Atul Limited

Enquiry Specification for Methanol Filter


1.0 GENERAL REQ!REMEN"S
Vendor to note that technical details given in this specification covers the broad requirement.
Vendor shall include & specify all items & details to ensure performance of the unit as per desired
specifications.
Vendor must select filter area to permit filtration rate & provide adequate dirt holding capacity as
specified below.
*Marked Items to be specified by vendor
#.0 Specification$
2. !"# $o. % &'( )*2
2.2 +,"$!I!- %
2.. M./.&. housing0filter element % 11(.*20*
2.2 !ype of filter % *
2.2 3$4 &/$$3&!I/$ process0utility fluid % "1" )*5 '6"$#3 3$4
2.) !-73 /' &6/1,83 '/8 &"1I$# % '6"$#34 ! & # type with eye bolts
%.0 &R'(ESS )A"A
.. 'luid handled % 4istilled methanol at 8!
..2 1pecific #ravity 9 at operating !emperature: % *.;
... Viscosity9at operating !emperature: % *. &p
..2 'low rate % ) m.0hr
..) "llowable pressure drop % *.) bar
..< 7article si=e retention % 2 microns 9absolute at ** > efficiency:
..? 3ffective filtration area0 rating % * m
2
0 * microns
..; &ake !hickness0loading % * mm 9&onsider kg dirt loading:
..@ 'low 4irection % /utside to Inside
*.0 "E(+N!(AL &ARAME"ERS
2. 4esign 'ilter Vessel % "s per "1M3 1ec. VIII 4iv I
2.2 4esign 7ressure 91hell: % 2.) bar g
2.. 4esign 7ressure 9Aacket: % $"
2.2 /perating 7ressure 91hell: % 2.* bar g
2.) /perating 7ressure9Aacket: % $"
2.< 4esign !emperature91hell: % )* deg &
2.? /perating !emperature91hell: % .* deg &
2.; Aacket side utility % $"
2.@ 'ilter housing diameter % *mm
2.
*
'iltration "rea % *m2
2.

$o. 'ilter elements % * $os


2.
2
'ilter element 6ength % *mm
2.
.
&ake Bolding &apacity % * litres at *mm cake thk
2.
2
'ilter element 4imensions % *mm dia C *mm long
2.
)
$umber and 7itch of cartridges % *mm centre to centre
2.
<
!ype of filter element % 4isposable
2.
?
Dackwashing 7ressure reqd. % $"
2.
;
!ype of &losure for casing % 3ye Dolt
2.
@
1ealing of cartridge with housing % #asket sealing preferred over o(ring based
on our eCperience
,.0 SRFA(E F!N!S+
). I$!38$"6 1.1. 7/8!I/$ % Duffed to ;* grit
).2 3E!38$"6 1.1. 7/8!I/$ % "cid cleaned
).. 3E!38$"6 &.1. 7/8!I/$ % !wo coats of 3poCy red oCide primer F
epoCy grey
-.0 !NSLA"!'N % $ot in scope of vendor
..0 S&&'R"S % *
/.0 GAS0E" % *
1.0 N"S 2 3'L"S 2 (4(LAM&S % 3ye Dolts
11.
0
!NS&E("!'N Material shall be inspected by "!,6.
Vendor to give material test certificates in 2
copies.
1#.
0
&ERF'RMAN(E GARAN"EE 3ntire equipment shall be tested for
performance continuously for 22 hours and
guarantee figures shall be established. !he unit
shall be guaranteed against workmanship for a
period of ; months from the date of delivery or
2 months from the date of commissioning
whichever is earlier.