DATA:

Diameter of pile= 300 mm


f
ck
= 30
N/mm
2
f
y
= 415
N/mm
2
Cover= 40 mm
Depth= 6000 mm
Live load= 1617.2 KN
LOAD CALCULATION:
Self weight of pile=(*d
2
*l*24)/4
= 10.1736 KN
Total load= D.L+L.L
= 1627.374 KN
Load including impact factor=1.1*T.L
= 1790.111 KN
Service load on pile=T.L/4
= 406.8434 KN
Design load= serviceload *1.5
= 610.2651 KN
LONGITUCINAL REINFORCEMENT:
P
u
= 0.4f
ck
*A
g
+(0.67f
y
-0.4f
ck
)A
sc
A
sc
= -892.8205 (Area never be negative)
minimum reinforcement=0.0125*area of cross section
A
sc
= 883.125
mm
2
dia of bar= 16 mm
no of bars = 4.394531
therfore provide 5 nos
LATERAL REINFORCEMENT(ties):
Dia of rod= 10 mm
volume of one tie= 69080 mm
3
if pitch of the tie is p
the volume of pile per pitch length=.2%area of cross section *p
= 488.8889 mm
maximum permissible pitch= D/2= 150 mm
Provide 10mm diameter bars ties at 150mm centres.
LATERAL REINFORCEMENT NEAR PILE HEAD:
spiral reinforcement is provided in the core of the pile head is
DESIGN OF PILE
3D= 900 mm
volume of the spiral per length=0.6 %of area of cross section
= 423.9 mm
3
dia of rod= 10 mm
ast of rod= 78.5 mm
2
circumference= 180
if the pitch of spiral diameter of spiral is
p=cicumference of spiral*Ast of rod /volume of spiral
p= circumference*A
s
/volume of spiral
p= 33.33 mm
provide 10mm diameter rod spiral at a pitch of 30mmc/c for
a length 900mm near pile head
LATERAL REINFORCEMENT NEAR PILE END:
spiral reinforcement is provided in the core of the pile end is
3D= 900 mm
volume of spiral= 69080 mm
3
dia of rod= 10 mm
A
S
= 78.5
mm
2
if the pitch of spiral diameter of spiral is
p= volume/6%0f cross section
= 162.963 mm
provide 10mm diameter rod spiral at a pitch of 50mmc/c for
a length 900mm near pile end the spiral is enclosed inside of
the main reinforcement
SPACER AND LIFTING HOLES:
Provide spacer in pair of steel using 32mm dia bar spacer
at 3000mm centres Provide 32mm diameter holes at3000mm
from pile end