0 оценок0% нашли этот документ полезным (0 голосов)
24 просмотров2 страницы
RIPE Inflatable Packers manufactures and supplies inflatable packers for down-hole packer tests, casing repairs, hydraulic fracturing, water well abandonments and grouting procedures. RIPE also provides all related packer test equipment and accessories.
RIPE Inflatable Packers manufactures and supplies inflatable packers for down-hole packer tests, casing repairs, hydraulic fracturing, water well abandonments and grouting procedures. RIPE also provides all related packer test equipment and accessories.
RIPE Inflatable Packers manufactures and supplies inflatable packers for down-hole packer tests, casing repairs, hydraulic fracturing, water well abandonments and grouting procedures. RIPE also provides all related packer test equipment and accessories.
RIG WIRELINE HQ54LP27SE0.5 Perm bility Packer T est Procedure 1. Pull thinneYTe assemblyfromthe core barrel, leaving the drill string in place. 2. Elevate the drill stria9 off the drill hole bottomand I expose th permeaBlityzone. 3. Secure/ st bilise the drill )1,tring inplace. N o m . Install the sealing tight head. 5. Lower the packer throughthe sealing tight head and drllPtring, positioning intothe core barrel. Install steel washers and rubber shies inthe tight ead and tightenthe compressioncap. 7. Coect the nyloninflationtube tothe g s/air supply. 8. Slowinflate the permeabilitypacker ini rements of until e desired pressure is met. Inject war throughthe tight head asse packer into he test zone. ermeabilityest is run inunder instructionb oject enginr. 1 1 Once testing is omplete deflate the packer. 12. Make suds packr is fullydeflated before movin fromthe drill hoe. 13. Undocomp n tight head and remove rubbe seals and stee shers. 14. Reinstall the copressioncap and remove the packr. 15. Remove the seal ng tight head and thenlower the inner tube assembl intoposition. 16. Connect the dr" Irods, lowering the drill string t the hole bottoand restart drilling. 7. OHS procedues must be followed. flationan use of packers and packer equip rators ownrisk. WIRE CORIN G DIAM OND BIT SPEC et OD Bit set ID CORED 1-0OrSIZE 95.58 mm63.5nim96 mm HODRILLROD SPE&FICATION S -41 G E O - P A C K E R 0 5 4 m m HO DST SINGLE PACKER T EST ING T OOL WEIG HT(kg) VOLUME(Litres) 34.88 44.58 Max Working pressure vs hole diameter Boreholes diameter(mm) 56 60 65 70 75 80 85 90 95 100 105 110 115 Percentageinflationdiameter 3.7 11.1 20.4 29.6 38.9 48.1 57.4 66.7 75.9 85.2 94.4 103.7 113 Inflationpressure(bar) 155 140 120 100 80 70 60 50 40 35 30 25 20 N on confined Free air Inflation Diameter(mm) 60 65 70 75 80 85 90 95 100 105 110 115 120 125 Inflationpressure(bar) 1.5 2.1 2.5 2.8 3 3.1 3.3 3.7 4 4.5 5 6 7 14 Replacement Inflatable Packers and Elements Pty Ltd 29 Wheeler St Belmont 6104, PerthWesternAustralia Tel: (+61 (08) 9475 0700 Fax: +61 (08) 9475 0770 packers@ripe-packers.comwww.ripe-packers.com WA Australia SupplierM anufacturer of Inflatable Packers forDSTWell Packer T esting Permeability single/ doublepacker testing equipment andServices AU. GEO-Packers T M DST PACKER T EST T OOL GEO-PACKER 0 54mm HQ DST DOUBLE PACKER T EST ING T OOL 1 -1 0 5 4 LP2 7 SE0 . 5 / WIRELINE SEALING TIGHT HEAD PermbilityPackerTest Procedure RIG WIRELINE- 1. Pull thinneYTeassemblyfromthecorebarrel, leavingthedrill string in place. ALL BORE 2. Elevatethedrill stria9offthedrill holebottomand NYLON INFLATION INE exposeth permeaBlityzone. 3. Secure/ st bilisethedrill )1,tringinplace. 4. Install thesealingtight head. 5. Lowerthepackerthroughthesealingtight head anddrllPtring, positioningintothecorebarrel. Install steel washers and rubber shies inthetight eadandtightenthecompressioncap. 7. Coect thenyloninflationtubetothegs/airsupply. 8. Slowinflatethepermeabilitypackerini rements of until edesiredpressureismet. Inject warthroughthetight headasse packerinto hetest zone. STEM PAC ermeabilityest is run inunderinstructionb CONDUCitirPIP HO DRILL RODS HO CORED HOLE oject engin 11Oncetestingis --r 12. Make suee pack ---HQ BIT SEATING fromthedrill ho 13. Undocomp seals andstee 14. Reinstall theco 15. Removetheseal innertubeassembl 16. Connect thedr' 116. theholebotto PEN HOLE BOTTOM PACKER 1 7 . OHS procedu flation an r. ompletedeflatethepacker. risfullydeflatedbeforemovin e. n tight headand removerubbe shers. pressioncap and removethepacks ngtight headand thenlowerthe intoposition. I rods, loweringthedrill stringt andrestart drilling. esmust befollowed. useofpackersandpackerequip ratorsownrisk. 0 WIRE CORING DIAMOND B SIZE et OD Bit set ID CORED H 5.5# mm63. 5 mm 96 mm HO DRILL ROD SPECIFICATIONS OD (rnm) WEIGHT (kg)VOL E (Litres) 88.934.88 416, 144.58 MaxWorking pressure vs hole diameter Boreholesdiameter(mm) 56 60 65 70 75 80 85 90 95 100 105 110 115 Percentageinflationdiameter 3.7 11.1 20.4 29.6 38.9 48.1 57.4 66.7 75.9 852 94.4 103.7 113 Inflationpressure(bar) 155 140 120 100 80 70 60 50 40 35 30 25 20 NonconfinedFree air Inflation Diameter(mm) 60 65 70 75 80 85 90 95 100 105 110 115 120 125 Inflationpressure(bar) 1.5 2.1 2.5 2.8 3 3.1 3.3 3.7 4 4.5 5 6 7 14 Replacement Inflatable Packers and Elements Pty Ltd 2 9 Wheeler St Belmont 61 0 4 , Perth Western Australia T el: (+61 (0 8) 94 7 5 0 7 0 0 Fax: +61 (0 8) 94 7 5 0 7 7 0 packers@ripe-packers. com www. ripe-packers. com WA Australia SupplierM anufacturer of Inflatable Packers forDST Well Packer T esting Permeability single/ doublepacker testingequipment andServices AU. r.