This document provides a risk assessment for fire fighting system work. It identifies several tasks and associated hazards, including transferring equipment, locating cranes, lifting, erecting scaffolding, working at heights, using tools, fire/explosion, communication issues, waste control, and environmental impacts. For each hazard, it evaluates the probability and severity of risks, identifies control measures, and calculates residual risks. The aim is to initiate, review, and manage project-related risks through this hazard identification and risk analysis procedure.
This document provides a risk assessment for fire fighting system work. It identifies several tasks and associated hazards, including transferring equipment, locating cranes, lifting, erecting scaffolding, working at heights, using tools, fire/explosion, communication issues, waste control, and environmental impacts. For each hazard, it evaluates the probability and severity of risks, identifies control measures, and calculates residual risks. The aim is to initiate, review, and manage project-related risks through this hazard identification and risk analysis procedure.
This document provides a risk assessment for fire fighting system work. It identifies several tasks and associated hazards, including transferring equipment, locating cranes, lifting, erecting scaffolding, working at heights, using tools, fire/explosion, communication issues, waste control, and environmental impacts. For each hazard, it evaluates the probability and severity of risks, identifies control measures, and calculates residual risks. The aim is to initiate, review, and manage project-related risks through this hazard identification and risk analysis procedure.
Assessor(s): FRIDI.ALI System/Activity: P r o b a b i l i t y & F r e q u e n c y Definite 5 5 10 15 20 High 4 4 8 12 16 Moderate 3 3 6 9 12 Low 2 2 4 6 8 Negligible 1 1 2 3 4 1 2 3 4 Minor Serious Major Catastrophic Severity Key to Priorities Medium Priority (5 days) High Priority (2-3 days) Immediate INTRODUCTION The table below provides a simplified representation of the methodology used and the processes Management) to be undertaken by OCIA and all Subcontractors in order to initiate, act on, IDENTIFICATION - Pre planning, Method statement , Job safety analysis. ASSESSMENT Mitigation measure, Residual risk Identify activities , Identify hazards Assess Impacts, Analyze Risk , Establish Mitigation Measures. RISK ASSESSMENT FORM Date of Assessment: 26-07-2010 Assessment No: System/Activity: Fire Fighting system (F03) The table below provides a simplified representation of the methodology used and the processes involved in this Hazard Identification & Risk Analysis Procedure (Risk Management) to be undertaken by OCIA and all Subcontractors in order to initiate, act on, review and effectively manage project-related risks ASSESSMENT Impact, Risk factor, Mitigation measure, Residual risk IMPLEMENTATION & COMMUNICATION REVIEW & UP DATE Assess Impacts, Analyze Risk , Establish Mitigation Measures. Communication & Training Audit, Inspection & Up dating of Log. Page 2 of 9 110 Rev: 0 involved in this Hazard Identification & Risk Analysis Procedure (Risk related risks throughout the Construction Phase. REVIEW & UP DATE Audit, Inspection & Up dating of Log.
Tasks Hazards Identified (include the exposed groups) Probability 1 - 5 Transfer of equipment Transfer device collide with other things; Oil leakage 4 Locate the crane Hitting injury 4 Transport Traffic risk Collision with person Collision device 3 RISK ASSESSMENT FORM Probability Severity 1 - 4 Risk 1 - 20 Control Measures to be Implemented Probability 1 - 5 3 12 Chose a qualified driver before work Check the calibration of all tools Make sure the transport device in good condition 2 3 12 Solid the ground Reinforce the pads beneath the outriggers Check the around circumstance before working 2 3 9 The trucks must respect: The limited speed in the site The circulation signs The circulation plan (updated) 2 Page 3 of 9 Probability Severity 1 - 4 Risk 1 - 20 Residual Risk Date Action Completed 1 2 1 2 3 6
Tasks Hazards Identified (include the exposed groups) Probability 1 - 5 Movement of traffic Slip/trip/all 3 Lifting Fall from height and hurt workers Component fall down Component collide with other things surrounded Collision with person Falling materials Poor visibility for the driver Crane tilt 4 RISK ASSESSMENT FORM Probability Severity 1 - 4 Risk 1 - 20 Control Measures to be Implemented Probability 1 - 5 3 9 All hose/ropes/cables in use shall be secured to the side of walkways and handrails All unnecessary materials and equipment to be immediately removed from site All exits and walkways to be kept clear for use of personnel High standard of housekeeping to be maintained at all times 2 4 16 Lifting crane, wires should be regularly calibrated, safe working loads are announced max speed at site is respected for all vehicle It is not allowed to work under loads Handling by qualified riggers worn the related PPE and under supervision Qualified crane operator and qualified rigger to operate lifting work Crane in calibrated period Barricade the lifting area 2 Page 4 of 9 Probability Severity 1 - 4 Risk 1 - 20 Residual Risk Date Action Completed 2 4 3 6
Tasks Hazards Identified (include the exposed groups) Probability 1 - 5 Lifting RISK ASSESSMENT FORM Probability Severity 1 - 4 Risk 1 - 20 Control Measures to be Implemented Probability 1 - 5 Proper lifting tools Make sure lifting wok operated in good weather Mark the area of operations of the crane Officer commanding the ship maneuver through regulatory actions to avoid accidents Control of the safety catch hook the slings Ensure the crane on his dashboard that the load weight does not exceed the maximum allowed Ban the person be under a suspended load Defining the radius of the rotary crane Prohibit the movement of people around the handling Stop the lifting operation in strong winds exceed the 50km /h and heavy rain Not lifting at night Page 5 of 9 Probability Severity 1 - 4 Risk 1 - 20 Residual Risk Date Action Completed
Tasks Hazards Identified (include the exposed groups) Probability 1 - 5 Erection and dismantling of scaffolding Personnel falling from height 4 RISK ASSESSMENT FORM Probability Severity 1 - 4 Risk 1 - 20 Control Measures to be Implemented Probability 1 - 5 4 16 Safeguards needed to control risk to acceptable level No erection/dismantling of scaffolding shall be carried out during the hours of darkness Over the site scaffolding operations shall cease in case of high winds. Wind speed maximum 20 knots Safety belt/harness shall be worn by scaffolders working over the side All gaps in scaffolding structure shall be highlighted by tiger tape Gaps in scaffold boards shall be well secured Scaffold boards shall be well secured Use of scafftag Removal of garnet from boards to avoid stress on scaffolding 2 Page 6 of 9 Probability Severity 1 - 4 Risk 1 - 20 Residual Risk Date Action Completed 3 6
Tasks Hazards Identified (include the exposed groups) Probability 1 - 5 Erection Work at height Falls from height Falling objects material and tools falling down Pipe rack fall down 4 RISK ASSESSMENT FORM Probability Severity 1 - 4 Risk 1 - 20 Control Measures to be Implemented Probability 1 - 5 4 16 Prohibition to work at heights of night Prohibit work at height if the weather affected the safety of persons Protection of persons with safety harnesses the scaffolding should be based on graded soil with good foundation Protect a guard with a height of 1.15 m Protect with an end-board 10 to 15 cm high All gaps in scaffolding structure shall be highlighted by tiger tape the scaffolding boards shall be well secured Use of scafftag Removal of garnet from boards to avoid stress on scaffolding Tools put into the tools pocket their capacity. 2 Page 7 of 9 Probability Severity 1 - 4 Risk 1 - 20 Residual Risk Date Action Completed 3 6
Tasks Hazards Identified (include the exposed groups) Probability 1 - 5 Work at height Use tools Hand injuries crushed fingers smooth head against the frame 3 Fire Explosion Abrasive particles 3 RISK ASSESSMENT FORM Probability Severity 1 - 4 Risk 1 - 20 Control Measures to be Implemented Probability 1 - Erection in accordance with the requirement It is forbidden to exceed the prescribed load on the Man basket All man baskets will be load tested and certified. All man baskets will not be overloaded and will be used inside 3 9 ensure protection adequate PPE (gloves, helmet, goggles, harness 2 3 9 Check the cleanness of the workplace Site emergency plan to be followed in event fire or explosion. All personnel to be inducted and aware of emergency procedures. Installation of fire extinguishers visible and accessible No smoking or naked lights 2 Page 8 of 9 Probability 5 Severity 1 - 4 Risk 1 - 20 Resi dual Risk Date Action Completed 2 4 3 6
Tasks Hazards Identified (include the exposed groups) Probability 1 - 5 Communication miscommunication between riggers and crane operators 3 Waste control Waste of cut 3 Environmental Pollution the air: Exhaust gas, The dust Leaking oil or diesel machines on soil 3 Assessor Print : RISK ASSESSMENT FORM Probability Severity 1 - 4 Risk 1 - 20 Control Measures to be Implemented Probability 1 - 5 3 9 Only the designated riggers who are allowed to communicate with the crane operators. Operators and riggers will use hand held radios at all times and will be sure that they use the same frequency prior to lifting. 2 4 12 Waste material recycle bin will set up and clear up regularly To finish the work site clean 2 3 9 Checking the condition of equipments before beginning the work ventilation Workstation 2 Sign: Date: Page 9 of 9 Probability Severity 1 - 4 Risk 1 - 20 Residual Risk Date Action Completed 2 4 3 6 2 4