Agenda
The Work Breakdown Structure(WBS)
What it is Why it is important Different Ways to Create a WBS The pros and cons of different types of WBS Guidelines and Rules of Thumb
Project Objectives
Task Control
Recycle
Project Organization
Risk Management
The WBS (graphically) organizes and defines the total scope of the project
The WBS is the essence of the Project Management Method
What is a WBS?
It does not need to be in org chart form
It can be in ordered outline form, but
Graphical representations sometimes help people better visualize how things fit together. Graphical representations allow you to more easily transition toScheduling of the project
2. No need to go to lowest possible level, but have about the same level of effort for each task at the lowest level
Deliverable
3. Each task must have a deliverable 4. Each task must have clear start & end dates 5. Different projects have different WBS
WBS Types
Components, or parts of the product Chronological, or Sequential Functional disciplines Organizational units Geographical areas Cost accounts Configuration characteristics Deliverables Purpose or functions Subsystems of the product or project Schedule milestones Phases
Vehicle Level
Platform WBS
Systems Level
Chassis
Body
Electrical
Power Train
Subsystems Level
Exhaust
Fuel Delivery
Engine Mgmnt
Fuel Storage
Subsystems Level
PCV
Fuel System
ECR
Component Level
IACV
Injector
Press. Reg.
Parts Level
Contact
Nozzle
O-Ring
Pintle
Housing
WBS Example
HP Compaq - Laptop Display
Design Laptop Display
Power Supply
Define Architecture
Controller
Mechanicals
LCD (Sharp)
Panel
Housing
Compare/Contrast
Project: Cruise Ship Modification
Chronological
Chronological WBS
Feasibility Study
Scope of Work
Design
Dry Dock
Marketing
Project Management
Functional WBS
Functional
Marine
Engineering
Hotel
Shipyard
Human Resources
Project Management
Study
Concept
Prototype
Qualification
Pilot
Production
Project Management
Functional
Typical Project
Sales
Product Engineering
Purchasing
Quality Control
Job Shop
Manufacturing Department
Project Management
Communications and team building between upstream and downstream team members is actually better since they all
meet together at team meetings and at stage gates.
Engineering
Concept design
Preparatory work
Detailed design
Production release
Production
Support
Requirements
Customer requirement
Design requirements
Product specs.
Product handbooks
Acceptance
Customer acceptance
Production
Production estimates
Advice to design
Production planning
Production
Project Management
(Gates)
1A
1B
2A
2B
3A
3B
13
Brochures
Margin
Stock Profile
Support
Training
Brochure Production
Advertising
Training
DBT System
Contract
Administration
Project Admin.
Construction Supervision
Client Costs
Drafting Services
Contract Services
Bulk Materials
Engineered Materials
Client Staff Support Services Exp./Travel Contracts Other Engineering Disciplines Drafting Disciplines Total by Contract
Bulk Class.
Equipment Class.
Chevron(2)
(Re-organized to Promote Team Communications)
CWBS
Equipment & Material Administration
Construction
Home Office
Field
Design Services
Procurement Services
Direct Labor
Subcontract Fee P.M. Expenses Other Const. Supv. Mobilisation Demobil. Site Facilities Other Engineering Services Drafting Services Subcontract Design Bulk Materials Engineered Materials
Engineering Disciplines
Drafting Disciplines
Design by Subcontract
Buyers Inspection
Bulk Class.
Equipment Class.
Documents
Develop Migration Plan Class for Local Cust. Class for Off-site Cust. ID HORO E-Mail Cust. Schedule Cust for Training
Outline Format
4.2 Migrate Novell PROFS Customers 4.2.1 Notify Cust. for Training Class 4.2.2 Admin MAILworks accounts 4.2.3 Train Customer 4.2.4 Change Cust. to MAILworks 4.3 Migrate Offsite PROFS Customers 4.3.1 Notify Cust. for Training Class 4.3.2 Admin MAILworks accounts 4.3.3 Train Customer 4.3.4 Change Cust. to MAILworks 4.4 Migrate Remaining PROFS Customers 4.4.1 Notify Cust. for Training Class 4.4.2 Admin MAILworks accounts 4.4.3 Train Customer 4.4.4 Change Cust. to MAILworks 5. Migrate Other E-mail Users 5.1 Notify Cust for Training Class 5.2 Admin MAILworks accounts 5.3 Train Customer 5.4 Change Cust to MAILworks
1. Planning 1.1 Dev. Migration Plan 1.2 Dev. Training Class for Local Cust 1.3 Dev. Training Class for Off-site Cust 1.4 ID & Locate HORO e-mail customers 1.5 Schedule Customers for Training
2. Server Preparation 2.1 Setup & Configure MAILworks Server 2.2 Setup/ Configure/ Test Dialup Access 3. Documentation 3.1 Create Training Reference Material 3.2 Review/ Comment of Ref Material 3.3 Produce Final Documentation 4. Migrate PROFS Customers 4.1 Migrate PCSA PROFS Customers 4.1.1 Notify Cust. for Training Class 4.1.2 Admin MAILworks accounts 4.1.3 Train Customer 4.1.4 Change Cust. to MAILworks
Developing a WBS-Guidelines
1. The WBS and work description should be easy to understand. 2. No attempt should be made to subdivide work arbitrarily to the lowest possible level. Lowest level of work should not end up having a ridiculous cost in comparison to other efforts. 3. The WBS can act as a list of discrete, measurable, tangible milestones so that everyone will know when the milestones are achieved. 4. Tasks should have clearly defined start and end dates; it should be possible to construct a schedule or a network for a WBS task. 5. No effort should be made to extend the WBS to the same number of levels for all projects.
18
Think ahead to why you want to develop a WBS-what is this leading into?
Global Business Management Consultants, LLClwww.bmc-online.comlrandall@bmc-online.coml+832.298.4380
19
So think ahead, when developing your WBS to other steps in the Project Management Method.
21
22
23
24
25
WBS Workshop-In Groups (15 Minutes) Develop a draft WBS for your Major Project, either:
Chronological Functional
Diagram the Draft WBS(org chart or outline form) Explain the project and WBS to the class.
26
Recycle
Project Organization
Accountability
Risk Management
Procurement
Construction of Equipment
Testing
Collection of Samples
Project Management
START HERE
10
11 12
13
14
15
16 17 18
CLIENT
Consultant
Procure. T. Johns Task 1 J. Audibert Task 2 C. Depasse Task 3 Merguerian Task 4 M. Irish
Test S. Randall Task 9 Roytberg Task 10 R. Gibson Task 11 Suet Fong Task 12 M. Ozbilen
Project Organization Example Allen Bradley (One-to-One Relationship to the Work Breakdown)
Project Manager (PM) WBS Level 1 Definition (MM) Feasibility (PM) Acceptance (CD) Program Development (PM) Program Launch (PM) Sales (PM)
Brochures 2 (CM)
Margin (PM)
Support (MM)
Training (TD)
PM MM TD CM MD CD
Product Manager Marketing Manager Training Department Communications Marketing Manufacturing Division Country Director
Advertising
(MM)
Training TD)
29
30
Division Manager
Project Manager
Dept. Manager
Team Member
RAW MATERIAL PROCUREMENT Prepare Bill of Material Contact Suppliers Visit Suppliers Prepare Purchase Order Authorize Expenditure Place Purchase Order l l l l l l
R A C I
= = = =
Page 65
The RASCI
Term R Responsible Definition Who is responsible for actually doing it? The Doer
A Accountable S Support
C Consulted I Informed (Kept)
Who has authority to approve or disapprove it? Who makes sure that its getting done. Who will help the person responsible?
Who has needed input about the task? Keep in the loop Who needs to be kept informed about the task? Keep in the picture
34