Completion Equipment

S h e l l EP Le Le a r n i n g

Copyright 2001 SIEP B.V

Well life cycle roles and responsibilities


Production technology (basis for well design)


Selection of suitable well type Reservoir well bore interface Tubing and casing size and quality

Drilling Engineer (well bore and structure detail design and construction

Construction of well bore and structure Installation of completion

Production Operations (well conduit detail design and maintenance of well)


Selection of components Acceptance of constructed asset Operate well Maintain availability of well
Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 1

Completion categories based on the reservoir wellbore interface

Casing

Production casing Cement Cement Liner hanger

Cap rock

Casing shoe

Productive formation

Slotted liner Perforations Sump Damaged zone

Openhole interval

Rubble or gravel

OPENHOLE COMPLETION

UNCEMENTED LINER COMPLETION

PERFORATED COMPLETION
Dr No TCM 6198 Copyright 2001 SIEP B.V Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

Completion functional requirements


Provide Protect

optimum flowing conditions casing emergency isolation

Downhole Permit Permit Isolate

downhole chemical injection downhole measurement producing zones

S h e l l EP Le Le a r n i n g

1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 2

S h e l l EP Le Le a r n i n g

S h e l l EP Le Le a r n i n g

1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 3

Copyright 2001 SIEP B.V

Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

S h e l l EP Le Le a r n i n g

1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 4

Copyright 2001 SIEP B.V

Copyright 2001 SIEP B.V

Bowl type tubing head

S h e l l EP Le Le a r n i n g

S h e l l EP Le Le a r n i n g

1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 5

Copyright 2001 SIEP B.V

Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

Permanent Packer

Simple

slip and packer design

Capable

of withstanding high tensile forces and differential pressures large through bore

Relatively Indicated

when:

Differential pressure across packer exceeds 5000 psi Temperature H2S

exceeds 225 deg F

is present workovers are expected


Copyright 2001 SIEP B.V

Infrequent

S h e l l EP Le Le a r n i n g

1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 6

Copyright 2001 SIEP B.V

Permanent Packer Characteristics


Top

and bottom slips element (solid / complex) rings for element

Packer

Anti-extrusion Ratch-latch

mechanism to hold

set
Milling

required to recover for milling lock rings

Designed

etc
Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

Packer Setting Options


Mechanical
Rotation Compression Tension

Hydraulic
Pressure

applied to tubing or annulus

Differential pressure acts on setting tool (permanent packer) or internal setting sleeve (retrievable packer) Preferred

method for deep / deviated wells

Electrical
Copyright 2001 SIEP B.V

Mechanical

setting mechanism using wireline setting tool

S h e l l EP Le Le a r n i n g

1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 7

Hydraulically Set Packers


Packer

set using internal pressure (against tubing plug) acts through port (A) on setting piston (B) pin (C) breaks
D

Pressure

Shear

Setting

sleeve drives bottom slips (D) up against cone (E) (F) and upper slips energised then slips break and bite into casing
B A

Element

S h e l l EP Le Le a r n i n g

Anchor Latch

Anchors the completion tubing to the packer Creates a static seal between the tubing and the packer Allows the packer to be run with the completion (one run) Can be rotated out of the packer Can be re-installed with a straight push into the packer
Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 8

Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

Polished Bore Receptacle (PBR)

S h e l l EP Le Le a r n i n g

1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 9

Copyright 2001 SIEP B.V

Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

S h e l l EP Le Le a r n i n g

1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 10

Copyright 2001 SIEP B.V

Copyright 2001 SIEP B.V

Advantage of having Seal Area above Packer

Tubing
d D

Max. Dia. Seal Area Packer Casing


D

S h e l l EP Le Le a r n i n g

Monobore Completion
9 5/ 8 Casing, 8.54 ID TRSCSSV Landing Nipple, 5.750 ID

7 Tubing, 5.963 ID

Flow Coupling Seal Stem, 6.023 ID Liner PBR, 7.50 ID Back Packer/Liner Hanger

7 Liner
Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 11

Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

Blowout Kuwait

S h e l l EP Le Le a r n i n g

1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 12

Copyright 2001 SIEP B.V

Copyright 2001 SIEP B.V

Wireline retrievable safety valve

S h e l l EP Le Le a r n i n g

Where in the string do we put the SCSSV?


Limitation of valve Hydrate depth Cratering depth Collapse limitation of tubing Scaling, wax, asphaltenes KO point Risk assessment Subsidence Earthquake
Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 13

Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

Safety Valve Landing Nipple


Control line Lock profile Honed bore Non welded shoulder to protect C/L while RIH Honed bore
Dr. No. TCM7803

S h e l l EP Le Le a r n i n g

Copyright 2001 SIEP B.V

1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 14

Copyright 2001 SIEP B.V

Integral annulus safety valve

S h e l l EP Le Le a r n i n g

S h e l l EP Le Le a r n i n g

1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 15

Copyright 2001 SIEP B.V

Copyright 2001 SIEP B.V

Ways of providing a circulation route


Sliding Side

side door

pocket mandrel tubing punch

Coiled Tubing

S h e l l EP Le Le a r n i n g

Reverse v forward circulation


Potentially Less

corrosive well fluids kept off casing

pressure on surface equipment direction for the flow of the lighter hydrocarbons

Natural Better No

sweep of hydrocarbons out of tubing

damage to the casing due to jetting at the SSD disposed of through normal flowline
Copyright 2001 SIEP B.V

Hydrocarbons
S h e l l EP Le Le a r n i n g

1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 16

Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

S h e l l EP Le Le a r n i n g

1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 17

Copyright 2001 SIEP B.V

Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

S h e l l EP Le Le a r n i n g

1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 18

Copyright 2001 SIEP B.V

Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

Permanent downhole gauge

S h e l l EP Le Le a r n i n g

1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 19

Copyright 2001 SIEP B.V

Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

S h e l l EP Le Le a r n i n g

1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 20

Copyright 2001 SIEP B.V

Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

S h e l l EP Le Le a r n i n g

1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 21

Copyright 2001 SIEP B.V

Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

S h e l l EP Le Le a r n i n g

1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 22

Copyright 2001 SIEP B.V

Copyright 2001 SIEP B.V

Xmas Trees

S h e l l EP Le Le a r n i n g

Xmas Trees

S h e l l EP Le Le a r n i n g

1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 23

Copyright 2001 SIEP B.V

Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

S h e l l EP Le Le a r n i n g

1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 24

Copyright 2001 SIEP B.V

Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

S h e l l EP Le Le a r n i n g

1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 25

Copyright 2001 SIEP B.V

Copyright 2001 SIEP B.V