3 2 24 4 Check for any Isolated or Tag Out Equipment 3 5 Check for normalization of Drain valve, Vent valve etc 4 25 5 26 6 27 7 28 8 29 9 30 10 31 11 32 12 13 33 14 34 15 16 35 17 18 19 20 21 UNIT START UP PROCEDURE - PREPARATION 10kV UB A & B BUS Normal, Voltage > 9500V DCC system is inservice Steam Drum Level 0mm Boiler filling complete Dea. & FW tank Level > 50mm LP Heaters, Deaerator and Feedwater Tank and HP Heaters filling complete Hot-Well Level > -50mm Instrument Air / Service Air Pressure > 7.6 barg Compressed Air system is inservice Closed Cysle Cooling Water system is inservice Auxiliary Cooling Water system is inservice Condensor Tube Cleaning system is inservice Condenser Hot-Well filling complete ESP Warming - Fuel Oil System auto - Fuel Oil Supply Flow SV Auto CHECK CEP A or B run Condensate Water System is inservice Electro Chlorination Plant is inservice Circulating Water system and Intake Screen system are inservice Make up water system and related tanks/basins and their water level, Make up water tanks and EDG Day Tank normal level CCCW chemical dosing system is in available Service Water Pump Outlet Pressure > 8.0 barg Service Water Pump is inservice Make up water system for Condensate and Closed Cycle cooling water are inservice Plant water supply system include Desal plant and Demin plant inservice Waste water treatment plant inservice Fire Detection, alarm and fighting systems are ready HVAC System inservice Check the Operation Mode of Equipment in Auto or Manual operation Fuel Oil System is available STARTUP PREPARATION HP TBN Bypass Control valve Oil supply unit is inservice and auto Main TBN Turning Gear is inservice Gen. Stator Cooling Water Inlet Pressure Normal : > 1.8 bar Gen. Stator Cooling Water Discharge Pressure Normal Generator Stator Cooling Water is inservice - Main Oil Conditioner Filter Pump run - Main Oil Tank Vapour Extractor A or B run - EHC Oil Pump A or B run - MOP A or B run Power Receiving ready, and Electrical system are available - Gen. Hydrogen Pressure Normal : 4.2bar ~ 4.6 bar - Gen. Coll. End Gas Purity Normal : > 85% - Gen. TBN End Gas Purity Normal : > 85% Generator Hydrogen filling complete and Hydrogen pressure normal Gen. Seal Oil Strainer DP (TBN END) > 0.3bar Generator Seal Oil system is inservice DCS System inservice DC power for Emergency Oil pumps and Emergency Seal Oil pump is inservice Turbine Lube Oil and EHC Oil systems are inservice FGD Warm up Aux. steam system is inservice and check the condition of steam source and Aux. steam Header BFPT A and B Turning Gear is inservice - BFPT A & B Oil Conditioner Filter Pump run - BFPT A & B Main Oil Tank Vapour Extractor run - BFPT A & B MOP run BFPT A and B Lube Oil system is inservice LP TBN Bypass Control is in Auto 01