Вы находитесь на странице: 1из 13

1 NOKIA Actix User Trainning/Module2.PPT / 01.08.

2004 / NN
Working with Actix in practice
Module 2
2 NOKIA Actix User Trainning/Module2.PPT / 01.08.2004 / NN
Content

Module 1
Getting started
Configuring Actix
Learning Actix

Module 2
Working with Actix in
practice

Module 3
Practical exercises /
(Working with scanner and call trace
data)

Module 4
Advanced features
3 NOKIA Actix User Trainning/Module2.PPT / 01.08.2004 / NN
Working with Actix in Practice

Need for process / process presentation


Site Verification
Cluster verification
Network verifiaction
4 NOKIA Actix User Trainning/Module2.PPT / 01.08.2004 / NN
Pre-Launch Optimization

Pre-Launch Optimization is done when Network is built


and integrated, but there is no commercial traffic in it

In GSM coverage is an issue. In UMTS interferance is


critical

Realiability of equipement migh not be as good as in


GSM
5 NOKIA Actix User Trainning/Module2.PPT / 01.08.2004 / NN
Standard process
SITE
VERIFICATION
CLUSTER
VERIFICATION
NETWORK
VERIFICATION
Efficiency and accuracy of analysis
Standard docuentation ! "i# aount of data to "e analy$ed
6 NOKIA Actix User Trainning/Module2.PPT / 01.08.2004 / NN
Global settings
Actix MainUser is in charge of defining:
Thresholds for map plots
Templates for measurement report forms
Many people in different regions using the same tool.
Process is needed
7 NOKIA Actix User Trainning/Module2.PPT / 01.08.2004 / NN
Site Verification (1)

Both scanner and tracer


measurements

Voice call is suitable to perform the


verification

Ec/Io should be in the range [-2 ;


-4]
Cross-feeders
external interference
SHO functionality
8 NOKIA Actix User Trainning/Module2.PPT / 01.08.2004 / NN
Site Verification (2)

Site should be the only one on air in the network

If not then at least only intra-site adjacences should be


defined in order to prevent the phone to perform handover
to other sites
9 NOKIA Actix User Trainning/Module2.PPT / 01.08.2004 / NN
Site Verification (3)
Elements to be displayed on the map:
Scanner

RSCP per each SC


RSCP best server

Dominance plot

Ec/Io plot (interferance should be very low if only one site is on air)
Tracer

Display events on the measurement route (SHO, Drop call etc)

RSCP best server

Ec/Io plot

UE TX power
10 NOKIA Actix User Trainning/Module2.PPT / 01.08.2004 / NN
Cluster Verification (1)

Both scanner and tracer


measurements

Data call (high throughtput UL and


DL) to check performance

Cluster is 10 sites more or less

Critical issues are:


Pilot Pollution
Sectors having no dominance
Neighbour definition check
11 NOKIA Actix User Trainning/Module2.PPT / 01.08.2004 / NN
Cluster Verification (2)
Elements to be displayed on the map:
Scanner

RSCP best server

Dominance plot

Ec/Io plot (this should not be worse than -9 if there is no traffic in the NW
Tracer

Display events on the measurement route (SHO, Drop call etc)

RSCP best server

Ec/Io plot

UE TX power
12 NOKIA Actix User Trainning/Module2.PPT / 01.08.2004 / NN
Cluster Verification (3)

When pilot pollution is detected documentation about overshooting


SC needs to be provided
RSCP of overshooting SC
Detailed plot of Ec/Io of polluted area

Same issue is for lack of dominance


13 NOKIA Actix User Trainning/Module2.PPT / 01.08.2004 / NN
Network Verification

Final stage

Problem should be fixed in the


two previous stages

Many measurement routes


which can be combined by
superstreaming