put on safety hat always when you are on rig site.



2

Hold safety meeting before any special operation.



3

Keep working place clean and tidy, don

t block the walkway.



4

Put on safety belt when you are working on a high place , and have your tools
secured.
!

!ive standard signal and gesture when direct a crane or forklift.


" # $% &' ()
"

#se safety guide line while loading or unloading big si$e or heavy loads.
*$+ ,- . ! /
%

&heck the sling or wire rope line before use.


0 +# &'
'

(ll handrail should be in place, in good shape and tighten.


12 3 45 6789
)

&heck the eye wash table and *&+( each shift change.
:;< =>?@ABC
1,, *et a sign board and inform the driller when you do something repairing.

D EF GH
11, Hot work and cold work need to inform the foreman on duty, only can start the
work after got the foreman

s permission.

I J+KL D G < MNOPQ RSTU V
12, (ll flammable and harmful material should be stored separately and identified
clearly.

12WX@2YZ[ \ ]^ _
1-, wear ear plug while working in or around generator house.

NL` +ab c
14, check the fire e.tinguisher monthly and recorded.

de JC

1, shut down the engine and cut off the power first should the engine house on fire.

fgL`hJ iKL j k
1", (ll e/uipment, warehouse, living room should be grounded.

12 `l` ;m
1%, 0ach sling and wire rope should have an uni/ue identified mark on it, and
checked monthly.

dfn# 2o - de
1', 1ull o.ygen bottles should be stored separately with empty ones, and be shield.

\ ]^p q
1), 2o obstacle around escape line and the touchdown place should be clear and
soft.

rs t U2uv.wm x y .
2,, (ll personal include the third party should be know the location of safe brief area.
(nd how to react should emergency situation appears.

12z {|} ~ -5 N
21, 3e have two safe brief area. one at the entrance of rig site, another at the e.it.

2 f N f N

22, +e ware of H2* , we are drilling through H2* bearing formation.


H2*

H2*
m
2-, 3e have H2* and flammable gas detecting system on rigsite. 4he sensor are
located at shale shake, cellar, wellhead, and rig floor.

2
H2*
@X ! N $ $@ ?

24, 3hen the H2* comes out of hole under 1,ppm, the amber light will be on but the
horn silence. 3hen the H2* goes more than 2,ppm, the warning horn will sound and
the amber light will be on at the same time.


H2*
N
1,ppm

H2*

2,ppm

2, 4he driller is authori$ed to shut in the well when situation indicates.
fg H 2
2", (ll personal on rigsite should go /uickly to the safe brief area up the windy when
H2* alarm sounds.

H2*
12z P
2%, (ll personal should report to toolpusher upon entere the rigsite

12z fg <
2', 3hen conduct fire drill the members on duty are divided into two groups, fire
team and back up team.

<z \ J @S
2), 5nce somewhere set on fire, find out the fire source and the reason, report to
foreman immediately, then take proper way to put out fire.

fgwJ i Jk@J M RS- -~ J
-,, 2ever use water to put out fire when power didn6t cut off.

kj U' J
-1, (ll personal should take training and get necessary certificated before taking the
7ob.
12z OI-
-2, 3e will conduct function test first after +5P set up. 4hen pressure test pipe rams,
annular, choke manifold, inner +5P, chock line and kill line separately.

C Si VU S $U$ $ $
$ \
--, 8nner +5P include inside +5P, full open valve, upper Kelly cock, and Kelly cock.

{| $ $~ 3
-4, 0ach valve in choke manifold should be labeled with its normal position.

- o - 5
-, Pressure test didn6t go more than 4 ob7ects each time.

fU
4


-", 0ach ob7ects no matter rams, annular, inner +5P, or H&9, plate valve must pass
high pressure:2,,psi; and low pressure:-,,psi; test.

df $U$ $ $

2,,psi
@
-,,psi

-%, 4he low pressure will hold stably for mins, the high pressure will hold stably for
1,mins.

\
1,
\
-', 3e use clean water to perform pressure testing.

'

-), ( pressure test chart will be needed with e.plaining on it and handed in foreman.

V\: M
4,, 3e need to set a plug in casing head in order to change the pipe rams.

N C
41, 4he pressure test table plays an important role, so we must keep it in good
condition always.

? *'

42, (ll plate valve are float seal, so after you close a valve, be sure back /uarter of
turn.

12 1 Sf8
1<4


4-, &heck the hydraulic control line fre/uently= no leaks in system.

! V ! y
44, 4he four>way control handle should be either in open or in close but in neutral. *o
people can easily know the +5P6s working situation.

5G ) p 5 p 5 p5 zf>4
U
+5P
-

4, 3hat is the different between H2* drill and +5P drill?
H2*

+5P
-N
4", 4here are two mainly different, 1irst the signal, H2* giving off amber light and
sound, but the +5P using rig air horn

second, people going to safe briefarea when


H2*, but to mud mi.ing tank when +5P.

2 i
H2*
'
+5P
&' ?
z 5
H2*
<*\z
+5P
<*\z
,
4%, How long do we will arrange a self safety inspection?

Vf
4', 3e will hold a self safety inspection about a month.

* de f
4), !as cylinders should be stored in upright position.

]^
,, 8solate o.ygen cylinder from acetylene cylinder in store area by "." meters.

]^ N
"

"


1, (@@ gas cylinders should be marked, secured, and shield.

12 2 $ 9$
2, power cables to trailers from light plant suspended or otherwise protected from
vehicle traffic.

L`P `- + !
-, protective covers on all lights.

o 2
4, (+& fire e.tinguisher in or outside each trailer.

` 2 - JCZ
, smoke alarm present and functioning in each room.

` 2 C
", electrical 7unction bo.es identified and kept in closed position.

; 2
%, electrical outlet labeled, voltage identified.

k
', electrical cords, plugs, receptacles etc in good condition.

12 $ $ y " "
), (ll pressure gauges in good condition and reliable.

12- $
",, fans and belts guarded.

$ 2 #
"1, (ll connections of pressure hose safely secured.

- ;5
"2, 1loors and e/uipment free of oil or grease

?@ y
"-, Aoghouse housekeeping acceptable, no accumulations that present a ha$ard.

<` s y .
"4, 2oise ha$ard sign in place= hearing protection provided and used by workers.

N2 -m~2 Y E c'z&' $ $
",BH8!H C5@4(!0>#*0 25 3(409Dsign posted in generator house.

`
B
'
D
EF
"", 0mergency lighting should be installed in *&9 room


`
"%, 2on>conductive mats placed on floor in *&9 room.

`
"', &52 fire e.tinguisher available in *&9 room.

`
&52
JCZ

"), *hear blind<blind rams control guarded.

j $)2 #
%,, +5P elastomers stored in air conditioned room.
+5P
]^N `
%1, 3ear goggles,apron,and rubber glovers when adding materials into mud.

[ $ $ )
%2, Eotors on mud tank are e.plosion>proof,

- L-
%-, 4he +5P stack should be properly turnbuckled, and make it tighten and centered.

C ' &
%4, &ellar protected from workers falling into it.

z
%, C>door closed or chained when not in use.

* &' +'
%", 1loor openings covered when not in use.

?- &'
%%, walkways and work area unobstructed, and clean.

@ 2uv. %
%', Handles for Kelly cocks and stabbing valve in easily accessible place.

~ 3)@ ^NWP-m~ &
%), Ariller6s controls ade/uately labeled and guarded.

H ? E 2
',, swivel used on tugger line.


'1, ma.imum allowable casing pressure posted at remote chocke control panel.

o*Q
'2,(ll drill procedure posted on wall of doghouse.

12 !" N <`
'-,3orkers stand out of the way when rolling,loading,or unloading
pipe.

@ z #N V~R
'4,1ire hose not used for any other purpose than fighting
fires,drills,or testing.

$ J$ $ RU ' '

',Hand held power tools have auto>shutoff devices.

) L% 2 KL
'",pneumatic power tools are secured to the air line to prevent accidental
disconnection.

R 2 z (
'%, 2o welding or cutting on load handling tools or e/uipment.

&,-+ U V '
'', *uper sacks handling system certified and inspected regularly.

*(# ! V 8 8)
'), *afety instruction given to all personnel entering location.

-z V~*-+
),, 0mployees should know location of stretcher and blankets.

, @- N ) *
)1, (ll working surfaces higher than 4 feet have standard handrails.

*p
4
2 ( 3
)2, 3indsocks or streamers visible from anywhere on the location.

- .UP +/0 !
)-, 1lare ignition system available and in good condition.