Вы находитесь на странице: 1из 22

RTMDH, CABATUAN

Description
INFRA PROJECTS

EQUIPMENT

TOTAL

Upgrading of Emergency Room


Upgrading of Dietary Complex
Upgrading of Electrical System
Constructtion of power house
1 unit Hospital Ambulance
Service Vehicle
B.P. apparatus, aneroid Mobile Type
I.V. stand, stainless steel
2 units Fetal Doppler
Oxygen Regulator
Nebulizer Machine
computer workstation
Airconditioners, 3 tonner, 5 tonner
computer workstation

1,800,000.00
1,474,218.73

Year
Implemented
2010
2010

1,172,609.54
1,700,000.00
1,350,000.00
58,000.00
56,000.00
154,000.00
24,800.00
29,451.00
176,900.00
366,700.00
355,700.00

2011
2011
2012
2011
2011
2011
2011
2012
2010
2011
2012

Amount

8,786,397.73

IPH POTOTAN
Description
INFRA
PROJECTS

Completion of ground floor, main bldg.


Completion og OR-DR
Construction of Material Recovery Facility & extension of
Records Section
Improvement of Storm Drainage
Improvement of Station 1 and Installation of steel gate
Upgrading of Electrical System and Construction of
transformer pad

EQUIPMENT
S
Various Hospital Equipment

Amount

Year
Implemente
d

2,450,000.00
4,390,000.00

2010
2010

315,000.00
300,000.00

2010
2011

120,000.00
16,983,026.2
5

2011

3,848,675
28,406,701.2
5

2010-2012

RPGTMH,GUIMBAL

INFRA PROJECTS

EQUIPMENT

TOTAL

Description
completion of OPD, conference,
medical records
Construction of transformer pad and
upgrading of electrical system
Construction of 4 PHIC wards
Construction of Conference
Infant Incubator
Aircons (4 units of 3 tonners)
wheeled stretcher
bedside tables
Mechanical beds (20 units)
Overbed tables (20 units)
Fetal doppler
Oxygen gauge
Sphymomanometer
Mayo table, stainless

Amount

Year
Implemented

1,650,480.91

2010

1,531,084.22
1,200,000.00
1,800,000.00
298,000.00
452,500.00
58,000.00
190,000.00
398,000.00
68,000.00
48,000.00
26,650.00
110,000.00
39, 200.00
7,981,915.13

2010
2011
2011
2010
2012
2010
2011
2011
2011
2011
2011
2011
2010

SDH, SARA

INFRA PROJECTS

EQUIPMENT

Description
Repair/Renovation of wards
Upgrading of electrical system and
construction of powerhouse
X-ray machine
Ambulance
4 Suction Machine
Ambu Bag
EENT Set
12 nebulizers
Oxygen Gauge
Washing machine
2 units Osteorizer
Micro Pippetor
Macro Pippetor
10 units oxygen tank carriage
2 examination and Obstetrics table
2 units emergency cart
2 units wheeled stretcher

Amount
1,242,291.57

Year
Implemented
2010

1,349,075.83
3,850,000.00
1,235,000.00
34,200.00
72,900.00
37,800.00
62,940.00
69,540.00
44,995.00
9,999.00
19,000.00
19,000.00
108,000.00
22,800.00
160,000.00
162,000.00

2010
2011
2012
2010
2010
2010
2010-2011
2010
2010
2010
2010
2010
2011
2011
2011
2011

3 wheelchairs
30 electric fans and 2 aircons
Gas range
2 surgical suction pump
2 dopplers
chemistry analyzer
8 computer set with printer
Upright freezer
TOTAL

17,400.00
109,999.00
39,400.00
17,600.00
46,500.00
262,000.00
348,960.00
33,318.00
9,374,718.40

2011
2011
2011
2012
2012
2012
2012
2012

DRSPSMDH,CALINOG
Description
Repair & improvement of OB ward, pedia ward
INFRA PROJECTS
and nurse station
Construction of ER-OPD Complex
Upgrading of electrical system
Construction of Dietary Building

EQUIPMENT

Renovation and Improvement of Laboratory, Xray & Pharmacy


Improvement of Private Rooms and Medical
Charity wards
1 unit anesthesia machine
Diagnostic set
1 Desk type Adult sphygmomanometer with
stand
1 Desk type pedia sphygmomanometer
1 electric water pump 2hp
1 unit operating table
1 unit Hospital Ambulance
1 unit OR light
30 units hospital beds

Amount

Year
Implemented

5,000,000.00
11,600,000.00
3,405,439.15

2011-2012
2011
2011

7,500,000.00

2012

5,000,000.00

2012

4,000,000.00
2,380,000.00
17,000.00

2012
2010
2010

18,700.00
10,070.00
59,800.00
368,000.00
1,170,000.00
298,000.00
644,070.00

2010
2010
2010
2011
2011
2011
2011

X-ray Machine
Chemistry Analyzer
1 clinical centrifuge
6 units oxygen gauge with regulator
6 suction apparatus
1 adult resuscitator bag
1 pedia resuscitator bag
1 fetal Doppler apparatus
1 hematocrit centrifuge
3 pedia sphygmomanometer with stethoscope
Refrigerator 8.5 cu ft
TOTAL

3,400,000.00
262,000.00
14,800.00
8,640.00
62,520.00
8,400.00
8,450.00
15,850.00
38,000.00
17, 400.00
19,155.00
45,326,294.15

2011
2011
2012
2012
2012
2012
2012
2012
2012
2012
2012

JMCDH, Balasan
Description
INFRA PROJECTS Completion of ER/OPD
Repair of Nursing Unit
EQUIPMENT

Repair of ward complex and Annex building


5 units BP apparatus
6 Aircons
Microscope
2 counting chamber
6 sphygmomanometer with stethoscope
2 examining table
1 wheeled stretcher with side rails
Hematocrit Centrifuge
1 Autoclave
12 hospital beds
Photocopying machine
3 BP Apparatus
3 Aircon
12 oxygen gauge regulator
12 bedside tables
12 overbed tables
1 suction machine
1 electrolyte machine

Amount

Year Implemented

1,450,000.00
3,112,242.58

2010
2010

4,600,000.00
55,320.00
119,590.00
6,400.00
5,000.00
8,970.00
27,574.00
27,000.00
149,500.00
128,000.00
372,000.00
42,500.00
12,210.00
56,690.00
17,976.00
35,998.00
55,200.00
192,000.00
368,000.00

2011
2010-2012
2010
2010
2010
2010
2010
2010
2010
2010
2011
2011
2011
2011
2011
2011
2011
2011
2011

1 chemistry analyzer
1 operating table
1 ambulance
1 service vehicle

325,000.00
600,000.00
1,320,000.00
1,200,000.00
14,287,179.58

2011
2011
2012
2012

FRTSMDH, JANIUAY
Description
INFRA
PROJECTS

EQUIPMENT

Rewiring of geriatric bldg


repainting of geriatrict bldg.
completion of dietary bldg and conference
room
1 Ambulance
Fetal doppler
3 channel resting ecg machine
Anesthesia Machine
Chemistry Analyzer
Dental unit
Defibrillator
2 ECG Machines
Infant incubator
hematology analyzer
cast cutter machine
Telephone system (PABX)
aneroid sphygmomanometer

Amount

Year
Implemented

935,000.00
300,000.00

2011
2011

2,400,000.00
1,170,000.00
15,000.00
133,500.00
788,000.00
262,000.00
119,985.00
399,998.00
117,000.00
261,920.00
938,000.00
72,000.00
165,300.00
35,000.00
8,112,709.00

2011
2010
2011
2011
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012

DVPSMDH, PASSI
Description
INFRA
PROJECTS

EQUIPMENT

Amount

Year
Implemented

Powerhouse

3,412,199.40

2010

OR/DR complex
Renovation of COH Qtr. & Dietary & records
Rm
Dental Unit
Fetal Doppler
ECG machine
Telephone system (PABX)
DR Light
OR Table
Food conveyor
Anesthesia Machine
Emergency Trolley
Unicart
X-ray Machine
Cautery Machine
OR light
Hematology Analyzer
Blood chemistry analyzer

3,700,000.00

2011

400,000.00
370,000.00
26,000.00
72,000.00
480,000.00
280,000.00
180,000.00
83,000.00
2,638,888.00
536,000.00
308,000.00
3,500,000.00
320,000.00
180,000.00
438,000.00
268,000.00

2012
2012

2012
2012
2012
2012
2012
2012
2012
2012

Ambulance
Service Vehicle

1,200,000.00
1,200,000.00
19,592,087.40

2012
2012

DDH,DUMANGAS

INFRA PROJECTS
EQUIPMENT

Description
X-Ray and Lab Bldg.
Upgrading of electrical system
Service Vehicle
Concrete water tank
Chemistry analyzer
Dental unit
6 unit aircons
electrolyte analyzer
30 hospital beds
operating light
anesthesia machine
2 operating tables
computers

TOTAL

Amount
1,778,569.90
1,436,063.13
848,500.00
356,379.69
268,000.00
224,000.00
292,000.00
268,000.00
534,000.00
390,000.00
984,499.00
330,000.00
158,400.00
7,868,411.72

Year
Implemented
2010
2010
2010
2012
2012
2012
2012
2012
2012
2012
2012
2012

DRYLMH, LAMBUNAO
Description
INFRA
PROJECTS

EQUIPMENT

Completion of OPD complex


Primary line completion
upgrading of x-ray, pharmacy and lab
complex
Temporary Drs' quarter
Construction of 10 private rooms
Sewerage treatment system
power house
upgrading of emergency room
upgrading of cadaver holding area
completion of dietary bldg.
construction of admin bldg.
const. of female dorm
const of male dorm, laundry and
housekeeping
Dental Units
UPS, LCD Monitors, Printers
Office Tables and chairs
Grass cutter
Lawn mower

Amount

Year
Implemented

914,153.00
500,000.00

2011
2011

6,706,449.35
373,522.00
2,600,000
400,000
240,000
3,000,000
240,000
1,594,000.00
12,000,000.00
5,500,000.00

2012
2012
2012
2012
2012
2012
2012
2012
2012
2012

3,000,000.00
240,000.00
69,827.00
150,320.00
33,740.00
20,400.00

2012
2010
2010
2010
2010
2010

Wall fans
Food conveyor
Infant incubators
2 ambulance
shuttle van
Manual resuscitator for pedia and adult
Oxygen gauge regulator
Digital camera
Photocopier and developer
Computer set, Table, Laptop and Printer
Conference tables and chairs
X-ray machine
Generator
ECG Machine
Chemistry analyzer
Aircons
400 amp automatic transfer switch
Patient charts
Mobile compact LED Light
2 Computer sets and HIMS

38,850.00
2010
155,500.00
2010
350,000.00
2010
2,192,000.00 2010-2012
1,110,000.00
2011
22,400.00
2011
15,600.00
2011
49,495.00
2011
55,000.00
2011
131,145.00
2011
288,000.00
2011
3,500,000.00
2011
690,000.00
2011
260,000.00
2011
288,000.00
2011
150,025.00
2011
150,000.00
2012
14,350.00
2012
350,000.00
2012
800,000.00
2012
48,192,776.35

BVDH,BAROTAC VIEJO

INFRA PROJECTS

EQUIPMENT

TOTAL

Description
renovation of Lab, x-ray, pharmacy
Construction of housekeeping area,
parking, repair bay
Upgrading of electrical system
1 unit food conveyor
1 uoperating light
1 suction machine
1 chemistry analyzer
1 blood bank ref
autoclave machine
Anesthesia machine
OR Light
Portable Suction machine

Amount
1,780,000.00

Year
Implemented
2010

3,300,000.00
1,193,190.67
2011
140,107.50
545,000.00
163,200.00
348,000.00
110,000.00
264,499.00
1,400,000.00
2012
545,000.00
55,900.00
9,844,897.17

2012
2012
2012
2012
2012
2012
2012

ADH,ALEOSAN
Description
INFRA
PROJECTS

Construction of Septic Tank

Amount

Year
Implemented

163,000.00

2011

Upgrading of OR-DR
10,600,000.00
Upgrading of OPD, Pharmacy and Laboratory Services 2,768,945.84
EQUIPMENT Chemistry analyzer
318,000.00
Digital copier
36,500.00
Washing machine
44,586.00
Refrigerator
18,289.00
Anesthesia Machine
2,400,000.00
Ambulance
1,320,000.00
Utility vehicle
1,200,000.00
Generator set
658,500.00
OR light
785,000.00
Infant incubator
400,000.00
20,730,820.84

2011-2012
2011
2011

2012
2012
2012
2012
2012
2012

TOTAL HOSPITAL INVESTMENT


INFRASTRUCTURE
RTMDH, CABATUAN
4,446,828.27
IPH, POTOTAN
24,558,026.25
RPGTMH,GUIMBAL
6,181,565.13
SDH, SARA
2,591,361.40
DRSPSMDH,CALINOG
36,505,439.15
JMCDH, BALASAN
9,162,242.58
FRTSMDH, JANIUAY
4,805,000.00
DVPMDH, PASSI CITY
7,152,199.40
DDH, DUMANGAS
2,614,633.03
DRYLMDH, LAMBUNAO
37,068,124.35
BVDH, BAROTAC VIEJO
6,273,190.67
ADH, ALEOSAN
13,531,945,84
TOTAL
154,890,639.23

EQUIPMENT
4,339,569.46
3,848,625.00
1,850,350.00
6,783,351.00
8,820,855.00
5,124,937.00
3,307,709.00
12,439,888.00
5,253,778.69
11,124,652
3,571,706.50
7,198,875.00
73,664,296.65

Вам также может понравиться