Вы находитесь на странице: 1из 5

BKW CALCULATION FOR DIFFERENT PUMP

Description

1
2
3
4
5
6
7
8

DM Water Pump
Potable water pump
DM feed pump
HVAC make up pump
Service water pump
CT make up pump
softner feed pump
Effluent Transfer Pump

No. of Pump

2x100%
2x100%
2x100%
2x100%
2x100%
3x100%
2x100%
2x100%

HPBFP
MPBFP
BFP-Aux.Boiler
2w+1s
BFP-HRSG(at 1.2 ata)
2w+1s
BFP-HRSG (at 7.6 ata)
DM Transfer Pump
3x50%
DM Transfer Pump
3x50%
DM Transfer Pump
4x33.33%
DM Booster Pump-HRSG-1
2x100%
DM Booster Pump-HRSG-2
2x100%
DM Booster Pump-HRSG-3
2x100%
DM Regeneration Pump
2x100%
To Refinery Pump
1x100%
To Boiler Fill, Pump
1x100
Effluent Transfer Pump
3x100%
Return Condensate, Pump
3x50%
CEP, for condenser
2x100%
CEP, for dump condenser
2x100%
DMCW, Pump
3x50%
SSF, Pump
2x100%
CW, Pump
3x25%
N2 unloading Pump
2x100%
Blowdown Cond. Tranf. Pump for
3x50%
Aux. Boiler 1 & 2

Flow per
Pump(m3/hr)

Head
(Kg/cm2)

Sp. Gr.

Pump Eff. BKW required

20
5
15
16
5
90
30
36

1.8
4.2
0.8
4
4.4
2.6
2
2

1
1
1
1
1
1
1
1

0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6

109.4
40.54
72
48
48
350
350
240
45
45
45
15
30
50
90
200
6000
30
220
850
6000
25

71.913
22.946
77.498
77.498
77.498
8.5
14.5
14.5
5.0
5.0
5.0
3.0
4.0
4.5
2.0
2.0
6.0
3.5
3.5
3.2
6.0
11.2

0.932
0.932
0.95511
0.95511
0.903342
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

0.726
0.588
0.63
0.65
0.65
0.7
0.7
0.7
0.5
0.5
0.5
0.7
0.7
0.7
0.7
0.7
0.92
0.7
0.7
0.85
0.92
0.7

25

3.0

0.7

15% margin
on BKW

1.64
0.95
0.55
2.91
1.00
10.63
2.73
3.27

1.88
1.10
0.63
3.34
1.15
12.22
3.13
3.76

295.29
43.11
241.35
155.95
155.95
115.81
197.56
135.47
12.26
12.26
12.26
1.75
4.67
8.76
7.01
15.57
1066.30
4.09
29.98
87.20
1066.30
10.93

339.59
49.58
277.56
179.34
179.34
133.18
227.20
155.79
14.10
14.10
14.10
2.01
5.37
10.07
8.06
17.91
1226.25
4.70
34.47
104.64
1226.25
12.57

2.92

3.36

Motor
Selected
(kW)

Note

2.20 Data has been provided to DM vendor for fee


1.50 Data has been provided to DM vendor for fee
0.75
3.70
1.50
15.00
3.70 Head not calculated exactly.
5.50

931.966

Blowdown Cond. Tranf. Pump for


2x100%
Individual HRSG
Condensate Transfer Pump in Fuel Area
2x100%
FO- unloading Pump
2x100%
HSD- Unloading Pump
2x100%
Drain Oil Pump
2x100%
HSD- Supply to GTG & EDG
3x100%
HSD- Supply to HRSG & Aux. Boiler 3x100%
FO-Aux. Boiler Firing Pump(AC)
3x100%
FO-Aux. Boiler Firing Pump(DC)
3x100%
Centrifuge
2x100%
Centrifuge Feed Pump
2x100%
Fuel Water Seperator-Pump
2x100%
Filteration Pump for SSF
2x100%
Drain Pump for CWP/H
2x100%

**

16

3.0

0.7

1.87

25
40
40
5
12
10
12
24
50
50
5
850
15

3.0
3.5
2.5
3.0
8.0
15.0
15.0
15.0

1
0.99
0.87
0.99
0.87
0.87
0.99
0.99

0.7
0.5
0.5
0.5
0.5
0.5
0.5
0.5

2.92
7.55
4.74
0.81
4.55
7.11
9.71
19.42

5.0
3.0
3.2
1.5

0.87
0.99
1
1

0.5
0.5
0.85
0.7

11.85
0.81
87.2000
0.8759

2.15
3.36
8.69
5.45
0.93
5.23 **
8.18
11.17
22.34
18.5

Considering 40% increment on head and 50% as efficiency.

13.63
0.93
100.280
1.007

AIR CONDITIONING LOAD CALCULATION


Description
Control Room
Admin Building(Gr. FL.)
Admin Building(1st FL.)
DM plant PLC room

Length(m)
30
15
15
20

Weidth(m)
12
30
30
10

2
2
Height(m) Area(Ft ) Ft /tonne
3.5
3875.01
120
4
4843.76
180
4
4843.76
180
4
2152.78
120

AC Tonnes
32.3
26.9
26.9
17.9

Elect. Load (KW)


38.75
32.29
32.29
21.53
0.00

2x16.5
1x16.5+1x11
1x16.5+1x11
2x11

39.6
33
33
26.4

Ventilation System Load Calculation

Description
Control Room Blg. Gr. Fl.(MCC rm )
Control Room(Cable Spreader Rm )
Store
Workshop
F/O Pump House
Chemical Lab
F/O Pump House, MCC Room
DM Plant MCC Room
Local Switch House
CW Pump House

Length

Weidth

Height

30
30
40
15
50
10
10
20
20
50

12
12
20
15
10
10
6
10
20
20

5
3
8
8
6
5
5
5
5
12

No. of Air Volume to


Change
Handle
10
10
10
10
15
15
10
10
10
10

18000
10800
64000
18000
45000
7500
3000
10000
20000
120000

No. of Fan
4
2
10
3
10
3
2
4
4
10

Volume per
fan with 10%
margin
4950
5940
7040
6600
4950
2750
1650
2750
5500
13200

Head

BKW

30
30
15
15
15
15
30
30
30
15

0.622
0.746
0.442
0.415
0.311
0.173
0.207
0.346
0.691
0.829

BKW
with 15%
margin
0.715
0.858
0.509
0.477
0.358
0.199
0.238
0.397
0.795
0.954

Electrical Load Calculation for Fan and Blower

Description

Flow
( m3/hr)

FD Fan
ID Fan

132000
165000

Head
Efficiency
Developed
(%)
(mwc)
0.636
75
0.306
75

Calculated BKW
(kW)
305.086
183.345

lower
15% margin on
Calculated BKW
(kW)
350.85
210.85

Вам также может понравиться