input data
edge span =
300
Middle span =
300
cantilever span =
120
F.C =
200
L.L =
300
Fcu =
250
Fy =
3600
Fy =
2400
Equivalent Wall load =
k=
cm
cm
cm
kg/cm2
kg/cm2
kg/cm2
kg/cm2
kg/cm2
0 t/m2
calculation of loads
t min =
t min use=
o.w of slab=
D.L on slab =
Wu =
8.6
8.6
0.21429
0.41429
1.06
cm
cm
kg/cm2
t/m2
t/m2
0.954 m.t
0.954 m.t
0.795 m.t
0.795 m.t
Fy =
Fy =
Fy =
0.7632 m.t
0.0025
0.00216
7.55195
11.2 cm
14 cm
t for design =
14 cm
3600
2400
4000
m max =
m max =
m max =
d for design =
o.w of slab=
D.L on slab =
Wu =
12
0.34349
0.54349
1.24088
cm
t/m2
t/m2
t/m2
7.4550
0.00247
check on m 1(m=.0015)
check on m 2 (m=1.3m<.0031)
m used =
As =
0.00247
0.0031
0.0031
3.79422 cm 2
used
No of bars
5
5f
6.2125
0.00205
check on m 1(m=.0015)
check on m 2 (m=1.3m<.0031)
m used =
As =
0.00266
3.25815
0.00205
0.00266
used
No of bars
4
5f
5.9640
0.00196
check on m 1(m=.0015)
check on m 2 (m=1.3m<.0031)
0.00196
0.00255
m used =
As =
used
0.00255
3.12403
No of bars
5f
7.4550
0.00247
check on m 1(m=.0015)
check on m 2 (m=1.3m<.0031)
m used =
As =
0.0031
3.79422
0.00247
0.0031
used
No of bars
5
5f
6.2125
0.00205
check on m 1(m=.0015)
check on m 2 (m=1.3m<.0031)
m used =
As =
0.00266
3.25815
0.00205
0.00266
used
No of bars
4
5f
5.9640
0.00196
check on m 1(m=.0015)
check on m 2 (m=1.3m<.0031)
m used =
As =
0.00255
3.12403
0.00196
0.00255
used
No of bars
4
5f
0.0125
0.0214
0.0108
10
10
10
10
10
10
1000
600
125
200
300
250
3600
2400
cm
cm
cm
kg/cm2
kg/cm2
kg/cm2
kg/cm2
kg/cm2
0.5 t/m2
3m
calculation of loads
t min =
t min use=
o.w of beam=
D.L on beam =
Wu =
100.0 cm
100.0 cm
0.75 kg/cm2
1.325 t/m2
2.335 t/m2
Fy =
3600
m max =
0.0125
Fy =
Fy =
0.005
0.00431
14.5556
73.1 cm
78 cm
t for design =
d for design =
o.w of beam=
D.L on beam =
Wu =
5.6475 m.t
7.53 m.t
100
95
0.75
1.45
2.51
cm
cm
t/m2
t/m2
t/m2
2400
4000
m max =
m max =
0.0214
0.0108
2.3176
0.00075
check on m 1(m=.0015)
check on m 2 (m=1.3m<.0031)
m used =
As =
0.0015
0.001
0.0015
14.25 cm 2
used
No of bars
3
3f
18
3
3f
18
0.6258
0.0002
check on m 1(m=.0015)
check on m 2 (m=1.3m<.0031)
m used =
As =
0.0015
14.25
0.0015
0.0003
used
No of bars
0.2173
0.00007
check on m 1(m=.0015)
check on m 2 (m=1.3m<.0031)
0.0015
9E-05
m used =
As =
0.0015
14.25
used
No of bars
3
3f
18
2.3176
0.00075
check on m 1(m=.0015)
check on m 2 (m=1.3m<.0031)
m used =
As =
0.0015
14.25
0.0015
0.001
used
No of bars
3
3f
18
3
3f
18
0.6258
0.0002
check on m 1(m=.0015)
check on m 2 (m=1.3m<.0031)
m used =
As =
0.0015
14.25
0.0015
0.0003
used
No of bars
0.2173
0.00007
check on m 1(m=.0015)
0.0015
check on m 2 (m=1.3m<.0031)
m used =
As =
0.0015
14.25
9E-05
used
No of bars
3
3f
18
10.04 t
3.52281 kg/cm2
9.68246 kg/cm2
qsu =
0 kg/cm2
Ast =
0 cm2
use 5#8/m
distance between strips =
fy for strips
=
10 cm
2400 kg/cm2
diameter of bars =
0
final diameter =
15.06 t
0m
0 cm
10
qu =
qcu =
5.28421 kg/cm2
9.68246 kg/cm2
qsu =
0 kg/cm2
Ast =
0 cm2
use 5#8/m
distance between strips =
fy for strips
=
10 cm
2400 kg/cm2
diameter of bars =
0
final diameter =
10
0 cm
0m
9.036 t
3.17053 kg/cm2
9.68246 kg/cm2
qsu =
0 kg/cm2
Ast =
0 cm2
use 5#8/m
distance between strips =
fy for strips
=
lets number of stirps / m
10 cm
2400 kg/cm2
=
10
diameter of bars =
0
final diameter =
0 cm
0m
313.75 t
110.088 kg/cm2
9.68246 kg/cm2
qsu =
105.246 kg/cm2
Ast =
15.1292 cm2
need steel
distance between strips =
fy for strips
=
lets number of stirps / m
7.5646
diameter of bars =
3.1043
final diameter =
1.135 m
10 cm
2400 kg/cm2
=
31.043 cm
10
1000 cm
200 kg/cm2
300 kg/cm2
Fcu =
250
Fy =
3600
Fy =
2400
wall load /m =
height of floor =
k=
0.7
b=
30.0
4m
tslab =
kg/cm2
L2 =
4m
w slab =
kg/cm2
r = (L1/L2)
no. of side
kg/cm2
PH =
0.667
0.5 t/m2
3m
(where k=m/mmax)
BE =
w ph=
0.5
3.0015
w be=
t/m2
2.25 t/m2
cm
calculation of loads
t min =
t min use=
o.w of beam=
D.L on beam =
Wu total =
100.0 cm
100.0 cm
0.75 kg/cm2
1.6875 t/m2
6.003 t/m2
For beam
Mu +ve = 75.0375 m.t
Mu -ve = 37.5188 m.t
0.00875
0.00754
Fy =
Fy =
Fy =
3600
2400
4000
m max =
m max =
m max =
0.0125
0.0214
0.0108
10 cm
1.125
t/m2
2 1 or 2
24.0332
for beam
d=
t=
102.0 cm
107 cm
t for design =
d for design =
o.w of beam=
D.L on beam =
Wu =
107
102
0.8026
1.7664
4.7679
cm
cm
t/m2
t/m2
t/m2
For beam
Mu +ve = 59.5993 m.t
Mu -ve = 29.7996 m.t
Out Put Data
5.7266
0.00188
check on m 1(m=.0015)
check on m 2 (m=1.3m<.0031)
m used =
0.0024
0.0019
0.0024
As =
24.974 cm 2
used
No of bars
5
5
18
5.7266
0.00188
check on m 1(m=.0015)
check on m 2 (m=1.3m<.0031)
m used =
As =
0.0024
24.974
0.0019
0.0024
used
No of bars
5
5f
18
7.017942
Qu =
qu =
qcu =
35.0897 t
11.4653 kg/cm2
9.68246 kg/cm2
qsu =
6.62408 kg/cm2
Ast =
0.95221 cm2
need steel
distance between strips =
fy for strips
=
lets number of stirps / m
0.4761
diameter of bars =
0.7788
10 cm
2400 kg/cm2
= =
10
final diameter =
Distance for used strips =
1.2635 m
7.7878 cm