The lifting and circulating head must have the retraction bolts attached to the snap ring before being installed on the last joint.
The snap ring must be tested before running the 30 pipe to ensure it flexes properly with the retraction bolts.
When running the last joint of 30 pipe ensure that the guide pin is oriented correctly with the riser pipe flow line outlet. Note that if the pin slot
orientation is not right the consequence will be cutting out the flow line outlet from the riser and rewelding. This would be a time and cost wasting
process. Double check before landing the last joint.
Ensure that the 30 pipe is correctly centered both before and after cementing.