OAM
OAM (Operation, Administration and Maintenance) refers to the production, organization and management activities to ensure the normal, safe and effective operation of networks and services, called as Operation, Administration and Maintenance or OAM for short. According to the actual needs of network operators, OAM can be usually classified into 3 types: Operation Operation mainly analyzes daily network state, monitors alarms and controls performance. Management Management is to analyze, forecast, plan and configure daily network and service. Maintenance Maintenance is to conduct such daily operation activities as test and trouble management etc. of the network and its service.
Page3
OAM Classification
According to functions, OAM can be classified into:
Trouble management: trouble testing, trouble classification, trouble positioning and trouble notification etc. Performance management: performance monitoring, performance analysis and performance management and control etc. Protection and recovery: protection system and recovery system etc.
Page4
OAM Terms
Management Entity (ME) An entity in need of management indicates the relation between two MEPs. In T-MPLS , the basic ME is a T-MPLS path. Nest is allowed between MEs, but no overlapping is allowed among more than 2 MEs. ME Group (MEG) A group of MEs should meet the following conditions: Belong to the same management domain; Belong to the same MEG layer; Belong to the same point-to-point or point-to-multipoint TMPLS connection. For point-to-point T-MPLS connection, a MEG includes a ME. For point-to-N (N>1)-point connection, a MEG includes N MEs.
Page5
OAM Terms
MEG End Point (MEP) It's used for marking the beginning and ending of a MEG and it can generate and terminate OAM grouping. MEG Intermediate Point (MIP) MEG Intermediate Point can not generate OAM group, but it can select special actions for some OAM groups and transmit passing-by T-MPLS frames transparently. MEP and MIP are designated by the management plane or control plane. MEG Level (MEL) When many MEGs nest, it is used for distinguishing various MEG OAM groups, and OAM groups in tunnels are processed by adding MELs in source direction and reducing MELs in destination direction.
Page6
Client equipment
Client equipment
LSP layer
LSP layer
LSP layer
LSP layer
LSP (tunnel)
LSP (tunnel)
Client service
Page7
T-MPLS channel layer presents PW information and indicates a VC channel; T-MPLS path expresses a T-MPLS tunnel, i.e. LSP; T-MPLS section indicates the sub-layer network of a T-MPLS, protecting the detection on the link layer; in T-MPLS OAM, it respectively correspond to the OAM detection on three layers: TMC, TMP and TMS. 8 Page8
last
End TLV
Page9
Function
Purpose
Page11
In case no CV frames can be received within 3.5 times of transmission period, LOC (loss of continuity) alarms will generate. Page12
LB: Loopback
Loopback function. MEP is the starting point for Loopback to request for grouping and the execution point of Loopback can be MEP or MIP. It's used for verifying the connection in between MEPs or between MEP and MIP. It is used for bi-directional on-line or off-line diagnosis between MEPs and for testing bandwidth throughout and bit error rate etc. LBM and LBR
LCK: Lock
It's used for informing MEP at the opposite end that MEP at the home end has interrupted the normal service as required by management. MEP at the opposite end can judge whether the service interruption is foreseen or caused by troubles.
Page13
Page14
Page15
Customer Equipment
MEP Configuration
MEG ID
MEG Layer Local MEP ID MEP ID of opposite end Sending cycle of CC message CC active
MIP Configuration
MEG ID MEG Layer Local MIP ID
Page16
Page17
OAM Alarm
MMG: Used for receiving mismatching MEG-ID. UNM: When MEG-ID matches, source MEP-ID of received CV frames mismatch local expectation values. UNP: When MEG-ID matches the expected MEP-ID, time interval to receive CV frames mismatch s the local transmitting time interval. LOC: No correct CV frames are received within 3.5 transmitting cycles in a row. RDI: Used by MEP for informing its counterpart MEP that it has some defects and only used for bidirectional T-MPLS connection. Its information shall be initiated by the defective MEP and the information shall be sent to its counterpart MEP periodically until defects are cleared.
Page18
Summary
Since OAMs of PTN network path can be classified into three OAM layers: TMS, TMP and TMC, where:
OAM at TMS layer is mainly used for WRAPPING protection and MCC communication; OAM at TMP layer is mainly used for LSP1:1/1+1 protection; OAM at TMC layer is closest to the service layer, therefore OAM frames at TMC layer can be used for simulation test of service continuity.
Page19
Agenda
1.OAM and Its Application 2.Typical Troubleshooting 3. Instrument Detection 4. PTN Engineering Cases
Page20
Page21
Trouble Example
Trouble description: FE1 of card ESJ1 at Slot Position 1F in Office 1 has developed an FE service to Port FE3 in Office 9, which is reflected to be unavailable.
Page22
Trouble Example
According to the first processing step, it shall detect the continuity of PW layer first. Detection means: CV frames in PW configuration CV frames on PW layer are defaulted to be disabled, therefore, they are necessary to be opened at both the source end and destination end in the PW configuration. Position of PW configuration in single board configuration: 1. 660 low-level service is configured on XCU; 2. 660 high-level service is configured on the corresponding UNI card;
Trouble Example
According to the service shown in the example, we need to open CV frames both in ESJ1 in Office 1 and in 620 PW configuration. Corresponding configurations are as follows:
Page24
Trouble Example
At this time, the 2 conditions below may appear: 1. No TMC_LOC alarms are on service cards of the source and destination sites; 2. TMC_LOC alarms are on all service cards of the source and destination sites, or TMC_LOC alarms are on the service card of either site.
Description: Condition 1 indicates that the line channel is continuous, therefore, trouble causes can be positioned to add/drop voice service sites of the source and destination. At this time, single card configuration mapping shall be checked emphatically and performance method is needed to position trouble points under the condition of correct card configuration mapping; Condition 2 indicates that the line channel is in discontinuity and trouble causes may be in the intermediate straight-through sites or the source or destination of add/drop voice service.
Page25
Condition 1
1. Check whether there are abnormal alarms on the service signal disc first and alarms about configuration mismatch and unit disc troubles must be handled. These two kinds of alarms are caused by wrong configurations, therefore inspection shall be mainly conducted on whether the labels, PW labels, VLAN ID, simulation serial numbers, LSP-ID and PW-ID being used are repeated. 2. If no obvious alarms for wrong configuration are found, card configuration mapping shall be inspected, mainly including items such as interface mode, correlation configuration, VPWS configuration, PW configuration and TUNNEL instrument configuration.
Page26
Condition 1
Mapping rules are: Operating mode of interfaces (determining whether interfaces can operate normally) Interface correlation mode (determining whether services can be accepted at interfaces) Flow classification value in VPWS configuration (determining whether its accessible to PW according to VLAN values or simulation serial numbers) NNI in VPWS configuration (assigned PW-ID for the service is found in NNI interface) PW configuration block (ingress/egress PW labels and TUNNEL/LSP index can be known by searching out the corresponding items according to PW-ID)
Condition 2
When CV frames at TMC layer are opened for equipments at both the source end and destination end, if TMC_LOC alarm still exists, it indicates that the channel is in discontinuity and now it's necessary to conduct troubleshooting one by one from the source site according to the following steps (mainly depending on the performance method): 1. Inspect whether packets are received at the UNI interface and whether there are lost packet, damaged packet, wrong packet or broken packet therein? 2. If packets are received at corresponding UNI interface, whether the TMC concerned has corresponding packets? 3. Whether corresponding TMP of TMC has corresponding packets? 4. Whether corresponding TMP of the straight-through site has corresponding packets to be forwarded?
Page28
Normally, if interface LAN3 has received packets, its corresponding TMC shall also have packets. If its corresponding TMC has no corresponding packets, it indicates that the service has not completed the add voice service. As shown in the figure above: corresponding service of TMC1 corresponds to the service with a label value of 400.
Current performance in the figure above indicates that the service can complete add voice service. Page29
Total packets received by TMP1 are equal to those received by S15.1, Total packets sent out by TMP1 are equal to those sent out by S15.2,
As shown in the figure above, hexadecimal label value of TMP1 is 0x190, which corresponds to decimal 400 Performance in the figure above indicates that service with label value of 400 can complete the straight-through from 14.1 to 15.1
Page30
As shown in the figure, TMP1 channel of XSJ2 has total packet numbers received, and TMP1 of ESJ1 has total packet number sent out, so if the corresponding label values of TMP1 of the two cards are the same, the service can complete the straight-through from XSJ2 to ESJ1.
Page31
Agenda
1.OAM and Its Application 2.Typical Troubleshooting 3. Instrument Detection 4. PTN Engineering Cases
Page32
Topology Description
As shown in the figure below, Office 1, 2 and 3 are of 660 equipment, Office 4, 5 and 6 are of 640 equipment and Office 7, 8 and 9 are of 620 equipment. Develop a 100 M service from Office 1 to Office 8.
Page33
Topology Description
Use Smartbits table to transmit unicast packet 6000.
Page34
Page35
Page36
Page37
Page38
Page39
Page40
Page41
Page42
Agenda
1.OAM and Its Application 2.Typical Troubleshooting 3. Instrument Detection 4. PTN Engineering Cases
Page43
Case 1 Connection between S1J1 of Equipment 660 and 0155-8 of Equipment ASON - 1
[Phenomenon description] As shown in the figure, the 2G service of a certain project is transmitted with PTN network and MSTP network. of which, card S1J1 of PTN Equipment 660 is connected with card 0155-8 of ASON. It is found that card S1J1 connected to PTN equipment reports LP-RDI that the channel used for alarm service at BSC side is unavailable.
Page44
Case 1 Connection between S1J1 of Equipment 660 and 0155-8 of Equipment ASON - 2
[Processing procedure] When equipment loopback at the line interface is made on the card S1J1 of the connected PTN, the LP-RDI alarm on card S1J1 disappears and the service from base site to PTN equipment is normal, so the problem of equipment troubles at the PTN side is excluded. When equipment loopback is made on card 0155-8 of connected Equipment MSTP, similarly, the LP-RDI alarm on the card disappears and the service channel at the BSC side is normal, so the problem of equipment troubles at the MSTP side is excluded. It's found to be normal by checking the connecting time slot of Equipment PTN and Equipment ASON, so the problem of configuration is excluded. When line loopback is made on card S1J1 of connected PTN, the channel used for alarm service at the BSC side is unavailable. When a hard loop is made on Equipment PTN by being downloaded to site, the LP-RDI alarm on card S1J1 disappears and the service from base site to Equipment PTN is normal; when a hard loop is made on card 0155-8 of Equipment MSTP, the channel used for alarm service at the BSC side is unavailable. Therefore, the problems is positioned on the Optical Port of 0155-8. Replace the optical module at the corresponding Optical Port of 0155-8 and the channel used for alarm service at the BSC side is unavailable too. Then replace an Optical Port to remake the service and the whole service becomes normal.
Page45
Case 1 Connection between S1J1 of Equipment 660 and 0155-8 of Equipment ASON - 3
[Problem analysis] 1. The LP-RDI alarm is an optical disc alarm, so once the channel used for connected service is unavailable, the LP-RDI alarm will appear on the card S1J1 of Equipment PTN but no LP-RDI alarm will appear on the Optical Port disc of 0155-8. 2. When software equipment loopbacks are made on card of PTN and MSTP, the problems of Optical Port hardware cannot be positioned, so only when hard loops are made on them, can problems be positioned to the Optical Port and its module. [Supplementary information] 1. In a certain project, when many times of connections of Interface 0155-8 of Equipment 780B with Interface RNC are found, the optical disc reports the bit error alarm to the remote end and the alarm of high bit error ratio also appears on RNC. When Optical Port of card 0155-8 is replaced, the trouble alarm disappears. Page46
Case 2 Operating Mode for PTN Subnet to Eliminate Unnecessary VLAN Configuration Items crossways - 1
[Phenomenon description] Disc FE is inserted at Slot Position 12. Download 4 services for Port line1 in Office 4 from Port line 1 at Slot 12 in Office 1 first and then there will be 4 VLAN configuration items on the corresponding 100M discs. If we delete the services with the VIDs of 3, 4 and 5, the corresponding VLAN configuration items of the 3 services are not eliminated and still stay at the VLAN configuration of the card, which will bring up with unnecessary troubles to later inspection. Therefore, the VLAN configuration items for nonexistent services shall be deleted.
Page47
Case 2 Operating Mode for PTN Subnet to Eliminate Unnecessary VLAN Configuration Items crossways - 2
[Processing procedure]
1. Open the cross interface of subnet and right click on the corresponding NE.
Page48
Case 2 Operating Mode for PTN Subnet to Eliminate Unnecessary VLAN Configuration Items crossways - 3
2. Choose VLAN configurations. VLAN-ID values of corresponding slot positions can be found here, so choose the unneeded VLAN-ID values and delete them.
Page49
Case 2 Operating Mode for PTN Subnet to Eliminate Unnecessary VLAN Configuration Items crossways - 4
3. Conduct the same operations to the VLAN configurations of cards relevant with NEs at the opposite end, then close the dialog boxes and it will be OK to re-download the configurations. Thus, the relevant unused configurations will be eliminated.
[trouble detection and analysis] When cross data in the NMS is deleted, NMS keeps the relevant LAN configurations and considers that this VLAN is still in use so as not to delete it. Thus it's necessary for us to delete it manually. We can create, modify and delete the VLAN information of relevant cards through the VLAN management to NEs.
Page50
Case 3 Repetition of VLAN Configuration Leading to Interruption of Other 100M Data Transmission Services - 1
660-1
660-2
5
[Phenomenon description] One day, when an issued subnet crossing configuration is added, the users reflect that interruptions happened to another 100M service between Site 1# and Site 2#. This service is from Interface line4 at Slot Position 17 of Site 2 to Interface line12 at Slot Position 1B of Site 1.
Page51
Case 3 Repetition of VLAN Configuration Leading to Interruption of Other 100M Data Transmission Services - 2
[Processing procedure] 1. Check alarms on corresponding cards and no abnormal alarms are found; 2. Check the cross configurations of subnets and the service is in transmitting mode, so the cross configurations are correct; 3. Check single configurations of machine panels and it's found the operating mode of ports is correct, ports are enabled, configurations of PVID are normal and VMAN of Interface LAN is enabled; 4. Check the setting of VLAN and it's found that LAN Port 12 corresponds to 2 VLAN values in the "VLAN configuration" of the 100M card; 5. Delete the excessive VLAN values in subnet cross VLAN settings and VLAN configurations of card and save the downloaded cross, then the service recovers. [trouble analysis] 1. The cause is as follows: when cross data is deleted in subnet cross, the database of subnet saves relevant VLAN configuration. When services are added, the corresponding VLANs of the deleted services aren't duly deleted, so once a new subnet cross is added and downloaded configurations are saved, the VLAN in the subnet cross will recover the card configuration, which then causes unavailable services.
Page52