S12/12/12 Power Consumption & TOC with High Traffic
Huawei Technologies Co., Ltd. All rights reserved 26 th -May, 2009
BTS3900 S12/12/12 Power Consumption & TOC with High Traffic
2009-5-26 All Rights Reserved by Huawei 2
1. Target of the Phase III Testing
Before lock other cells: BTS3900 S12/12/12 Power Consumption & TOC with High Traffic
After lock other cells: BTS3900 S12/12/12 Power Consumption & TOC with High Traffic
2. Test Scenario
1> The target cells info
BTS3900 S12/12/12 Power Consumption & TOC with High Traffic
2009-5-26 All Rights Reserved by Huawei 3
The names of target cells (TRX of BCCH and TCH) which to be shutdown are as following: 4675_Selindung-8 4676_PangklBalam-8 4676_PangklBalam-9 1817L1_PklBalam2-5 1817L1_PklBalam2-6 4655_PangkalPng-1 5812_PngklPinang2-4 4674_KacangPdg-7 1816L1_KcngPdg2-4 4132_TuaTunu-4
The Traffic of other cells above will be moved to the Gabek Site cells. 4154_GabekGreenBTS(1800)-1 4154_GabekGreenBTS(1800)-2 4154_GabekGreenBTS(1800)-3 4154_GabekGreenBTS-1 4154_GabekGreenBTS-2 4154_GabekGreenBTS-3
2> Busy Hour in Gabek Site. 20:00 to 22:00
3. Test steps
1> Observe the traffic of the target cells and capture their statement before lock other cells around Gabek Site.
BTS3900 S12/12/12 Power Consumption & TOC with High Traffic
Use modify administrative state! to shutdown all the TRXs of cells above. Shutdown the uplink PC function! and downlink PC function! of all the six cells of site 4154 Shutdown the Load HO Allow! of all the six cells of site 4154 Modify the TCH traffic busy threshold (%)! and AMR TCH/H prior load threshold! of all the six cells of site 4154, the first parameter is change to90!, the second parameter is change to89! Modify the RXLEV_ACCESS_MIN! to0!
3> Observe the traffic of the target cells and capture their statement again, make the comparison to prove other cells! traffic already move to Gabek Site.
BTS3900 S12/12/12 Power Consumption & TOC with High Traffic
4> Activate the Power Control and DTX (Discontinue Transmission) (which will save the transmit power and total power consumption basing on the different distance between BTS and Subs, the duration of subs! calling) of all the six cells of Gabek site.
5> Test BTS3900 S12/12/12 power consumption (activate the Power Control and DTX), total TOC of each cell (900MHz, 1800MHz), also the corresponding captures for traffic.
Total Transmit Power (TOC) Site Name BTS Type Sector name Config dBm Watt Per TRX Static Output Power Setting in LMT (W) Traffic Time 25th-May-09, 1st S6 24.98 10 69% 21:04 2nd S6 31.36 10 90% 21:08 900MHz 3rd S6 27.07 10 71% 21:11 1st S6 10.75 10 5% 21:15 2nd S6 25.24 10 83% 21:18 Green BTS_1 1800MHz 3rd S6 14.92 10 34% 21:21
BTS3900 S12/12/12 Power Consumption & TOC with High Traffic
2009-5-26 All Rights Reserved by Huawei 7
Power consumption in Fluke Meter Site name BTS Type Config Volt Ampere Watt Time 25th-May-09 3900 12/12/12 53.5 25.3 1,353 21:04 3900 12/12/12 53.5 24.8 1,326 21:06 3900 12/12/12 53.5 24.7 1,321 21:08 3900 12/12/12 53.5 25.0 1,337 21:10 3900 12/12/12 53.5 24.6 1,316 21:12 Green BTS_1 3900 12/12/12 53.5 25.0 1,337 21:20
6> Deactivate the Power Control and DTX of all the six cells of Gabek site.
7> Test BTS3900 S12/12/12 power consumption (Deactivate the Power Control and DTX), Total TOC of each cell (900MHz, 1800MHz), also the corresponding captures for traffic.
Total Transmit Power (TOC) Site Name BTS Type Sector name Config dBm Watt Per TRX Static Output Power Setting in LMT (W) Traffic Time 25th-May-09, 1st S6 39.73 10 68% 21:34 2nd S6 55.35 10 97% 21:36 900MHz 3rd S6 47.39 10 89% 21:40 1st S6 15.95 10 13% 21:44 2nd S6 46.57 10 95% 21:47 Green BTS_1 1800MHz 3rd S6 28.58 10 38% 21:50
Power consumption in Fluke Meter Site name BTS Type Config Volt Ampere Watt Time 25th-May-09 3900 12/12/12 53.5 28.7 1,535 21:30 3900 12/12/12 53.5 29.0 1,551 21:32 3900 12/12/12 53.5 28.6 1,530 21:34 3900 12/12/12 53.5 29.2 1,562 21:36 3900 12/12/12 53.5 28.8 1,540 21:38 Green BTS_1 3900 12/12/12 53.5 30.0 1,605 21:40
BTS3900 S12/12/12 Power Consumption & TOC with High Traffic
2009-5-26 All Rights Reserved by Huawei 8
8> Activate Test Idle Timeslot! switch, to observe BTS3900 S12/12/12 Maximum TOC and Power Consumption.
Considering the different traffic in the different cell is caused by the different Subs distribution. Wed like to suggest use the !Test Idle Timeslot" switch to show the S12/12/12 100% traffic condition.
Detailed settings for the "Test Idle Timeslot# switch.
Shutdown the uplink PC function! and downlink PC function! of all the six cells of site 4154 Activate Test Idle Timeslot! to enable the all the TRXs of site 3900 with the full transmit power
Total Transmit Power (TOC) Site Name BTS Type Sector name Config dBm Watt Per TRX Static Output Power Setting in LMT (W) Traffic Equals to 100% Time 25th-May-09 900MHz 1st S6 61.3 10 100% 22:25 Green BTS_1 1800MHz 1st S6 60.5 10 100% 22:42
Power consumption in Fluke Meter Site name BTS Type Config Volt Ampere Watt Time 25th-May-09 3900 S12/12/12 53.5 36.6 1,958 22:44 Green BTS_1 3900 S12/12/12 53.5 35.3 1,888 22:48
BTS3900 S12/12/12 Power Consumption & TOC with High Traffic
2009-5-26 All Rights Reserved by Huawei 9
9> After testing, fall back the configuration to the normal and activate the other cells.
0 250 500 750 1,000 1,250 1,500 1,750 2,000 2,250 1 2 3 4 5 6 Power Consumption Before Shutdown Other Cells Power Consumption After Shutdown- Activate PC DTX Power Consumption After Shutdown- Deactivate PC DTX Power Consumption Activate "Test Idle Timeslot#
BTS3900 S12/12/12 Power Consumption & TOC with High Traffic
2009-5-26 All Rights Reserved by Huawei 10
4. Test Schedule
23 rd -May Upgrade BSC to solve SDCCH Congestion TR in Pangkal Pinang 24 th -May Pre-test the power consumption and TOC of BTS3900 high traffic 25 th -May Collect and analysis testing data 26 th -May~27 th -May XL team will go to Pangkal Pinang to test with Huawei Team