What are the hazards?

Who might be What are harmed and your how? intended plans?
Employees on site, Clearly sign the trenches, Only allow workers to enter trenches when needed and forbid entrance if the ground is wet, "eep site clean with specific waste containers,

Possible further actions if needed


Use barriers around the trenches, ro!ide supports for the trench to pre!ent collapse,

Action by who

Action by when?

Done

Falls and trips caused by the trench, Trench collapse,

Site labourer,

Workers in the trenches,

Workers in!ol!ed with the trench,

Same day as trench construction has commenced, Same day as trench construction is completed,

Waste incorrectly stored on site,

Employees on site,

#aterials incorrectly stored on site, $ea!y machinery ,

Employees on site,

$a!e an allocated material storage space, "eep machinery clear when in operation, $a!e clear routes for !ehicles to tra!el down with a clear path pedestrians as well

Employees working near machinery, Employees on site and pedestrians,

roduce fines for employees not complying with these rules and if necessary employ another labourer, roduce fines for employees not complying with these rules, Use barriers around the machinery, &educe the speed limit on these routes and assign an employee to dictate the sites

Site labourer and workers contributing to waste,

Constantly throughout constructions site life cycle,

%ehicles on site and deli!eries,

Site labourer and workers who ha!e ordered the rele!ant materials, Workers in charge of rele!ant machinery, %ehicle dri!er, site labourer and rele!ant workers,

Constantly throughout constructions site life cycle, Whene!er the rele!ant machinery is in use, Whene!er deli!eries are due or machinery is dri!en,

$ea!y lifting

Employees re'uired to perform hea!y lifting, *ll Employees and !isitors,

as pedestrian crossings, Ensure rele!ant workers ha!e had sufficient training, ro!ide ersonal rotecti!e safety E'uipment + E, for employees and that the site has a trained first aider as well as sufficient first aid kits, ro!ide cabins for tool storage,

traffic, ro!ide support e'uipment to aid in lifting, roduce fines for employees who show e-cessi!e negligence, &ele!ant workers, Whene!er a new employee starts on the site, Constantly throughout constructions site life cycle,

(n)uries due to negligence

*ll personnel on site,

Tools incorrectly stored on site

*ll Employees and !isitors,

#aintenance of machinery

#achinery users and people on site,

The laying of concrete

Employees who are laying the ground beams,

erform regular checks on the machinery to ensure it is safe to operate, Supply sufficient E to rele!ant workers,

roduce fines for employees who are not correctly storing their tools, &eplace the rele!ant machinery,

&ele!ant workers,

Workers in charge of rele!ant machinery,

Falls from height . from edge of structure

Site workers

Fi- suitable edge protection to beams

Employ specialist in &ele!ant workers, laying concrete who ha!e more e-perience and ha!e more specified e'uipment, &estricted access Steel erectors around the site

Constantly throughout constructions site life cycle, *t regular, scheduled periods whilst rele!ant machinery is on site, To be complete prior to the scheduled construction,

Fi-ing holes pre drilled on beams, and edge protection fitted

Falls from height . during floor slab install 0eneral construction site risks to head, eyes, hands and feet1

Floor slab workers

*nybody on site

&e'uire use of harness when e-posed &e'uire full E at all times

Use of inertia wheel

Floor slab workers

3y all

during beam install Connected safely before entering unprotected /one 3efore entering site boundary