Вы находитесь на странице: 1из 3

Substation Automation Products

India

PSSR-PRO-6xx-60
Prepared : Prepared date: Approved: Approved date: Lang: Revision
:
Page:
PB 04/01/2010 G V 14/05/09 E 01 1 (3)
Instruction to run the Patch File

Strictly for ABB internal use only.


Note: CAUTION: - Do not interrupt DC Power supply while updating the Patch file

Instruction

Before starting the installing procedure, make sure you are Local Administrator on the PC.
Connect the terminal to ground potential and use ESD wrist strap before touching any internal part of the Terminal.
If the Terminal is in service, isolate it from the network.
Read through below information before starting the upgrading.
Take the back up of Configuration and setting

Upload the configuration; signal Matrix and Parameter from the Relay.

Extract the file FL_Patch.zip (received via LOTUS Notes) on your hard disc

Equipment
Following equipment is needed:
PC computer with network card
A crossed Ethernet cable (with coloured ends)

1. Settings of the PC
Set the IP address
Select Properties on the icon My Network Places.
Select Local Area Connection and then select Properties.
Select Internet Protocol (TCP/IP) and then Properties. Before you change the IP address remember your present
setting.
Set:
IP adress: 10.1.150.2
Subnet mask 255 255 255 0


Log-off and restart the PC. This is to be safe that the settings to the network card has take place.

2. Prepare the IED670 terminal.
For safety reason, block the trip during this upgrade.

Substation Automation Products
India

PSSR-PRO-6xx-60
Prepared : Prepared date: Approved: Approved date: Lang: Revision
:
Page:
PB 04/01/2010 G V 14/05/09 E 01 2 (3)
Instruction to run the Patch File

Strictly for ABB internal use only.



3. IP-Address
Check through the HMI under
Settings
General settings
Communication
TCP-IP configuration
Front port
that the terminal has the default IP-address 10.1.150.3 and the IP-Mask 255.255.255.0. If the terminal has any other
IP-Address and the IP-Mask change it to default addresses as above.

4. Connect the cables and start the communication between the PC and the IED670 terminal.
On the front side of the IED670 there is a RJ-45 connector for Ethernet, connect this to the PC.
Power up the IED670,.
Start a Command Prompt (= ms-dos prompt), from the windows start menu
Start->Programs->Accessories->Command Prompt
When the IED670 is up and running, enter "ping 10.1.150.3" at the prompt.
(The IP address of the IED670 must be 10.1.150.3.)
Check that the communication between the terminal and the PC works properly, then close this window.
Following should be observed on the window.


Substation Automation Products
India

PSSR-PRO-6xx-60
Prepared : Prepared date: Approved: Approved date: Lang: Revision
:
Page:
PB 04/01/2010 G V 14/05/09 E 01 3 (3)
Instruction to run the Patch File

Strictly for ABB internal use only.


4. Download Patch

Double click on the file PUTAPPL.BAT

The download of the new software starts. You will see this window. Check in this window that there is no error while
downloading the files and check all the files are transferred. Transfer complete will appear as shown below. This takes
few seconds , wait up to Press any key to continue will appear in the window. Then press any key




Now Switch OFF and Switch ON (restart) the relay wait for appr. 4 minutes to get the terminal in Ready mode,