The 2.5-km long, four-lane dual carriageway viaduct is constructed using precast segments throughout. Steel forms with finely ribbed liners produce a regular textured finish to all structural elements. The flyover is designed for construction over the busy existing Mysore road with minimal interruption to traffic and commercial activities.
The 2.5-km long, four-lane dual carriageway viaduct is constructed using precast segments throughout. Steel forms with finely ribbed liners produce a regular textured finish to all structural elements. The flyover is designed for construction over the busy existing Mysore road with minimal interruption to traffic and commercial activities.
Авторское право:
Attribution Non-Commercial (BY-NC)
Доступные форматы
Скачайте в формате PDF, TXT или читайте онлайн в Scribd
The 2.5-km long, four-lane dual carriageway viaduct is constructed using precast segments throughout. Steel forms with finely ribbed liners produce a regular textured finish to all structural elements. The flyover is designed for construction over the busy existing Mysore road with minimal interruption to traffic and commercial activities.
Авторское право:
Attribution Non-Commercial (BY-NC)
Доступные форматы
Скачайте в формате PDF, TXT или читайте онлайн в Scribd
Larsen and Toubro Limited, India / ECC carriageway viaduct is constructed Construction Group using precast segments throughout. Steel forms with finely ribbed liners Services Provided produce a regular textured finish to all Design structural elements. Technical assistance The viaduct structures use precast Supervision of construction shell-type segments with curved soffit Dates supported on shaped piers, founded on large diameter bored piles in addition to 1996 - 1998 three precast down ramps and one Project Data precast up ramp.
A 2.5-km four-lane dual carriageway The viaduct/ramp bifurcation is an
viaduct integral part of the design philosophy
that permits the ramp to appear as 37-m spans evolving naturally from within the main Four ramps viaduct and shows the consistent logic Construction cost: US$ 20 million that has been applied to also simplify construction. Main Features The flyover is designed for construction Proclaimed as a landmark structure, the over the busy existing Mysore road with Sirci Viaduct is the first of its type in minimal interruption to traffic and India that uses segmental bridge commercial activities. technology.