Table-5.1.1 Activity data, Precedence relations and Resource data Activity Immediate Normal Crash c t c/t Resources* Predecessor Duration Cost Duration Cost labour carpenter (weeks) (units) (weeks) (units) A --- 2 130 1 180 50 1 50 2 1 B A 4 240 2 380 140 2 70 4 2 C A 4 220 2 260 40 2 20 4 2 D A 3 260 1 340 80 2 40 3 1 E B 4 350 1 430 80 3 27 4 1 F C 7 200 4 270 70 3 23 7 4 G C 2 230 1 280 50 1 50 2 1 H D 5 350 3 460 110 2 55 5 3 J F 2 430 1 490 60 1 60 2 1 K H 5 160 3 200 40 2 20 5 3 L J 2 400 1 670 270 1 270 2 1 M E,G,L 3 330 2 510 180 1 180 3 2 N K,M 2 180 1 230 50 1 50 2 1 * A maximum value of 4 and 6 has been specified for both of the resource types R-1 and R-2 respectively during entire project. 5.1 (b) PROJECT NETWORK: the project network is shown in Figure5.1.1 which also show the network on time scale. 0 1 3 4 2 5 7 8 9 6 10 A B C D E F J L G H K M N (a) Precedence relationship of network 0 1 3 5 7 8 9 10 2 4 6 A B C D E F H G J K L M N 2 3 2 5 2 5 7 2 3 4 2 4 4 (b) Time Scale Version of Network (Normal duration = 22 weeks, Critical Path A-C-F-J-L-M-N) Fig. 5.1.1: Activity on Arrow Network for Project 5.1.2 Resource Distribution before contraction of network (for normal project duration) Resource R1-before leveling (a) Histogram for Resources (overallocation) Resource R2-before leveling (b) Histogram for Resource- R2 (overallocation) Fig. 5.1.2 Resource Distribution for normal project duration 0 1 2 3 4 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 P R O J E C T
R E S O U R C E PROJECT DURATION OVER ALLOCATED RESOURCE 0 2 4 6 8 10 12 14 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 P R O J E C T
R E S O U R C E PROJECT DURATION OVER ALLOCATION RESOURCE 5.1.3 Resource Allocation before contraction of network: Project duration has not extended in resolving resource constraints. Resource histogram has been shown after resource leveling in Figure5.1.3. R1-after leveling (a) Histogram for Resource R-1 (overallocation has been resolved) R2-after leveling (b) Histogram for Resource R-2 (overallocation has been resolved) Fig. 5.1.3 Resource Allocation using Ms-Project software 0 1 2 3 4 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 P R O J E C T
R E S O U R C E PROJECT DURATION OVER ALLOCATED RESOURCE 0 1 2 3 4 5 6 7 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 P R O J E C T
R E S O U R C E PROJECT DURATUION OVER ALLOCATION RESOURCE 5.1.4 Details of Contraction of Project Network: Table 5.1.2 lists the various activities crashed during contraction of the project. Table 5.1.2 Steps in contraction of project (contraction by one week in each step) Activity crashed Weeks saved Project duration (weeks) Direct cost (units) Indirect cost (units) Total cost (units) Nil 0 22 3480 2200 5680 C 1 21 3500 2100 5600 C 1 20 3520 2000 5520 F 1 19 3543 1900 5443 F 1 18 3567 1800 5367 F 1 17 3590 1700 5290 N 1 16 3640 1600 5240 A 1 15 3690 1500 5190 J and K 1 14 3770 1400 5170 K and L 1 13 4060 1300 5360 D and M 1 12 4280 1200 5480 5.1.5 Project Network after crashing of activities: 0 1 3 5 7 8 9 10 2 4 6 A B C D E F H G J K L M N 1 2 1 3 1 5 4 1 2 4 1 4 2 Fig.5.1.4 Contracted Project Network 5.1.6 TIME Cost Curve: Fig. 5.1.5 Time Cost variation during contraction of Project 57 56 55 54 54 53 52 52 52 54 55 0 10 20 30 40 50 60 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 P R O J E C T
C O S T H u n d r e d s PROJECT DURATION (weeks) Direct cost Indirect cost Total cost 5.1.7 Resource Distribution after contraction of network (project duration=12 days) Resource R1-before leveling (a) Histogram for Resources (overallocation) Resource R2-before leveling (b) Histogram for Resource- R2 (overallocation) Fig. 5.1.6 Resource Distribution for normal project duration 0 2 4 6 8 1 2 3 4 5 6 7 8 9 10 11 12 P R O J E C T
R E S O U R C E PROJECT DURATION OVER ALLOCATION RESOURCE 0 5 10 15 1 2 3 4 5 6 7 8 9 10 11 12 P R O J E C T
R E S O U R C E PROJECT DURATION OVER ALLOCATION RESOURCE 5.1.8 Resource Allocation before contraction of network (Project duration has been extended to 17 weeks in resolving resource constraints) R1-after leveling (a) Histogram for Resource R-1 (overallocation has been resolved) R2-after leveling (b) Histogram for Resource R-2 (overallocation has been resolved) Fig. 5.1.7 Resource Allocation using Ms-Project software 0 1 2 3 4 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 P R O J E C T
R E S O U R C E PROJECT DURATION OVER ALLOCATED RESOURCE 0 1 2 3 4 5 6 7 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 P R O J E C T
R E S O U R C E PROJECT DURATION OVER ALLOCATION RESOURCE