Вы находитесь на странице: 1из 2

Project: Keadue WWTP Upgrade Works Section: Pipe Sizing

Drawing Ref:

Job No. : Calculation Sheet No :


1

Calculations By:
Ken Geelan

Checked By: Output

Date:

Reference:

Calculations

Pipe No. 1.0 - SMH 1 To SMH 2


INSERT RELEVANT DATA INTO HIGHLIGHTED AREAS

Item
Gradient of pipe (i) Q (actual) (l/s) Pipe Chosen (m) Q (provided) l/s Velocity (m/s) Proportionality IL 1 98.35

Calculations
IL 2 97.83 (6 x dwf) / (24 x 60 x 60) From HRS Graph From HRS Graph From HRS Graph Q (actual) / Q (provided) Dist 27

Value
1/52 2.000

0.225
31 1.8 6.45 %

For Use With Colebrook - White Equation


Diameter (m) 0.225 Discharge 2.000 Viscosity. 0.000001146 Gradient (i) 13/675 Gravity 9.81 Inverted (sf) 0.019 KS (roughness) 0.0006 Pipe Radius (m) 0.11265 Self Cleansing Velocity : 0.7 < 1.8 < 3 (achieved) Self cleansing velocity is achieved.

Using Colebrook - White equation


v= -2(2)(g)(D)(Sf) -0.58

x
x

Log((Ks/3.7D) +(2.71)()/D(2)(g)(D)(Sf)
-3.12

V =

1.82

Modified Colebrook - White Equation.


Q=VxA Q= Q= 0.073 72.519 m^3/sec L/sec

Proportionality = 0.027578832

Q (actual)/ Q

2.758

Project: Keadue WWTP Upgrade Works Section: Pipe Sizing


Drawing Ref:

Job No. : Calculation Sheet No :


2

Calculations By:
Ken Geelan

Checked By: Output

Date:

Reference:

Calculations

Pipe No. 1.0 - SMH 1 To SMH 2


Cos/2= = = A = P = -0.945 5.616

Radians

321.763 Degrees 0.000 0.075 0.004

M = A/P =

Modified Colebrook - White Equation. M = 0.004 V = -0.152 -1.973793

V =

0.301

M/s

Q=

0.012

M/s

Q=
Proportionality = =

12

L/s
(Qact/Qprov)

0.17

16.68