Cooling Tower performance capability test was carried out jointly by
Station and CenPEEP (CC) on 16-17
th
July, 2013 of CT-1 & CT-2 of
NTPC Unchahar Thermal Power Plant.

The test was conducted at stable load conditions. Cooling tower flow
measurement was carried out using Ultrasonic Flow meter. The inlet air
wet bulb temperature measurement was carried out using a battery
operated psychrometer. The cold water temp measurement was carried
out in the CT outlet channel using a grid arrangement.

2.0 Tower Description

Cooling tower at NTPC - Unchahar is of M/S Gammon make Induced draft
counter flow type concrete splash bars. The tower is designed for rated
Cold Water temperature of 33 deg C with 14 cells in operation at full load
condition.

3.0 Water Distribution System

Hot cooling water outlet from Condenser of Unit#1&2 is supplied to cooling
tower using CT Pumps. Two CT Pumps each for tower 1&2 are being
used. Discharge of CT Pumps 1&2 are fed individually to two sides of CT
1 and that of CT Pumps 3&4 are fed individually to two sides of CT 2. Hot
water from these two common inlet header of cooling tower is distributed
in all the 14 risers (7 risers in either side) of CT 1&2 which supply hot
water to the cells in either sides of tower through the channel. Within each
cell a distribution network supplies the hot water to the concrete splash
bar through the nozzles. The cold water flows via gravity from the
collection basin of the tower to an open channel which in turn flows to a
common sump at the suction to the CW pumps.




2


4.0 Measurement set up

Circulating water flow Measurement

CW flow was measured at the CW inlet header to each risers of cooling
tower by the Ultrasonic Flow meter. The ID and thickness of riser was 700
mm and 6 mm respectively with 3 mm of internal lining and pipe material
was MS.


CW flow measurement using ultrasonic flow meter

Hot Water Temperature Measurement

Hot water temperature is measured at the CW inlet distribution header to
the cooling tower on the top of tower and average was taken for the
calculation purpose.

Cold Water Temperature Measurement

Grid measurement of Cold water temperature of the tower was done using
Thermocouples, inserted at different heights and different locations across
the width in the cold water channel. The thermocouple connections were
brought out and connected to a temperature read out outside for cold
water temperature measurement. Average temperatures of all such points
are taken for the purpose of calculation of cold water temperature.

3

Location of measurement of CW Temp

Inlet air Wet Bulb Temperature

A battery operated psychrometer is used for measuring Wet Bulb
Temperature. The measurement was taken about 1 meter from the air
intake and at two elevations above the ground. The measurement was
taken at different locations on both sides of the tower and the average
values of all the measurements are taken for calculation of Inlet air Wet
Bulb Temperature.

Fan Power Measurement

Fan Power Measurement was done using the offline power analyzer at the
individual switchgear. The average powers of the 14 fans which were in
service are taken for the purpose of calculation of the Fan Power.

Wind Velocity Measurement

Wind velocity measurement was carried out at a distance of about 30 m
from cell inlet on both sides of the tower using an anemometer.

5.0 Test Results (Test Report enclosed)

The average values of cold water, hot water and inlet air wet bulb
temperature measurements and CW flow measurements were used along
with the curves provided by the manufacturer (M/s Gammon) for deriving
the tower capability. Cooling tower capability was determined using the
performance curve method as specified in CTI ATC-105 part-II, Section 6,
document on Mechanical Draft Cooling Tower Performance Curve
Method.

In the Performance Curve method, the cold water temperature is read at
the test WBT on the three cooling ranges on each of the 90%, 100%, and
110% flows. This gives nine points and these nine points are used to
generate the first cross plot of cold water temperature vs cooling range.
Each of these plots represents the cold water temperature as a function of
cooling range and water flow rate.

4

A second cross plot of cold water temperature versus predicted water flow
rate is then generated from the three points read from the first cross plot at
the test cooling range.

The predicted water flow is obtained from the second cross plot
corresponding to the test cold water temperature.

Finally, capability and effectiveness are calculated using the following
formulae:

Capability = [Q
T
/Q
pred
] x [Cell
D
/ Cell
T
] x [P
D
/P
T
]
1/3
x 100

Where,
Cap = Tower capability, %
Q
T
= Measured water flow rate, M
3
/hr
Q
pred
= Predicted water Flow rate, M
3
/hr
Cell
D
= No. of cells as per design
Cell
T
= No.

of cells in operation during test
P
D
= Fan motor power design, KW
P
T
= Fan motor power measured, KW

Effectiveness = Range / (Range + Approach)

5.1 A summary of the design and performance test values are provided in table
given below:

Sr.
No.
Description Unit Design
Value
Test Value
CT - 1 CT - 2
1 No. of Cells No 14

14 14
2 Circulating water
flow rate
m
3
/hr 33000 33269 32816
3 Hot water temp. deg.C 42 44.1 44.1
4 Cold water temp. deg.C 33

36 35.89
5 Inlet air wet bulb
temp.
deg.C 28.5 28.60 29
6 Fan Motor
Power/Cell
Watt 75

64 60.8
7 Range deg.C 9

8.10 8.21
8 Exp cold water
temp
deg.C --- 32.88 33.17
9 Shortfall in CW
temp
deg.C ---- 3.12 2.72

5






5.2 The table containing the Fan Powers of individual cells and corresponding
fan blade angles are given below:

Cooling Tower 1&2 CT Fans Power
CT-1 Power CT-2 Power
CT Fan No
Power
(KW)
Fan Blade
Angle
(Deg)
CT
Fan
No Power (KW)
Fan Blade
Angle
(Deg)
1.1 72 17 3.1 60 18
1.2 63.8 17 3.2 63 17
1.3 61 18 3.3 64 18
1.4 60 8 3.4 62 17
1.5 68 17 3.5 58
17
1.6 67 17 3.6 61
17
1.7 59 19 3.7 62.8
17
2.1 56 17 4.1 57.5
17
2.2 57 17 4.2 72
17
2.3 72 17 4.3 63
17
2.4 73 17 4.4 57
17
2.5 59 17 4.5 58
17
2.6 67 17 4.6 58
17
2.7 62 17 4.7 55
17

5.3 Following are the test temperatures measurement of CT 1&2:

Temperatures Measurement of CT 1&2
CT-1 CT-2
WBT
Near
Risers DBT CWT Grid HWT
WBT
Near
Risers DBT CWT Grid HWT
28.8 35.5 35.3 44.1 28.6 34 35.6 44.1
29.5 36 35.4 28.6 34 35.5
29 34 36.9 29 34.5 36.1
29 34 36.6 28.7 34.5 36
28.8 34 35.4 28.8 34.5 35.8
28.2 34 35.3 29.4 34.5 36
28.3 34 35.2 29 34.5 35.9
28.8 35.5 35.3 29.4 33.5 36.3
28.5 35.5 37.1 28.8 33.5 35.6
10 Approach deg.C 4.5 7.40 6.89
11 Effectiveness % 66.67 52.26 54.37
12 Tower Capability % 100 69.44 71.47

6
28.3 35.5 37.3 28.5 33.5 35.5
28.2 35 35.5 28.6 34 35.8
28.2 35 35.6 28.8 34.2 36.3
28.5 35.2 35.8 29.2 34.5 36.4
29 35.5
35.7
29.8 35
35.9
37.8 35.6
Average
28.65 34.91 36.01 44.10 28.94 34.19 35.89 44.10


6.0 Observations

1. The tower capability was found to be 69.44 % and 71.47% of CT-1&2
respectively as compared to design value of 100 %. The estimated
Heat rate loss for tower 1 and 2 are approximately 19 Kcal/KWHr
and 17 Kcal/KWHr respectively
2. The cold water temperature at tower outlet for CT 1 & 2 was 36 deg
C & 35.89 deg C as against the expected value of 32.88 deg C &
33.17 deg C and thereby having a shortfall of 3.12 deg C & 2.72 deg
C respectively.
3. The CW flow to the tower measured with the Ultrasonic Flow meter for
CT 1 & 2 was 33269 m
3
/hr and 32816 m
3
/hr respectively as against
the design value of 33000 m
3
/hr.
4. It is observed that overall water distribution is very poor in both the
towers. It is observed that in CT 1.1 & 1.2 no water flow in major
portion of the cells. It is also observed that in CT 1.3, direct water is
falling in many locations.
5. Lots of damaged concrete splash bars have been observed in both the
cooling towers. Lot of Algae formation is observed in CT structure and
basin and on splash bars. Presently no chemical treatment is being
carried out in CW system of Stage I.



6. The average fan motor power for CT 1 & 2 was 64.00 KW and 60.80
KW respectively against the design value of 75 KW. Low fan power
indicates less air flow through the tower. It is observed that only four

7
fans i.e. CT Fan 1.1, 2.3, 2.4 & 4.2 were taking highest power of
72/73 KW which is close to design value.


7.0 Remarks/ Recommendations

1. Replacing of damaged Concrete splash bars and cleaning of
algae:

Station may carry out cleaning of algae and replacement of damaged
concrete splash bars in a fixed time-frame schedule to improve the
performance level of cooling tower. It is also suggested to carry out
proper chemical treatments of CW system to prevent algae formation.

2. Checking of nozzles and replacing damaged/missing nozzles:

Inspection of nozzles is to be carried out in a phased manner and
undertake replacement/replenishment as required in a fixed time-frame
schedule to improve the water distribution across the tower.

3. Optimization of Air Flow:

It is observed that only four fans i.e. CT Fan 1.1, 2.3, 2.4 & 4.2 were
taking highest power of 72/73 KW which is close to design value. But
the average Fan Power for CT 1 & 2 were 64 & 60.8 KW which is
low as compared to maximum value achieved. It is therefore
suggested that optimization of air flow in individual cells through cell
cleaning and fan blade angle adjustment is required to be carried out
to achieve maximum air flow through individual cells. This will improve
the heat transfer through the tower thus improving the tower capability
and reducing the Cold Water temperature shortfall.
The blade tip clearances of all the fans to be checked and appropriate
action may be taken to minimize the possible air recirculation across
the fan.

4. Cold water Basin cleaning:

Practice of cleaning of cold water basin is to be introduced and to be
carried out on opportunity.

8


5. Trimming of vegetation in the vicinity of Cooling Towers:

For better performance of Cooling Towers the surrounding area of the
tower should be properly maintained to enhance the air flow through
the tower. It was observed during the test that dense jungles/unwanted
plants has been grown to greater heights which are restricting the air
flow and hence contributing for poor performance of tower. It is
suggested that the jungle thus grown should be trimmed immediately
and may be maintained on sustainable basis for better performance of
Cooling Towers.

9

Vegetations grown near the tower

6. Cleaning of vegetations on the bank of cold water channel to CW Pumps:

It was also observed that the banks of cooling water channel are full of unwanted
grown vegetations. There is chances of entering of foreign material in CT pump
suction side and may cause the damage to the system. It is suggested to maintain
the vicinity of channel bank.


Vegetations grown in the vicinity of banks of channels