Corporal Enterprise TENT in March

Below the plan-by 6, 64 percent


Corporate Enterprise Thermal Power Plants Nikola Tesla produced and distributed
to Electric Power System, 1.544.234.000 kWh of electricity in March 2012, which is 6,
64 % less than planned. If taking into consideration unproduced energy due to cold
and hot reserves, which amounts to 108.268.000 kWh, production plan would have
been realized to 99,91 percent. In this month we have recorded 19 halts, 10 of which
in TENT A, 5 in TENT B, 3 in TEK and one in TE Morava.
Thermal Power Plant A produced and distributed to Electric Power System
796.707.000 kWh of electricity, which is 7, 36% less than planned. If taking into
consideration unproduced energy due to cold and hot reserves, which amounts to
29.724.000 kWh kWh, production plan would have been realized to 96,1 percent.
Unit A-4 had a continuous production on the grid in this month, while first two Units
produced more electricity than planned for this month.
In the same period Thermal Power Plant B produced 596.592.000 kWh of electricity,
which is 2, 84% less than planned. If taking into consideration unproduced electricity
due to cold and hot reserves, which amounts to 8.500.000 kWh, production plan
would have been accomplished to 98,55 percent.
Thermal Power Plant Kolubara produced and distributed to the Electric Power
System 99.977.000 kWh of electricity, and realized the plan with 88,48%.
Suppressed electricity, due to cold reserves amounts to 49.376.000 kWh, with which
the plan would have been realized with 132,17%. In addition to the continuous
production of the Unit A3, Units A1 and A3 produced more electricity than planned for
this month.
Thermal Power plant Morava produced and distributed to the Electric Power
System 50.958.000 kWh of electricity, and realized the plan with 76,06%. With the
unproduced energy of 20.668.000 kWh, suppressed due to cold reserves, the plan
would have been realized with 106,9%.
Railway transport carried 2.819.027 tons of coal for TENT A, TENT B and TEK,
which is 19% more than planned. In TEM, 53.358 tons of coal have been transported
from underground mining and open pits, so the realization of the plan is 84,7 %.
The specific consumption of liquid fuels of Corporal Enterprise TENT is 18.5% lower
than the norm, which is 2.15 g / kWh.
The participation of the Corporal Enterprise "Thermal Power Plant Nikola Tesla" in
the total production of EPS is 41.7%, and in the production of all power plants in the
system 57.45%.
If we observe the production of the Corporal Enterprise "Thermal Power Plant Nikola
Tesla" in relation to the Public Enterprise "Electric Power Industry of Serbia", without
TE Kosovo the percentage is much higher and amounts to 48.9%, or 72.07%.
Prepared by: S. Markovic