AREA : 8.00 BILL NO. 5 RESORT VILLA NO.

I 1 2 3 4 5 6 7 8 9 II Demolish work Demolish Vanity table c/ lavatory bowl dan taps Demolish Bidet existing c/ assesorie Demolish Closet existing c/ assesorie Demolish Shower area existing c/ taps and levelling Demolish floor existing Bathroom c/ with levelling Demolish finishing wall Bathroom and shower area existing Demolish existing alang-alang roof as described drawing Demolish existing pergola roof as described drawing Demolish wall existing Soil and sand work 1 Excavation soil c/ demolish wall, tie beam, foundation existing and back fill to footplate foundation 2 Excavation soil c/ back fill to Sunken tub 3 Compacted sand bed 10 cm to concrete slab Bathroom 4 Ditto Sunken Tub 5 Polyethelane sheet damp proof membrane bed 0.5 mm to concrete slab Bathroom 6 Ditto Sunken tub III Concrete work 1 Concrete bed 5 cm to footplate foundation 2 Concrete K175, 8 cm thickness with rebars dia. 8 mm - 200 mm single layer to floor Bathroom 3 Ditto to floor and wall Sunken tub 4 Concrete K225, footplate foundation 75x75 cm with rebars dia. 13 - 150 mm 5 Concrete K225, coloumn 15/15 cm with rebars 4 dia. 16 dan beugel dia. 8 - 200 6 Concrete K225, beam 15/25 cm with rebars 2x 3 dia. 16 dan beugel dia. 8 - 200 7 Concrete K225, roof plate 10 cm thickness with rebars dia. 10 200 mm 8 Waterproofing coating c/ with wiremesh and plaster to roof plate 9 Ditto concrete slab Bathroom 10 Ditto wall inside Bathroom 11 Ditto Sunken Tub IV Masonry work 1 Brick masonry with mortar 1 PC : 4 sands to wall 2 Plaster 1 PC : 5 sand to wall V Floor work 1 Polished Marble 30x30 cm, 2 cm thick with tumbled marble border 10x10 cm as indicated in drawing to Walk in closet VI Ceiling work 1 GRC 4 mm thickness c/ with bingkirai timber frame, hanger and galvanized nails (screw) as indicated in drawing and specification to ceiling Bathroom 2 Bingkirai timber 4/6 cm profile to cornice Bathroom VII Door and Window work Unit M2 M2 M3 M3 M3 M3 M3 M3 M3 M2 M2 M2 M2 M3 M3 M3 M3 M2 M2 Unit Unit Unit M2 M2 M2 M2 M2 M2 DESCRIPTION UNIT QTY RATE

M1

1 Bingkirai timber panel door with existing frame c/ removed frame existing, hardware, finishing Lasur as described in drawing D1 to Bathroom 2 Bingkirai timber louvre c/ Bingkirai frame, plastered frame, demolish wall, steel stack, finishing Lasur to Bathroom 3 Glass window c/ Bingkirai frame, hardware, glass 5 mm, demolish wall, steel stack, finishing Lasur as described in drawing W1 to Bathroom VIII Roof work

Unit Unit

1 Pergola wafer bingkirai timber beam 6/12 cm c/ finishing lasur as described in drawing 2 Bingkirai timber beam 8/15 cm profile c/ finishing lasur to support pergola 3 Bingkirai timber beam 3/3 cm profile c/ finishing lasur 4 Laminated glass 5+5 mm c/ with galvanize screw, alluminium glass closer, alluminium gutter and other necessary 5 Bingkirai timber beam with dimension as timber eave beam 1st existing c/ finishing Lasur 6 Bingkirai timber tatab with dimension as tatab timber existing c/ finishing Lasur 7 Tatched (alang-alang) roof w/ ate as described in drawing IX 1 2 3 4 Finished work Weathershield paint to wall outside Ditto Ceiling Lasur to cornice Tumbled marble and polished marble slab coping/faade as indicated in drawing to Sunken Tub 5 Polished Marble 30x30 cm, 2 cm thick as indicated in drawing to Bathroom wall 6 Marmo marble, 2 cm thick faade as indicated in drawing to Walk in closet wall 7 Paras kerobokan stone coping as indicated indrawing to roof plate X Fix Furniture and Furniture work

M2 M1 M1 M2 M1 M1 M2

M2 M2 M1 M2 M2 M2 M1

1 Polished marble slab top table and burned marble faade c/ with demolish wall, concrete, rebars and other necessary to Vanity table 2 Polished marble slab top table and burned marble faade c/ with demolish wall, concrete, rebars and other necessary to small table 3 Bevelled mirror c/ marble slab frame as indicated drawing and finishing polished to Bathroom 4 Marble slab frame finishing polish to Window W1' 5 Bingkirai timber blind c/ finishing lasur as described in drawing to Window (W1) 6 Robe hook chrome color 2326.04 Manor House & Heritage by Dorf product 7 Toilet roll holder chrome color 2334.04 Manor House & Heritage by Dorf product 8 Towel ring chrome color 2346.04 Manor House & Heritage by Dorf product 9 Dobel towel rail chrome color 2344.04 Manor House & Heritage by Dorf product 10 Towel rack chrome color 2350.04 Manor House & Heritage by Dorf product Sub Total XI Pekerjaan Sanitary 1 Colonial top assembly deck type set taps hot and cold w/ Caroma product c/ fitting and other necessary fittings to Sunken Tub 2 Colonial Vanity Basin Set Taps w/ Caroma product c/ fittings, drain, plug, P trap, stop valve, durable flexible hose and other necessary fittings to Vanity 3 Colonial top assembly wall type set taps c/ hot and cold w/ Caroma product c/ fitting and other necessary fittings to Hand and Head Shower 4 Totema rail and Shower set w/ Dorf Product c/ accessories 5 Toilet bowl Lexington type American Standard c/ fittings, p trap, stop valve, durable flexible hose and other necessary fittings as indicated in drawing and specification 6 Floor drain Sunken tub Toto TB 55 AS c/ with plug, chain and p trap 7 Wash basin Ideal Standard Ovalyn 21" c/ with bracket and other necessary fittings as indicated in drawing and specification 8 Floor drain Sanwell FD 50 MM CP c/w P-trap Austindotrap to Toilet XII Mechanical, Electrical and Plumbing Scope for MEP work included demolish, repair and finishing according existing or new design to existing installation, wall, floor, pathway, or ceiling, etc.

M1

Unit

Unit Unit Unit Unit Unit Unit Unit Unit

Set

Set

Set

Set Unit

Unit Unit

Set

Electrical work 1 MCB Lighting 10A Unit 2 MCB Outlet 16A Unit 3 NYY Cable lighting installation c/w connection, conduit cable, Point joint boxes, 3M rubber insulation, clamps, cable's glands & other necessary equipment to Lamp 4 NYY Cable outlet installation c/w connection, conduit cable, joint Point boxes, 3M rubber insulation, clamps, cable's glands & other necessary equipment to Standard Outlet 5 Eyeball recessed downlight halogen Osram, 24 W/12 V /41-827 Unit c/ fitting and other necessary 6 Timber box lamp with fluorescent light Osram lumilux 11 W/ 41 - Unit 827 and other necessary as indicated in drawing 7 One gang one way switch ex. Legrand Unit 8 Standard outlet ex. Legrand Unit 9 Standard outlet with trafo 110 V, 500 W ex. Legrand Unit Plumbing work 1 2 3 4 5 6 PVC AW class 3/4" diameter to clean water Ditto 1" to clean water Ditto 2" to sewerage water Ditto 4" to sewerage water Gate valve Kitazawa 1" c/ w box Thermaflex insulated copper pipe for hot water 3/4" diameter c/w fittings, hanger, bracket and other necessary fittings on water heater installation Gate valve Kitazawa 3/4" Check valve Kitazawa 3/4" Fitting & Acessories Miscellaneous Material Telephone work 1 Indoor telephone R-VV 0.4 mm2 cable ex Supreme or equal Point approved c/ with cable conduit, cable gland, terminal cable and other necessary supporting material as indicated in drawing and specification 2 Telephone outlet standard Legrand Mosaic 45 c/ w box, based Unit plate, covered plate, connector and other supporting material as indicated in drawing Mechanical work 1 Exhaust fan 250 CFM capacity Unit M1 M1 M1 M1 Unit M1

7 8 9 10

Unit Unit Ls Ls

PT. WIETASHA PUTRINDO WISATA

8.00 BILL 5 - 1

ALAM KULKUL RESORT PROJECT