mon 11/3/14 Future Task
Sun 11/16/14 Future Task
Wed 2/18/15 Future Task
Fri 10/24/14 Future Task
Wed 2/18/15 Future Task
Thu 12/18/14 Future Task
Tue 11/18/14 Future Task
Thu 11/20/14 Future Task
Wed 2/18/15 Future Task
Fri 11/14/14 Future Task
Thu 11/6/14 Future Task
Fri 11/14/14 Future Task
Wed 2/18/15 Future Task
Sun 11/16/14 Future Task
Wed 2/18/15 Future Task
Thu 12/18/14 Future Task
Sun 11/23/14 Future Task
Tue 11/25/14 Future Task
Mon 2/9/15 Future Task
Thu 12/11/14 Future Task
Sat 12/6/14 Future Task
Thu 12/11/14 Future Task
Mon 2/9/15 Future Task
Fri 12/26/14 Future Task
Mon 1/5/15 Future Task
Mon 2/9/15 Future Task
Thu 4/2/15 Future Task
Wed 12/31/14 Future Task
Mon 12/29/14 Future Task
Wed 12/31/14 Future Task
Thu 4/2/15 Future Task
Fri 1/30/15 Future Task
Thu 4/2/15 Future Task
Tue 3/3/15 Future Task
Thu 3/5/15 Future Task
Sat 3/7/15 Future Task
Sat 5/2/15 Future Task
Fri 1/30/15 Future Task
Fri 1/23/15 Future Task
Fri 1/30/15 Future Task

Feb

Mar

Apr

May

Jun
0%

Jul

Aug

Sep

Oct

Nov

2015
Jan

Dec

Feb

Mar

Apr

May

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

Critical

Task

Manual Task

Duration-only

Baseline Milestone

Summary

External Tasks

Inactive Milestone

Critical Split

Split

Start-only

Baseline

Milestone

Manual Summary

External Milestone

Inactive Summary

Critical Progress

Task Progress

Finish-only

Baseline Split

Summary Progress

Project Summary

Inactive Task

Deadline

Baseline 1

Jun

Jul

Aug

Sep

Oct

Nov

Dec

2016
Jan

Feb

Mar

Apr

May

SNRDP-CP2 Qingjian Group Co., Ltd. Baseline Schedule


ID
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
389
390

Task Name

Est. Duration Est. Start - Base Est. Finish 1


Base 1

1.7.1.15.2 Non-Seismic Retrofit


1.7.1.15.2.1 Repair of Cracks/Restore Concrete/Painting
1.7.1.15.2.2 Abutment Slope Protection
1.7.1.15.2.3 Provision of Asphalt Overlay
1.7.1.15.2.4 Repair of expansion joint
1.7.1.16 CAMP 5 bridge
1.7.1.16.1 Seismic Retrofit
1.7.1.16.1.1 Concrete Shear Keys at Abutment/Pier
1.7.1.16.1.2 Approach Slab
1.7.1.16.2 Non-Seismic Retrofit
1.7.1.16.2.1 Abutment Slope Protection
1.7.1.16.2.2 Pier Scour Protection
1.7.1.16.2.3 Repair of Expansion joint
1.7.1.16.2.4 Replacement of Superstructure
1.7.1.16.2.5 Replacement of Approach Sidewalk & Railing
1.7.1.17 CARBON 2 Bridge
1.7.1.17.1 Seismic Retrofit
1.7.1.17.1.1 Concrete Shear Keys at Abutment
1.7.1.17.1.2 Approach Slab
1.7.1.17.2 Non-Seismic Retrofit
1.7.1.17.2.1 Repair of Concrete/Painting of steel component
1.7.1.17.2.2 Abutment Slope Protection
1.7.1.17.2.3 Provision of Asphalt Overlay
1.7.1.17.2.4 Repair of expansion joint
1.7.1.18 TIGA BRIDGE
1.7.1.18.1 Seismic Retrofit
1.7.1.18.1.1 Concrete Shear Keys at Abutment
1.7.1.18.1.2 Approach Slab
1.7.1.18.1.3 Cutting of Existing Concrete Structures
1.7.1.18.2 Non-Seismic Retrofit
1.7.1.18.2.1 Repair of Concrete/Painting of steel component
1.7.1.18.2.2 Abutment Slope Protection
1.7.1.18.2.3 Provision of Asphalt Overlay
1.7.1.18.2.4 Repair of expansion joint
1.7.1.19 CARBON 1 Bridge
1.7.1.19.1 Seismic Retrofit
1.7.1.19.1.1 Concrete Shear Keys at Abutment/Pier
1.7.1.19.1.2 Approach Slab
1.7.1.19.2 Non-Seismic Retrofit
1.7.1.19.2.1 Abutment Slope Protection
1.7.1.19.2.2 Pier Scour Protection
1.7.1.19.2.3 Replacement of Superstructure
1.7.1.19.2.4 Replacement of Approach Sidewalk & Railing
1.7.1.20 BAGACAY BRIDGE
1.7.1.20.1 Seismic Retrofit
1.7.1.20.1.1 Concrete Shear Keys at Abutment/Pier
1.7.1.20.1.2 Approach Slab
1.7.1.20.2 Non-Seismic Retrofit
1.7.1.20.2.1 Abutment Slope Protection
1.7.1.20.2.2 Pier Scour Protection
1.7.1.20.2.3 Replacement of Superstructure
1.7.1.20.2.4 Approach Sidewalk & Railing
1.7.1.21 Complete Rehabilitation of Existing Bridges
1.7.2 Construction of New Bridges
1.7.2.1 LUMATOD BRIDGE
1.7.2.1.1 Bridge Approach/Earthworks
1.7.2.1.2 Temporay Detour at Lumatod Bridge Site
1.7.2.1.3 Removal of Existing Lumatod Bridge
1.7.2.1.4 Substructure
1.7.2.1.5 Superstructure
1.7.2.1.6 River Widening/Abutment Bank Slope Protection
1.7.2.2 BURAK BRIDGE
1.7.2.2.1 Bridge Approach/Earthworks
1.7.2.2.2 Temporary Detour at Burak Bridge Site
1.7.2.2.3 Removal of Existing Burak Bridge
1.7.2.2.4 Substructure
1.7.2.2.5 Superstructure
1.7.2.2.6 River Widening/Abutment Bank Slope Protection
1.7.2.3 BAYO BRIDGE
1.7.2.3.1 Replacement of Superstructure/Approach Sidewalk & Railing
1.7.2.3.2 Temporary Detour at Bayo Bridge Site
1.7.2.3.3 Removal of Existing Bayo Bridge
1.7.2.3.4 Substructure
1.7.2.3.5 Superstructure
1.7.2.3.6 River Widening/Abutment Bank Slope Protection
1.7.2.4 BINALOAN BRIDGE
1.7.2.4.1 Bridge Approach/Earthworks
1.7.2.4.2 Temporary Detour at Binaloan Bridge Site
1.7.2.4.3 Removal of Existing Bayo Bridge
1.7.2.4.4 Substructure
1.7.2.4.5 Superstructure
1.7.2.4.6 River Widening/Abutment Bank Slope Protection
1.7.2.5 CANSOLABAO BRIDGE
1.7.2.5.1 Bridge Approach/Earthworks
1.7.2.5.2 Temporary Detour at Cansolabao Bridge Site
1.7.2.5.3 Removal of Existing Cansolabao Bridge
1.7.2.5.4 Substructure
1.7.2.5.5 Superstructure
1.7.2.5.6 River Widening/Abutment Bank Slope Protection
1.7.3 COMPLETE BRIDGE WORKS
1.8 DRAINAGE AND SLOPE PROTECTION STRUCTURES
1.8.1 SECTION 3: STA 888+500 - STA 873+500 (15.00km)
1.8.1.1 Construction of Drainage Works (RCPC,RCBC, Headwalls, Wingwalls,Catch
Basin, Covered & Ditch Canal
1.8.1.2 Slope Stability /Protection Works
1.8.2 SECTION 2: STA 873+500 - STA 858+500 (15.00km)
1.8.2.1 Construction of Drainage Works (RCPC,RCBC, Headwalls, Wingwalls,Catch
Basin, Covered & Ditch Canal

51 days
Sat 1/31/15 Mon 3/23/15
33 days
Sat 1/31/15 Wed 3/4/15
30 days
Sun 2/22/15 Mon 3/23/15
2 days
Thu 3/5/15
Fri 3/6/15
2 days
Mon 2/2/15 Tue 2/3/15
180 days
Mon 12/22/14 Mon 6/1/15
86 days
Mon 12/22/14 Fri 2/27/15
35 days
Sat 1/24/15 Fri 2/27/15
30 days
Mon 12/22/14 Tue 1/20/15
132 days
Sun 2/8/15 Mon 6/1/15
30 days
Sun 5/3/15 Mon 6/1/15
30 days
Sat 2/28/15 Sun 3/29/15
2 days
Wed 2/18/15 Thu 2/19/15
30 days
Sat 2/28/15 Sun 3/29/15
30 days
Sun 2/8/15 Mon 3/9/15
182 days
Mon 1/19/15 Wed 7/1/15
32 days
Mon 1/19/15 Thu 2/19/15
20 days
Mon 1/19/15
Sat 2/7/15
30 days
Wed 1/21/15 Thu 2/19/15
104 days
Fri 3/20/15 Wed 7/1/15
25 days
Fri 3/20/15 Mon 4/13/15
30 days
Tue 6/2/15 Wed 7/1/15
2 days
Tue 4/14/15 Wed 4/15/15
2 days
Thu 4/16/15 Fri 4/17/15
64 days
Fri 3/20/15 Fri 5/22/15
37 days
Fri 3/20/15 Sat 4/25/15
20 days
Fri 3/20/15 Wed 4/8/15
25 days
Wed 4/1/15 Sat 4/25/15
7 days
Fri 3/20/15 Thu 3/26/15
44 days
Thu 4/9/15 Fri 5/22/15
20 days
Thu 4/9/15 Tue 4/28/15
25 days
Tue 4/28/15 Fri 5/22/15
2 days
Sun 4/26/15 Mon 4/27/15
2 days
Tue 4/28/15 Wed 4/29/15
157 days
Sun 7/27/14 Tue 12/30/14
58 days
Sun 7/27/14 Mon 9/22/14
30 days
Sun 7/27/14 Mon 8/25/14
30 days
Sun 8/24/14 Mon 9/22/14
111 days
Thu 9/11/14 Tue 12/30/14
30 days
Mon 12/1/14 Tue 12/30/14
30 days
Mon 12/1/14 Tue 12/30/14
30 days
Thu 9/11/14 Fri 10/10/14
45 days
Wed 10/1/14 Fri 11/14/14
156 days
Thu 5/1/14 Fri 10/3/14
45 days
Thu 5/1/14 Sat 6/14/14
22 days
Thu 5/1/14 Thu 5/22/14
45 days
Thu 5/1/14 Sat 6/14/14
104 days
Sun 6/22/14 Fri 10/3/14
34 days
Sun 8/31/14 Fri 10/3/14
21 days
Sun 8/10/14 Sat 8/30/14
45 days
Sun 6/22/14 Tue 8/5/14
45 days
Sun 8/10/14 Tue 9/23/14
0 days
Wed 9/30/15 Wed 9/30/15
387 days
Sun 3/23/14 Mon 4/13/15
174 days
Sun 3/16/14
Fri 9/5/14
20 days
Sun 4/13/14
Fri 5/2/14
13 days
Sun 3/16/14 Fri 3/28/14
25.5 days
Sun 3/30/14 Thu 4/24/14
80 days
Sun 4/27/14 Tue 7/15/14
60 days
Sun 6/22/14 Wed 8/20/14
20 days
Sun 8/17/14
Fri 9/5/14
186 days
Sun 3/23/14 Wed 9/24/14
20 days
Sun 4/6/14 Fri 4/25/14
10 days
Sun 3/23/14 Tue 4/1/14
20 days
Sun 4/6/14 Fri 4/25/14
69 days
Thu 5/1/14 Tue 7/8/14
30 days
Wed 7/9/14 Thu 8/7/14
20 days
Fri 9/5/14 Wed 9/24/14
171 days
Thu 9/25/14 Sat 3/14/15
20 days
Thu 9/25/14 Tue 10/14/14
10 days
Wed 10/15/14 Fri 10/24/14
20 days
Sat 10/25/14 Thu 11/13/14
60 days
Fri 11/14/14 Mon 1/12/15
30 days
Tue 1/13/15 Wed 2/11/15
20 days
Mon 2/23/15 Sat 3/14/15
307 days
Wed 6/11/14 Mon 4/13/15
30 days
Sun 12/21/14 Mon 1/19/15
25 days
Sun 7/13/14 Wed 8/6/14
26 days
Wed 6/11/14 Sun 7/6/14
125 days
Mon 7/7/14 Sat 11/8/14
60 days
Sun 11/9/14 Wed 1/7/15
30 days
Sun 3/15/15 Mon 4/13/15
191 days?
Sun 8/10/14 Mon 2/16/15
30 days
Sun 8/24/14 Mon 9/22/14
15 days
Sun 8/10/14 Sun 8/24/14
20 days?
Sun 8/31/14 Fri 9/19/14
60 days
Sun 9/21/14Wed 11/19/14
60 days
Sun 11/23/14 Wed 1/21/15
30 days?
Sun 1/18/15 Mon 2/16/15
0 days
Wed 9/30/15 Wed 9/30/15
921 days
Fri 8/23/13 Mon 2/29/16
354.95 days
Fri 8/23/13 Tue 8/12/14
191.95 days Sun 11/3/13 Tue 8/12/14
212 days
305 days
215 days

Wed 1/1/14 Thu 7/31/14


Wed 4/30/14 Sat 2/28/15
Wed 4/30/14 Sun 11/30/14

Baseline Start

Baseline Finish

Status
Apr

Sat 1/31/15
Sat 1/31/15
Fri 4/3/15
Thu 3/5/15
Sat 3/7/15
Sat 1/24/15
Sat 1/24/15
Sat 1/24/15
Sat 1/31/15
Sat 2/28/15
Sun 5/3/15
Sat 2/28/15
Mon 3/30/15
Sat 2/28/15
Fri 3/20/15
Sat 2/28/15
Sat 2/28/15
Sat 2/28/15
Mon 3/2/15
Fri 3/20/15
Fri 3/20/15
Tue 6/2/15
Tue 4/14/15
Thu 4/16/15
Fri 3/20/15
Fri 3/20/15
Fri 3/20/15
Wed 4/1/15
Fri 3/20/15
Thu 4/9/15
Thu 4/9/15
Tue 4/28/15
Sun 4/26/15
Tue 4/28/15
Thu 4/9/15
Thu 4/9/15
Thu 4/9/15
Thu 4/9/15
Sat 5/9/15
Mon 6/8/15
Sat 5/9/15
Sat 5/9/15
Fri 5/29/15
Sat 5/9/15
Sat 5/9/15
Sat 5/9/15
Sat 5/9/15
Tue 6/23/15
Fri 8/28/15
Fri 8/7/15
Tue 6/23/15
Mon 7/13/15
Wed 9/30/15
Sun 12/1/13
Sun 12/1/13
Sun 12/1/13
Sat 12/21/13
Sat 12/28/13
Mon 1/27/14
Thu 4/17/14
Mon 7/14/14
Sat 12/21/13
Sat 12/21/13
Fri 1/10/14
Mon 1/20/14
Sun 4/20/14
Wed 7/9/14
Fri 9/5/14
Thu 9/25/14
Thu 9/25/14
Wed 10/15/14
Sat 10/25/14
Fri 11/14/14
Tue 1/13/15
Fri 3/20/15
Thu 9/25/14
Thu 9/25/14
Sat 10/25/14
Fri 11/14/14
Wed 12/10/14
Sun 2/8/15
Thu 4/9/15
Thu 2/12/15
Thu 2/12/15
Sat 3/14/15
Sun 3/29/15
Sat 4/18/15
Wed 6/17/15
Sun 8/16/15
Wed 9/30/15
Fri 11/1/13
Fri 11/1/13
Fri 11/1/13

Sat 5/2/15 Future Task


Wed 3/4/15 Future Task
Sat 5/2/15 Future Task
Fri 3/6/15 Future Task
Sun 3/8/15 Future Task
Mon 6/1/15 Future Task
Sun 3/1/15 Future Task
Fri 2/27/15 Future Task
Sun 3/1/15 Future Task
Mon 6/1/15 Future Task
Mon 6/1/15 Future Task
Sun 3/29/15 Future Task
Tue 3/31/15 Future Task
Sun 3/29/15 Future Task
Sat 4/18/15 Future Task
Wed 7/1/15 Future Task
Tue 3/31/15 Future Task
Thu 3/19/15 Future Task
Tue 3/31/15 Future Task
Wed 7/1/15 Future Task
Mon 4/13/15 Future Task
Wed 7/1/15 Future Task
Wed 4/15/15 Future Task
Fri 4/17/15 Future Task
Fri 5/22/15 Future Task
Sat 4/25/15 Future Task
Wed 4/8/15 Future Task
Sat 4/25/15 Future Task
Thu 3/26/15 Future Task
Fri 5/22/15 Future Task
Tue 4/28/15 Future Task
Fri 5/22/15 Future Task
Mon 4/27/15 Future Task
Wed 4/29/15 Future Task
Sun 7/12/15 Future Task
Fri 5/8/15 Future Task
Fri 5/8/15 Future Task
Fri 5/8/15 Future Task
Sun 7/12/15 Future Task
Tue 7/7/15 Future Task
Sun 6/7/15 Future Task
Sun 6/7/15 Future Task
Sun 7/12/15 Future Task
Wed 9/30/15 Future Task
Mon 6/22/15 Future Task
Mon 6/22/15 Future Task
Mon 6/22/15 Future Task
Wed 9/30/15 Future Task
Wed 9/30/15 Future Task
Thu 8/27/15 Future Task
Thu 8/6/15 Future Task
Wed 8/26/15 Future Task
Wed 9/30/15 Future Task
Mon 9/14/15 Future Task
Sat 8/2/14 Future Task
Fri 12/20/13 Future Task
Fri 12/27/13 Future Task
Sun 1/26/14 Future Task
Wed 4/16/14 Future Task
Sun 6/15/14 Future Task
Sat 8/2/14 Future Task
Wed 9/24/14 Future Task
Thu 1/9/14 Future Task
Sun 1/19/14 Future Task
Sat 2/8/14 Future Task
Tue 7/8/14 Future Task
Thu 8/7/14 Future Task
Wed 9/24/14 Future Task
Wed 4/8/15 Future Task
Tue 10/14/14 Future Task
Fri 10/24/14 Future Task
Thu 11/13/14 Future Task
Mon 1/12/15 Future Task
Wed 2/11/15 Future Task
Wed 4/8/15 Future Task
Fri 5/8/15 Future Task
Fri 10/24/14 Future Task
Tue 11/18/14 Future Task
Tue 12/9/14 Future Task
Sat 2/7/15 Future Task
Wed 4/8/15 Future Task
Fri 5/8/15 Future Task
Mon 9/14/15 Future Task
Fri 3/13/15 Future Task
Sat 3/28/15 Future Task
Fri 4/17/15 Future Task
Tue 6/16/15 Future Task
Sat 8/15/15 Future Task
Mon 9/14/15 Future Task
Wed 9/30/15 Future Task
Mon 2/29/16 On Schedule
Thu 7/31/14 On Schedule
Thu 7/31/14 On Schedule

Wed 1/1/14
Wed 4/30/14
Wed 4/30/14

Thu 7/31/14 On Schedule


Sat 2/28/15 Future Task
Sun 11/30/14 Future Task

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

2014
Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

2015
Jan

Feb

Mar
0%
0%
0%
0%

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

2016
Jan

Feb

Mar

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
9/30
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
9/30
6%
34%
10%

0%
0%

Critical

Task

Manual Task

Duration-only

Baseline Milestone

Summary

External Tasks

Inactive Milestone

Critical Split

Split

Start-only

Baseline

Milestone

Manual Summary

External Milestone

Inactive Summary

Critical Progress

Task Progress

Finish-only

Baseline Split

Summary Progress

Project Summary

Inactive Task

Deadline

Baseline 1

Apr

May

SNRDP-CP2 Qingjian Group Co., Ltd. Baseline Schedule


ID
391
398
399
400
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464

Task Name

Est. Duration Est. Start - Base Est. Finish 1


Base 1

1.8.2.2 Slope Stability /Protection Works


1.8.3 SECTION 1: STA 858+500 - STA 843+500 (15.00km)
1.8.3.1 Construction of Drainage Works (RCPC,RCBC, Headwalls, Wingwalls,Catch
Basin, Covered & Ditch Canal
1.8.3.2 Slope Stability /Protection Works
1.8.4 SECTION 4: STA 888+500 - STA 907+281.82 (18.78km)
1.8.4.1 Construction of Drainage Works (RCPC,RCBC, Headwalls, Wingwalls,Catch
Basin, Covered & Ditch Canal
1.8.5 Complete Drainage and Slope Protection Structures
1.9 MISCELLANEOUS STRUCTURES
1.9.1 ROAD STRUCTURES/SIGNAGES/MARKINGS
1.9.2 LANDSCAPING
1.9.3 STREET LIGHTING SYSTEM
1.9.3.1 Excavation works
1.9.3.2 Installation of necessary appurtenances for foundation
1.9.3.3 Erection of Pedestal and Posts
1.9.3.4 Concrete Ducting works
1.9.3.5 Backfilling works
1.9.3.6 Installation of necessary appurtenances to complete
1.9.3.7 Installation of roadlight luminaire
1.9.3.8 Testing and commissioning
1.9.3.9 Complete Street Lighting System
1.10 PROVISIONAL SUMS
1.10.1 RELOCATION OF ELECTRICAL DISTRIBUTION SYSTEM
1.10.1.1 Relocation works (With ESAMELCO)
1.10.1.2 Complete Relocation
1.10.2 Removal and Relocation of Existing Barangay Markers
1.10.2.1 Removal and Relocation of Markers
1.10.2.2 Complete Removal and Relocation of Markers
1.10.3 PROVISIONAL SUMS
1.10.3.1 Provisional Sum
1.10.3.2 Complete Provisional Sum
1.11 DAYWORK
1.11.1 Daywork
1.12 MOBILIZATION/DEMOBILIZATION
1.12.1 Mobilization
1.12.2 Demobilization
1.12.3 As-Built
1.13 COMPLETE CP2 PROJECT

Baseline Start

Baseline Finish

Status
Apr

212 days
717 days
215 days

Fri 8/1/14 Sat 2/28/15


Sat 3/15/14 Mon 2/29/16
Fri 8/1/14 Tue 3/3/15

Fri 8/1/14
Sat 3/15/14
Fri 8/1/14

Sat 2/28/15 Future Task


Mon 2/29/16 Future Task
Tue 3/3/15 Future Task

717 days
285 days
285 days

Sat 3/15/14 Mon 2/29/16


Mon 12/1/14 Fri 9/11/15
Mon 12/1/14 Fri 9/11/15

Sat 3/15/14
Mon 12/1/14
Mon 12/1/14

Mon 2/29/16 Future Task


Fri 9/11/15 Future Task
Fri 9/11/15 Future Task

0 days
883 days
579 days
170 days
661 days
193 days
200 days
207 days
100 days
199 days
230 days
240 days
60 days
0 days
486 days
486 days
486 days
0 days
180 days
180 days
0 days
486 days
486 days
0 days
514 days
514 days
1005 days
215 days
59 days
62 days
0 days

Mon 2/29/16 Mon 2/29/16


Mon 9/30/13 Mon 2/29/16
Mon 9/30/13 Mon 2/29/16
Sun 9/13/15 Mon 2/29/16
Thu 5/1/14 Sun 2/21/16
Thu 5/1/14 Sun 11/9/14
Mon 5/5/14 Thu 11/20/14
Wed 6/4/14 Sat 12/27/14
Wed 6/11/14 Thu 9/18/14
Fri 7/11/14 Sun 1/25/15
Tue 9/9/14 Sun 4/26/15
Mon 4/27/15 Tue 12/22/15
Tue 11/3/15
Fri 1/1/16
Sun 2/21/16 Sun 2/21/16
Wed 10/1/14 Sat 1/30/16
Wed 10/1/14 Sat 1/30/16
Wed 10/1/14 Fri 1/29/16
Sat 1/30/16 Sat 1/30/16
Mon 8/3/15 Sat 1/30/16
Mon 8/3/15 Fri 1/29/16
Sat 1/30/16 Sat 1/30/16
Wed 10/1/14 Sat 1/30/16
Wed 10/1/14 Fri 1/29/16
Sat 1/30/16 Sat 1/30/16
Tue 11/4/14 Thu 3/31/16
Tue 11/4/14 Thu 3/31/16
Mon 7/1/13 Thu 3/31/16
Mon 7/1/13 Fri 1/31/14
Mon 2/1/16 Wed 3/30/16
Sat 1/30/16 Thu 3/31/16
Thu 3/31/16 Thu 3/31/16

Mon 2/29/16
Thu 5/1/14
Thu 5/1/14
Sun 9/13/15
Thu 5/1/14
Thu 5/1/14
Mon 5/5/14
Wed 6/4/14
Wed 6/11/14
Fri 7/11/14
Tue 9/9/14
Mon 4/27/15
Tue 11/3/15
Sun 2/21/16
Wed 10/1/14
Wed 10/1/14
Wed 10/1/14
Sat 1/30/16
Mon 8/3/15
Mon 8/3/15
Sat 1/30/16
Wed 10/1/14
Wed 10/1/14
Sat 1/30/16
Tue 11/4/14
Tue 11/4/14
Mon 7/1/13
Mon 7/1/13
Mon 2/1/16
Sat 1/30/16
Wed 3/30/16

Mon 2/29/16 Future Task


Mon 2/29/16 On Schedule
Mon 2/29/16 On Schedule
Mon 2/29/16 Future Task
Sun 2/21/16 Future Task
Sun 11/9/14 Future Task
Thu 11/20/14 Future Task
Sat 12/27/14 Future Task
Thu 9/18/14 Future Task
Sun 1/25/15 Future Task
Sun 4/26/15 Future Task
Tue 12/22/15 Future Task
Fri 1/1/16 Future Task
Sun 2/21/16 Future Task
Sat 1/30/16 Future Task
Sat 1/30/16 Future Task
Fri 1/29/16 Future Task
Sat 1/30/16 Future Task
Sat 1/30/16 Future Task
Fri 1/29/16 Future Task
Sat 1/30/16 Future Task
Sat 1/30/16 Future Task
Fri 1/29/16 Future Task
Sat 1/30/16 Future Task
Thu 3/31/16 Future Task
Thu 3/31/16 Future Task
Thu 3/31/16 On Schedule
Mon 9/30/13 Complete
Wed 3/30/16 Future Task
Thu 3/31/16 Future Task
Wed 3/30/16 Future Task

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

2014
Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

2015
Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

2016
Jan

Feb

Mar

Apr

0%
0%

0%
0%
2/29
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
2/21
0%
0%
0%
1/30
0%
0%
1/30
0%
0%
1/30
0%
0%
64%
100%
0%
0%
3/31

Critical

Task

Manual Task

Duration-only

Baseline Milestone

Summary

External Tasks

Inactive Milestone

Critical Split

Split

Start-only

Baseline

Milestone

Manual Summary

External Milestone

Inactive Summary

Critical Progress

Task Progress

Finish-only

Baseline Split

Summary Progress

Project Summary

Inactive Task

Deadline

Baseline 1

May