0 оценок0% нашли этот документ полезным (0 голосов)
107 просмотров10 страниц
The project is suggesting a comparison between the planimetric projected dimensions, and the ones put effectively in work, for a civil multi-staged building, edified in Cluj-Napoca.
The execution project, certified for non transformation, that stood as the base of the building edification, was made available to our study by the investor. The building has been cleared of furniture, for easier measurements, so that they could be more conclusive.
The measurements have been done by a team made of three persons, using for measuring the distances and surfaces a laser meter Leica DISTO A3. This instrument is based on the laser technique, namely Laser class II, Laser type 635 nm, < 1Mw. The laser merer is a robust instrument, with the dimension 135 x 45 x 31 mm and reduced weight ( 150 g ), which makes is easy to use. The keyboard allows elemental calculations like adding and subtracting, us well as calculation of surfaces and volumes. There also exist keys extra functions which calculate the diagonals from the corners, by measuring the minimum and maximum, alongside with memory keys that easily store the measured values.
At the same time, the accuracy of the measurements can be accentuated with the help of instruments based on laser-technique, in our case, the Leica DISTO A3 laser-meter.
The comparative results of the study between the estimated dimensions and the actual ones, the ones put in the work, will be presented in the tabulated form.
Оригинальное название
SISTEM DE IZOLARE SEISMICĂ UTILIZÂND PERNE DE AER ȘI EEW
The project is suggesting a comparison between the planimetric projected dimensions, and the ones put effectively in work, for a civil multi-staged building, edified in Cluj-Napoca.
The execution project, certified for non transformation, that stood as the base of the building edification, was made available to our study by the investor. The building has been cleared of furniture, for easier measurements, so that they could be more conclusive.
The measurements have been done by a team made of three persons, using for measuring the distances and surfaces a laser meter Leica DISTO A3. This instrument is based on the laser technique, namely Laser class II, Laser type 635 nm, < 1Mw. The laser merer is a robust instrument, with the dimension 135 x 45 x 31 mm and reduced weight ( 150 g ), which makes is easy to use. The keyboard allows elemental calculations like adding and subtracting, us well as calculation of surfaces and volumes. There also exist keys extra functions which calculate the diagonals from the corners, by measuring the minimum and maximum, alongside with memory keys that easily store the measured values.
At the same time, the accuracy of the measurements can be accentuated with the help of instruments based on laser-technique, in our case, the Leica DISTO A3 laser-meter.
The comparative results of the study between the estimated dimensions and the actual ones, the ones put in the work, will be presented in the tabulated form.
The project is suggesting a comparison between the planimetric projected dimensions, and the ones put effectively in work, for a civil multi-staged building, edified in Cluj-Napoca.
The execution project, certified for non transformation, that stood as the base of the building edification, was made available to our study by the investor. The building has been cleared of furniture, for easier measurements, so that they could be more conclusive.
The measurements have been done by a team made of three persons, using for measuring the distances and surfaces a laser meter Leica DISTO A3. This instrument is based on the laser technique, namely Laser class II, Laser type 635 nm, < 1Mw. The laser merer is a robust instrument, with the dimension 135 x 45 x 31 mm and reduced weight ( 150 g ), which makes is easy to use. The keyboard allows elemental calculations like adding and subtracting, us well as calculation of surfaces and volumes. There also exist keys extra functions which calculate the diagonals from the corners, by measuring the minimum and maximum, alongside with memory keys that easily store the measured values.
At the same time, the accuracy of the measurements can be accentuated with the help of instruments based on laser-technique, in our case, the Leica DISTO A3 laser-meter.
The comparative results of the study between the estimated dimensions and the actual ones, the ones put in the work, will be presented in the tabulated form.
SISTEM DE IZOLARE SEISMIC UTILIZND PERNE DE AER I EEW
EARTHQUAKE EARLY WARNING
ABSTRACT
The project is suggesting a comparison between the planimetric projected dimensions, and the ones put effectively in work, for a civil multi-staged building, edified in Cluj-Napoca. The execution project, certified for non transformation, that stood as the base of the building edification, was made available to our study by the investor. The building has been cleared of furniture, for easier measurements, so that they could be more conclusive. The measurements have been done by a team made of three persons, using for measuring the distances and surfaces a laser meter Leica DISTO A3. This instrument is based on the laser technique, namely Laser class II, Laser type 635 nm, < 1Mw. The laser merer is a robust instrument, with the dimension 135 x 45 x 31 mm and reduced weight ( 150 g ), which makes is easy to use. The keyboard allows elemental calculations like adding and subtracting, us well as calculation of surfaces and volumes. There also exist keys extra functions which calculate the diagonals from the corners, by measuring the minimum and maximum, alongside with memory keys that easily store the measured values. At the same time, the accuracy of the measurements can be accentuated with the help of instruments based on laser-technique, in our case, the Leica DISTO A3 laser-meter. The comparative results of the study between the estimated dimensions and the actual ones, the ones put in the work, will be presented in the tabulated form.
1. INTRODUCERE
Cutremurele de pmnt sunt fenomene geologice natural, complexe, care se exteriorizeaz prin micri dezordonate ale soarei terestre. Aceast micare, cu o durat relativ scurt, are variaii rapide ale direciei, vitezei i acceleraiei. Vibraiile rezult fie din micrile plcilor tectonice, fie din activitatea vulcanic, fie din cedarea straturilor geologice. Cutremurele puternice pot distruge construcii, cldiri, chiar
2
i localiti ntregi, putnd produce ca efecte secundare alunecri de teren, incendii i alte catastrofe naturale. Cutremurele submarine pot declana formarea de valuri uriae, cu nlime de pn la 30 de metri i cu viteze impuntoare de pn n 800 km/h (tsunami). Seismele pot aciona asupra mediului nconjurtor prin modificarea strii de echilibru a structurilor superficiale ale terenului, prin rupturi n scoar, nsoite de prbuiri sau procese de faliere; alunecri de teren cu antrenarea unor versani; tasri i lichefieri ale depozitelor nisipoase saturate. Cutremurele i alunecrile de teren pot produce aupra construciilor i ansamblurilor de construcii efecte negative, cumar fi: distrugerea total sau parial a unor cldiri vulnerabile; distrugerea unor elemente (structurale sau nestructurale); distrugerea/avarierea unor echipamente i instalaii din cldiri, a unor reele publice de utilitate vital (alimentare cu ap, gaze, energie electric, energie terminc, transport, comunicaii) i izolarea unor zone; blocarea unor intersecii de strzi principale, ca urmare a prbuirii unor cldiri i mpiedicarea operaiunilor de salvare-ajutorare, (Fig.1., Fig. 2.).
Fig. 1. Structuri prbuite, Haiti, 2010
Fig. 2. Efecte ale cutremurelor
Pentru structuri mai noi, normele seismice introduse dup 1981 i 1995 asigur o rezisten crescut fa de cele proiectate anterior. Pentru a reduce efectele cutremurelor, nc din secolul XX au fost propuse sisteme de amortizare. Dezvotarea lor este o prioritate pentru cercetrile din ntreaga lume ntruct mbuntesc semnificativ comportamentul structurii. Sistemele de izolare antiseismic sunt n principal dispozitive care au drept scop micorarea impactului seismului prin mrirea perioadelor proprii de vibraie i transmiterea i disiparea impulsului seismic.
2. PROTECIA ANTISEISMIC A CONSTRUCIILOR
Seismul produce micarea bazei de rezemare a cldirii. Fundaia transmite micarea oscilatorie intreinu, iar dup ncetarea seismului, execut oscilaii libere amortizate. Aciunea seismic trebuie considerat ca un process continuu de alimentare cu energie a structurii de ctre teren prin intermediul fundaiei. In desfurarea acestui proces, se realizeaz un bilan energetic care conine: energia indus n structur, energia absorbit de structur i energia restituit terenului. Toate aceste forme de energie constitue energia capabil a structurii. Aceast energie reflect posibilitile de deformare elastic ale structurii dar i capacitate de deformare elastoplastic. Considerentele de mai sus permit intuirea a dou modaliti de concepere a construciilor rezistente la cutremur. O prim legatur const n realizarea unor asemenea legturi ntre structura i fundaie astfel nct energia care intr n structur s fie ct mai mic. Construciile realizate n conformitate cu acestea, se 3 cunosc sub denumirea de cldiri cu sisteme de protecie seismic de izolare a bazei. Principalele mijloace de obinere a sistemului de izolare seismic sunt: fundaiile cinematice, reazemele elastic i stlpii pendulari. O a doua modalitate pentru a crea construciilor rezistente la cutremur, opteaz pentru variant de mrire a energiei capabile, prin: sporirea energiei capabile a structurii prin echiparea acesteia cu disipatori de energie; scheletul portant se realizeaz astfel nct s consume mai mult energie indus. Sistemele de izolare sesimic au drept scop reducerea impactului cutremurelor asupra construciilor cu ajutorul unor dispositive speciale. Se utilizeaz dou feluri de sisteme de protecie seismic, active i pasive. In primul caz, dispozitivele folosite genereaz artificial o micare cu parametri adaptabili care este de sens contrar micrii seismice. n schimb, sistemele de protecie pasiv au drept scop s concentreze deformaiile sesimice n anumite zone i s consume o parte din energia seismic. Se deosebesc patru feluri de sisteme de protecie pasiv: sisteme de izolare la baz; sisteme de amortizare adugate; sisteme vibratoare abordate; sisteme cu dispozitive histeretice.
In prezent, cel mai larg folosite sunt dispozitivele de izolare ale bazei, datorit proiectrii simple i a uurinei de realizate i de intreinut. Izolarea bazei presupune realizarea unei legaturi speciale ntre construcie i fundaie, care s decupleze micarea structurii de micarea bazei de rezemare, Fig. 3.
Fig. 3. Modul de lucru al izolatorilor la baza structurii: (a) fundaie direct; (b) fundaie izolat Sistemele de amortizare mbuntesc proprietile disipative ale structutii fr modificri semnificative ale rigiditii i capacitii portante ale construciei. Sistemele de amortizare adaugate creeaz o cretere a perioadei proprii de vibraie natural, creia i revine un spectru de rspuns al acceleraiei de mai mic intensitate.
3. IZOLAREA SEISMIC
Izolarea bazei de rezemare a structurii urmrete introducerea n suprastructur a unei cantiti mai mici de energie. Datorit acesteia, micarea constructiv are o dezvoltare redus i n consecin, forele de inerie au intensiti mici. Asadar, pricipalul scop al acestor sisteme const n: limitarea forelor din structur sub nivelul de avarie, fiind sigurane fuzibile; concentrarea deformaiilor structurii n aceste dispozitive cu scopul de a disipa cea mai mare parte din energia indus.
3.1. Evoluia sistemelor de izolare seismic
4
Fundaii cinematice Fundaiile cinematice se compun din dou blocuri unul inferior i celalalt superior. Intre blocuri se insereaz un element cu rol de rulment. Aceste, la rndul su, are dou balastiere metalice ntre care se interpun fie rulouri, bile sau elipsoizi, (Fig. 4.)
Fig.4. Reazeme cu rulouri cu deplasare (a) Pe o direcie (b) Pe dou direcii
Construcii pe reazeme elastice Principiul de funcionare al acestui sistem de izolare, const n interpunerea unui baraj, disipator de energie ntre fundaie i suprastructur, Fig. 5. Acest baraj consum o mare parte din energia seismului indus prin deformaii elastice. Introducerea ntre construcie i fundaie a unor reazeme elastice pachetede cauciuc, resort metalic are ca efecte: izolarea suprastructurii de fluxul energiei seismice; readucereaa structurii la poziia iniial; creterea perioadei proprii a oscilaiilor libere i n consecin, reducerea forelor de energie.
Fig. 5. Reazeme elastice Sisteme de izolare cu resorturi metalice La acest sistem, fundaia construciei se realizeaz din corpuri separate printr-o folie de p.v.c. (Fig.6.). Prin comprimarea resorturilor, corpul 2 al fundaiei se desprinde de corpul 1 i rmne suspendat. Pe blocul 2, se dezvolt suprastructura. Micarea seismic agit terenul i blocul 1 al fundaiei. Suprastructura primete o cantitate mic de energie dezvoltat de resorturi.
5 Fig. 6. Fundaii cu arcuri metalice
Sisteme de izolare pe reazeme din cauciuc Reazemele din cauciuc au nceput s fie frecvent folosite la construciile care necesit protecie seismic total cumar fi: centrale atomo-electrice, construcii vitale, monumente istorice. Reazemele din cauciuc, folosite la izolarea seismic, trebuie s fie flexibile pentru a transmite o energie ct mai mic, dar i rigide pentru a prelua ncrcrile vertical, Fig. 7.
Fig. 7. Fundaie pe reazeme de cauciuc
Sisteme de izolare pe stlpi pendulari Stlpii pendulari situai ntre fundaie i suprastructur, constituie un element de scurt circuit al fluxului energiei seismice. Ei sunt astfel alctuii nct permit micarea pmntului, a fundaiei sub construcie, fr ca aceasta s sufere deplasri mari, Fig. 8.
Fig. 8. Stlpi pendulari
Disipatori histeretici Disipatorii energetici sunt introdui n scheletul portant avnd i rol de rezisten. La un eveniment seismic care depete o anumit intensitate, disipatorii sunt obligai s urmeze deformaiile impuse de forele de inerie. Cnd parcurg aceste deformatii, n disipatori se produc deformaii remanente, care constituie reduceri ale energiei seismice induse. Un exemplu de astfel de disipator este disipatorul de tip cilindru piston din Fig. 9.
6
Fig. 9. Disipator de tip cilindru-piston
4. SISTEMUL DE IZOLARE CU PERNE DE AER
Unul dintre cele mai performante i noi sisteme de izolare seismic este sistemul de izolare pe perne de aer (Fig. 10). Cu toate acestea plutirea permanent este instabil, deoarece structura este capabil s se mite nu doar din aciunea seismului, dar i din ncrcarea vntului sau alte ncrcri orizontale, deoarece sistemul are un coeficient de frecare mic. n acest sistem de izolare, un rol important l are sistemul de avertizare seismic (earthquake early warning EEW). Sistemul EEW furnizeaz datele despre seismi determin activarea sistemului de izolare. Acest sistem de izolare include perne de izolare ca staii de izolare, aceste perne sunt mecanisme hidrostatice care reduc suprafaa de frecare cu fundaia printr-un strat subire produs de aerul compresat.
Fig. 10. Sistem inteligent de izolare seismic pe perne de aer Se pot utiliza dou tipuri de perne de aer, perne tip diafragm i perne tip poros (Fig. 10 i 11). Principiul de funcionare a primului tip de perne este similar cu cu cel al mainilor pe perne de aer. Aceste perne au o pondere de ridicare suficient, de exemplu capacitatea maxim a pernelor de aer, cu diametrul de 1400 mm ajunge la 40000 kg. Acestea nu se utilizeaz la structurile joase. Pernele de tip poros, au o variaie a nlimii substanial mai mic i un coeficient de frecare mult mai mic comparativ cu pernele tip diafragm. Acestea se utilizeaz pentru izolarea echipamentelor de precizie dar i a construciilor valoroase. n continuare au fost studiate pernele tip diafragm deoarece au capacitate i abilitate de a se mica spre suprafa.
7
Fig. 11. Pern de aer tip diafragm
Fig. 12. Pern de aer tip poros
4.1. Sistemul de avertizare seismic (EEW) EEW este un sitem care calculeaz intensitatea maxim i timpul de sosire al undelor seismice. n primul rnd seismometrele instalate aproape de epicentrul cutremurului detecteaz primele unde seismice, aceste date sunt transmise la un centru de operare unde sunt estimate timpul de sosire a undei i intensitatea ei pentru un loc aparte care este analizat. n final semnalul de alarm este transmis populaiei, pentru evitarea efectelor secundare ale seismului (Fig. 13).
8
Fig. 13. Sistem de avertizare seismic timpurie
4.2. Principiul de funcionare Operaia sistemului de izolare este divizat n 4 faze principale 1. detectarea cutremului; 2. analizarea/determinarea activrii; 3. izolarea; 4. revenirea. O dat ce etapa detectarea cutremurului a fost parcurs, informaia obinut este transmis la un centru de prelucrare, de acolo este transmis individual staiilor sistemelor de izolare. Aceast informaie poate fi utilizat pentru deconectarea instalaiilor de gaze, ap, curent electric, .a.m.d. Informaia este transmis la UPS care include sistemul de izolare i ncepe aprovizionarea pernelor de aer cu aer comprimat. n faza izolrii, pstreaz curgerea aerului pn cnd cutremurul se linitete. n final, sistemul de izolare oprete compresorul i structura revine la faza iniial. Dac apar deplasri remanente, este pozibil reactivarea sistemului i aducerea structurii n poziie iniial.
4.3. Sistemul de izolare experimental S-a construit un model experimental pentru investigarea comportamentului i performanelor sistemului propus, Fig. 14. n primul rnd aerul comprimat este generat de compresor, pus n funciune de un motor diesel i este acumulat n rezervorul de aer. Prin urmare fluxul aerului comprimat este controlat de o supap rigid care deschide i nchide valva solid i este controlat de un semnal de la EEW primit de pe PC. Dup aceasta aerul comprimat este direcionat ntr-un spaiu separat a sistemului de ventilare cu regulator care regleaz presiunea aerului. Dup ce aerul comprimat este repartizat n pernele de aer, controlul vitezei ajusteaz presiunea aerului i rata fluxului n fiecare pern separat, n final aerul ajunge n pernele de aer prin rezervoare mici de aer. Aceste rezervoare de aer ndeprteaz variaia presiunilor de aer naintea pomprii lui n pernelede aer.
Fig. 14. Element experimental 9
Fig. 14. reprezint o imagine a unui fragment de izolare amplasat pe o suprafa vibrat. Suprafaa este confecionat din oel cu ltime de 0.75 m, nlime de 0.261 mi greutate de 636 kg. Varietatea i viteza controlului este setat pe suprafa, 4 perne de aer fiind instalate sub fiecare col al suprafeei, fiecare pern de aer avnd o capacitate de 235 kg, diametrul de 0.150 m, primind o presiune de 0.15 MPa a aerului i 0.12 m 3 pe min a rata de curgere. Este plasat o barier mprejurul suprafeei pentru a limita deplasrile excesive, iar un burete este amplasat n interiorul barierei, pentru a diminua ocul de contact. Dimensiunea dintre bareir i burete este de 0.250 mn fiecare direcie, iar grosimea buretelui este 0.050 m Trsturile acestui sistemde izolare sunt caracterizate prin: sistemul are o preforma seismic adecvat, deoarace sistemul izoleaz vibraiile printr-o suprafa de frecare sczut generat de un strat subire de aer. Sistemul este acionat de un compresor de aer, ceea ce i confer o siguran nalt; dac structura nu este ridicat naintea micrilor principale, pernele acioneaz precum izolatorii mecanici bazai pe principiul pendulului cu friciune; posed nu doar EEW, dar i instalaii locale cu senzori pentru undele vertical; sistemul UPS asigur funcionabilitatea sistemului de izolare inclusive i n timpul cutremurului.
5. PROPRIETILE DE BAZ ALE SISTEMULUI DE IZOLARE Testele efectuate pe platforma seismic, au fost necesare pentru investigarea performanelor de izolare ale acestui sistem. S-a confirmat c perioada de timp de la primirea semnalului de alarm de la EEW, pn la ridicarea structurii este mai mic de 1.2 secunde. n consecin s-a confirmat faptul ca sistemul de izolare rspunde foarte rapid, ns este necesar meninerea n stare plin a rezervorului cu aer comprimat.
5.1. Direcie orizontal Variaia nlimii pe vertical a sistemului de izolare este foarte mic, astfel viteza aerului comprimat ntre pern i pmnt este foarte mare. Fora orizontal este primit ca for de lunecare a sistemului izolator. Coeficientul forei de frecare este foarte mic. n cadrul testelor, s-a demonstrat c rata maxim a rspunsului acceleraiei de impact este 0.56%, astfel acest sistem are o performan adecvat mpotriva impactului orizontal. Aceste sistemde izolare este foarte stabil mpotriva impactului orizontal.
5.2. Direcie vertical Acest sistem de izolare poate amortiza micrile verticale ale pmntului, aa cum a fost menionat la nceput. Pernele de aer lucreaz ca nite resorturi de aer, pe direcie vertical. Variaia nlimii este n concordan cu unda de impact, totui domeiul de variaie este mic, fiind n jur de 3mm, astfel existnd un risc minor de coleziune ntre bariera de izolare i suprafaa platformei seismice. Este preferabil de a pstra frecvena natural vertical n afara frecvenei predominante a undelor seismice, pentru a obine performana izolrii. Acceleraia rspunsului vertical este echivalent cu acceleraia undelor de impact, astfel izolarea barierei are o frecven natural n jurul frecvenei naturale a undelor de impact.
5.3. Direcie orizontal i vertical La efectuarea testelor combinate, pe ambele direcii, s-a constatat c rspunsul maximorizontal de accelerare este de 12.8% din acceleraia de impact. n consecin sistemul de izolare demonstreaz performane de izolare bune, ns micrile verticale influieneaz negativ comportarea structurii pe direcie orizontal. Pe de alt parte acesta confirm c micarea orizontal nu o afecteaz pe cea vertical. Toate testele au fost efectuate la J MA Kobe, J aponia.
6. CONCLUZII Testul de vibrare tridimensional, a confirmat c sistemul de izolare seismic are un randament adecvat, de exemplu raspunsul de accelerare orizontal este mai mic dect 38% din acceleraia de impact. Sistemul de izolare inteligent acioneaz sistemul de izolare relative repede, n mai puin de 1.2 secunde. Sistemul are o frecven vertical n jur de 56.2 Hz, care este echivalent cu frecvena predominant a undelor seismice. Rspunsul structurii este optimizat deoarece sistemul de izolare are o rat de amortizare performant. Rata de amortizare vertical este 9.58%.
10
Precizia sistemului EEW a crescut n fiecare an, astfel sistemul inteligent de izolare are o rat adecvat de performan.
7. Obiective de cercetare viitoare: micorarea sistemului de izolare (n sistemul propus aerul compresat ocup partea cea mai vast al sistemului); calcularea i determinarea dinamicii aerului pentru proiectarea i selecia pernelor de aer; Se ateapt ca proprietaile verticale necesare pentru sistemul de izolare s fie obinute de proiectarea variat a pernelor, astfel trebuie s se considere rigiditatea i amortizarea. Teoria aerului-resort i calculul dinamicii aerului vor contribui la realizarea pernelor de aer necesare pentru sistemul de izolare seismic. metoda de control a sistemului de izolare trebuie s fie mbuntit n baza proprietilor considerabile ale undelor seismic.
5. BIBLIOGRAFIE
1. Soil Dynamics and Earthquake Engineering (www.elsevier.com/locate/soildyn). 2. Ioana Olteanu Evaluarea comportrii structurilor n cadre din beton armat supuse la aciuni seismice; Iai, 2011. 3. Diana-Martina Frumosu Aspecte ale comportrii la aciuni seismice ale structurilor metalice multietajate in cadre contravntuite centric prevzute cu amortizori i fr amortizori; Bucureti, 2011. 4. Bogdan Petrina, tefania Pasca, Ioana Murean Seismic isolating systems classification, proprieties and utilization; Cluj-Napoca, 2011. 5. Vasile-Virgil Oprioreanu Contribuii la aplicarea izolrii bazei n proiectarea seismic din Romnia; Bucureti, 2012. 6. Cristian Ghindea, Nicolai opa Studiu de caz asupra unor structuri cu baza izolat; Bucureti. 7. O provocare pentru arhitectura zonelor seismice. (www.revistaconstructiilor.eu) 8. Kelly, T.E. Base Isolation of Structures. Design Guidelines, Wellington, New Zealand, ed: Holmes Consulting Group Ltd, 2001. 9. A.B.M. Saiful Islam*, Mohammed J ameel and Mohd Zamin J umaat - Seismic isolation in buildings to be a practical reality: Behavior of structure and installation technique; J ournal of Engineering and Technology Research, April 2011. 10. Iuliu Dimoiu Inginerie Seismica; Bucuresti, 1999 11. Michael N. Fardis - Seismic Design, Assessment and Retrofitting of Concrete Buildings; Greece, 2009 12. http://articles.architectjaved.com/earthquake_resistant_structures/design-earthquake-resistant-buildings-engineering-tips/Base