Академический Документы
Профессиональный Документы
Культура Документы
Who might be What are harmed and your how? intended plans?
Employees on site, Clearly sign the trenches, Only allow workers to enter trenches when needed and forbid entrance if the ground is wet, "eep site clean with specific waste containers,
Action by who
Action by when?
Done
Site labourer,
Same day as trench construction has commenced, Same day as trench construction is completed,
Employees on site,
Employees on site,
$a!e an allocated material storage space, "eep machinery clear when in operation, $a!e clear routes for !ehicles to tra!el down with a clear path pedestrians as well
roduce fines for employees not complying with these rules and if necessary employ another labourer, roduce fines for employees not complying with these rules, Use barriers around the machinery, &educe the speed limit on these routes and assign an employee to dictate the sites
Site labourer and workers who ha!e ordered the rele!ant materials, Workers in charge of rele!ant machinery, %ehicle dri!er, site labourer and rele!ant workers,
Constantly throughout constructions site life cycle, Whene!er the rele!ant machinery is in use, Whene!er deli!eries are due or machinery is dri!en,
$ea!y lifting
as pedestrian crossings, Ensure rele!ant workers ha!e had sufficient training, ro!ide ersonal rotecti!e safety E'uipment + E, for employees and that the site has a trained first aider as well as sufficient first aid kits, ro!ide cabins for tool storage,
traffic, ro!ide support e'uipment to aid in lifting, roduce fines for employees who show e-cessi!e negligence, &ele!ant workers, Whene!er a new employee starts on the site, Constantly throughout constructions site life cycle,
#aintenance of machinery
erform regular checks on the machinery to ensure it is safe to operate, Supply sufficient E to rele!ant workers,
roduce fines for employees who are not correctly storing their tools, &eplace the rele!ant machinery,
&ele!ant workers,
Site workers
Employ specialist in &ele!ant workers, laying concrete who ha!e more e-perience and ha!e more specified e'uipment, &estricted access Steel erectors around the site
Constantly throughout constructions site life cycle, *t regular, scheduled periods whilst rele!ant machinery is on site, To be complete prior to the scheduled construction,
Falls from height . during floor slab install 0eneral construction site risks to head, eyes, hands and feet1
*nybody on site
3y all
during beam install Connected safely before entering unprotected /one 3efore entering site boundary