Вы находитесь на странице: 1из 18

Updated: Sept, 09

CONTENTS
Agency /Company-Wise
 

NORTHERN REGION SOUTHERN REGION


NEW DELHI ANDHRA PRADESH
 Delhi Transco 2  Hinduja Group 8
 Keerthi Industries 8
PUNJAB  Meenakshi Energy 8
 Kalpana Hydro 2  Singaraya Hills 8

RAJASTHAN KARNATAKA
 Astonfield Renewable Resources 2  Astonfield Renewable Resources 9
 Indo Zinc 2  Hare Krishna Metallics 9
 Ind-Barath Power (Karwar) 9
UTTAR PRADESH  Maharashtra Seamless 9
 Uttar Pradesh Power Corporation Limited 3  PGM Ferro Steels 9
 Siruguppa Sugars & Chemicals 10
WEST REGION
KERALA
CHHATTISGARH
 Kerala Sponge Iron 10
 Adhunik Power & Natural Resources 3  Kerala State Electricity Board 10
 Spectrum Coal & Power 3
TAMIL NADU
GUJARAT
 Dharani Sugars & Chemicals 11
 Astonfield Renewable Resources 3
 Essar Power 3 EASTERN REGION
 Sanghi Cement 4
BIHAR
JHARKHAND  Astonfield Renewable Resources 12
 Power Grid Corporation of India 4  Bihar State Electricity Board 12

MADHYA PRADESH JHARKHAND


 Essar Power 4  Adhunik Power & Natural Resources 12
 Revati Cements 4  Bokaro Power Supply 12

MAHARASHTRA ORISSA
 Adani Power Maharashtra (APML) 5  Jindal Steel & Power 13
 Ideal Energy Projects 5
 Kisan Veer Satara SSK 5
SIKKIM
 Maharashtra State Electricity Transmission Co 6  Lanco Infratech 13
 Maharashtra Power Generation Corporation 6
 Maharashtra State Electricity Distribution 6
TRIPURA
Company (MSEDCL)  6  North East Transmission Company 13
 Maharashtra State Electricity Transmission
Company (MAHATRANSCO) 6 WEST BENGAL
 Maharashtra State Electricity Transmission  Astonfield Renewable Resources 14
Company Limited 7  West Bengal State Electricity Transmission
 Shankar Maharshi Shankarrao Mohite Patel 7 Company 14

Power Generation Projects Page 1


Updated: Sept, 09

NEW DELHI

STATUS: PLANNING substation equipment. The cost of the project is Rs.


576.4 million. Implementation Schedule: As of August
Promoter: Delhi Transco Proj: Transmission Cost: 2009, bids are invited for the project on turnkey basis.
Rs. 576.4 million Loc: Wazirpur The last date of submission being 25-08-2009. The
Delhi Transco is to set up a Gas-insulate Substation (GIS) project has a completion period of 12-15 months from
at Wazirpur in New Delhi. The scope of works includes the effective date of contract.
complete project management, design, engineering,  Delhi Transco Limited, Office of the DGM (OS),
type testing, manufacture, transportation to site, Room No. 51, 1st Floor, Shakti Deep Building,
insurance, storage, erection, testing and commissioning Jhandewalan Extension, New Delhi 110055, Delhi.
of 220 kV GIS having 220 kV and 33 KV outdoor Website: www.delhitransco.gov.in
equipment, 100 MVA power transformers and other

PUNJAB
 
STATUS: PLANNING consultant has been appointed. The project is in its
preliminary stage.
Promoter: Kalpana Hydro Proj:
Proj: Gill Aqua Hydro  Kalpan Hydro Company India Private Limited,
Electric Power Cap: 15 MW Loc: Pathankot Dist: 1st Floor, NCPL Web Tower, A – 4, Sector 9, Noida
Gurdaspur Gautam Buddha Nagar 201301, Uttar Pradesh.
Kalpana Hydro plans to set up 15 MW Gill Aqua Hydro India. Tel: +91 120- 4661511. Fax: + 91 120- 421206.
Electric Power at Pathankot in Gurdaspur district of Email info@kalpanhydro.com. Website:
Punjab. Implementation Schedule: As of July 2009, the www.kalpanhydro.com
preparation of DPR has been completed and project

RAJASTHAN
 
STATUS: PLANNING STATUS: PLANNING
Promoter: Astonfield Renewable Resources Proj: Promoter: Indo Zinc Proj: Captive Power Plant Cap:
Non Conventional Cap: 5 MW 20 MW Dist: Banswara EDC: Mid-quarter of 2010
Astonfield Renewable Resources is planning to set up a 5 Indo Zinc plans to set up 20 MW captive power plant in
MW Solar power project in Rajasthan. Implementation the premises of its cement unit in Banswara district of
Schedule: As of July 2009, the Government allotment Rajasthan. Implementation Schedule: As of July 2209,
has been received by the company. The project is in a DPR is under progress and clearance is awaited. The
nascent stage. project is scheduled to be completed by mid-quarter of
 Astonfield Renewable Resource Private 2010.
Limited, Room No. 112 & 107, DBS House, 10/ 2,  Indo Zinc Limited, 405 Apollo Tower M G Road,
Hungerford Street. Kolkata 700017, West Bengal, Indore 452001, Madhya Pradesh. Tel: +91 731-
India. Tel: +91 33-32443981. Fax: + 91 33 - 4289000 / 2518341. Fax : + 91 731 4058080. Email :
40509300. Email: contactus@astonfield.com indozincltd@gmail.com
Website: www.astonfield.com  Plt: Mahi Cement, No. 40, Sharada Nagar, Link
Road, Banswara 327001, Rajasthan, India. Tel: +91
2962-250630 / 250551. Fax: 91 2962-250629. 

Power Generation Projects Page 2


Updated: Sept, 09

UTTAR PRADESH
 
STATUS: PLANNING
Promoter: Uttar Pradesh Power Corporation  Uttar Pradesh Power Corporation Limited, 3rd
Limited (UPPCL) Proj: Thermal Cap: 2x660 MW Floor, Shakti Bhawan Extension 14, Ashok Marg,
Loc: Jawaharpur Dist: Etah Lucknow 226001, Uttar Pradesh, India. Tel: +91-

UPPCL plans set up Thermal Power Project in Etah 522-2287867 / 2287343. Fax : + 91 522 -2288484/
2287343. Website: www.uppcl.org
district of UP. Uttar Pradesh Power Corporation Limited
(UPPCL) plans to set up 2x660 MW thermal power
project at Jawaharpur in Etah district of UP.
Implementation Schedule: As of July 2009, bids for
appointment of technical consultants are under
evaluation.

CHHATTISGARH

STATUS: PLANNING
STATUS: IMPLEMENTATION
Promoter: Adhunik Power & Natural Resources
Promoter: Spectrum Coal & Power Proj: Thermal
Proj: Thermal Cap: 2 x 660 MW Dist: Bilaspur
Cap: 250 MW Dist: Korba EDC: End of 2011.
Adhunik Power & Natural Resources plans to set up 2 x
Spectrum Coal & Power, a subsidiary of Aryan Coal
660 MW Coal based Super Critical thermal power plant
Benefication is setting up 250 MW of Coal based power
in Bilaspur district of Chhattisgarh. The company has
plant in Korba district of Chhattisgarh. Implementation
signed an MoU with the State Government.
Schedule: As of July 2009, civil work is under progress.
Implementation Schedule: As of July 2009, land
The project is scheduled for completion by the end of
acquisition is under progress and clearances awaited.
2011.
 Adhunik Power & Natural Resources Limited,
 Spectrum Coal & Power Limited, No. 202,
C/o. Adhunik Group Of Industries, Lansdowne
Cyber Heights, Road No. 2, Banjara Hills, Hyderabad
Towers, 2/ 1A, Sarat Bose Road, Kolkata 700020,
500033, Andhra Pradesh, India. Tel: +91 40-
West Bengal, India. Tel: +91 33- 30517100. Fax: 91
23545287 / 66625287. Fax: + 91 40- 23544137.
33- 22890285. Email: info@adhunikgroup.com.
Email: info@spectrumcoal.com. Website:
Website: www.adhunikgroup.com
 
www.spectrumcoal.com

GUJARAT

STATUS: PLANNING Street , Kolkata700017, West Bengal. Tel: 91 33


32443981. Fax: 40509300. Email:
Promoter: Astonfield Renewable Resources Proj: contactus@astonfield.com. Website:
Non Conventional Cap: 200 MW www.astonfield.com
Astonfield Renewable Resources plans to set up a 200
STATUS: IMPLEMENTATION
MW Solar power project in Gujarat. Implementation
Schedule: As of July 2009, the company has signed an Promoter: Essar Power Proj: Thermal Cap: 2x600
MoU with the State Government. Land acquisition for MW Loc: Salaya Dist: Jamnagar EDC: 2012
the project is under progress. Essar Power is setting up a 2x600 MW Coal based
 Astonfield Renewable Resource PVt Ltd, Room thermal power project at Salaya in Jamnagar district of
No. 112 & 107, DBS House, 10/ 2, Hungerford Gujarat. Harbin, China has been appointed as the

Power Generation Projects Page 3


Updated: Sept, 09

equipment supplier. Implementation Schedule: As of Sanghi Cement is setting up 2 X 60 MW captive thermal


July 2009, civil works are under progress. The project is power plant in two phases at the existing Sanghipuram
scheduled for completion by 2012. unit in Kutch district of Gujarat. Implementation
 Essar Power Limited, Essar House, 11 Schedule: As of July 2009, Ph I is under implementation
Keshavrao Khadye Marg, Mahalaxmi, Mumbai City and is scheduled for completion by November 2009.
-400034, Maharashtra, India. Tel: +91-22-66601100.   Sanghi Cement Limited, President House,
Fax:+91 22-24954787. Email: Ambawadi Circle, Ahmedabad 380006, Gujarat.
essarpower@essar.com. Website: http: Tel:91-79-26564535/26569939. Fax: 26560408.
ww.essar.com Email: sanghicmo@sanghicement.com. Website:
 Harbin , 170 Guixin St., Harbin-150006, Tel: 86- www.sanghicement.com
451-6231639 China.  Plt: P.O. Sanghipuram, Abadasa, Kutch 370511,
 
Gujarat India. Tel: 02831-274131 / 274132 /
STATUS: IMPLEMENTATION 274133/274138/274139. Fax: 274115/
Promoter: Sanghi Cement Proj: Captive Power 2831274123. Email: info@sanghicement.com.
Plant Cap: 2 X 60 MW Loc: Sanghipuram Dist: Web:www.sanghicement.com
Kutch EDC: November 2009 (Phase I)

JHARKHAND
 
STATUS: IMPLEMENTATION substations at Maithon in Jharkhand. The scope of work
in both the projects includes designing, engineering,
Promoter: Power Grid Corporation of India Proj: manufacture, supply, installation, civil works, testing and
Transmission Cost: Rs.1,090 million commissioning of the complete substations. Siemens
Power Grid Corporation of India is to construct and will supply the hi-end technology products such as
upgrade their 400 KV Bachau and 400 KV Maithon circuit breakers, dis-connectors, instrument
substations. Siemens has been awarded the turnkey Transformers and control & protection equipment
contract at a cost of Rs.1,090 million. Implementation manufactured at its State-of-the-Art factories in
Schedule: The projects are scheduled to be Aurangabad, Kalwa and Hyderabad.
commissioned in the next 12 to 24 months. Siemens  Power Grid Corporation of India Limited,
energy sector will construct a new 400/ 220 KV Saudamini, Plot No. 2, Sector-29, Near IFFCO
substation at Bachau and upgrade another two existing Chowk, Gurgaon 122001, Haryana. India. Tel: +91
substations of GETCO at Limbdi and Ranchodpura in 124-2571700 / 2571719. Fax: 91-124-2571760/
Gujarat. This project is a part of the Associated 2571761. Website: www.powergridindia.com
Transmission System for Ultra Mega Power Project  Siemens Limited, 130, Pandurang Budhkar
(UMPP) to transmit the bulk power generated by Marg, Worli, Mumbai 400018, Maharashtra India.
Mundra UMPP to the western region. The other contract Tel: +91 22-24987000. Fax: + 91 22-24987500.
received by Siemens is for extension of 400 KV Website: www.siemens.co.in

MADHYA PRADESH
 
STATUS: IMPLEMENTATION works are under progress. The project is scheduled for
completion by 2012.
Promoter: Essar Power Proj: Thermal Cap: 2x600
 Essar Power Ltd: Essar House, 11 Keshavrao
MW Loc: Mahan Dist: Singrauli EDC: 2012 Khadye Marg, Mahalaxmi, Mumbai 400034,
Essar Power is setting up a 2x600 MW Coal based Maharashtra. Tel: 91-22-66601100. Fax: 24954787.
Thermal power project at Mahan in Singrauli district of Email: essarpower@essar.com Website:
MP. Harbin, China has been appointed as the equipment www.essar.com
supplier. Implementation Schedule: As of July 2009, civil

Power Generation Projects Page 4


Updated: Sept, 09

 Harbin , 170 Guixin St., Harbin-150006, Tel: 86- MW coal based captive power plant at its Satna cement
451-6231639 China. facility in MP. Implementation Schedule: As of June
 
2009, work on the power plant is to commence after the
STATUS: PLANNING completion of the cement unit in the Satna facility.
Promoter: Revati Cements Proj: Captive Power  Revati Cements Pvt Ltd, No. 503, Mahakosh
Plant Cap: 35 MW Dist: Satna House, 7/ 5, South Tukoganj, Nath Mandir Road
Indore 452001, Madhya Pradesh. Tel: +91 731
Revati Cements, a group company of Indian Steel
4017509 / 2518124. Fax: +91-731-2518127. Email:
Corporation jointly promoted by Ruchi Group of
info@indiansteels.com Web: www.indiansteels.com
Industries and Mitsui & Co, Japan plans to set up a 35

MAHARASHTRA
 
STATUS: PLANNING  Ideal Energy Projects Limited, No. 122,
Telecom Nagar, Pratap Nagar Nagpur 440022
Promoter: Adani Power Maharashtra (APML) Proj:
Maharashtra. Tel: +91 712-2295988 / 2295989. Fax:
Transmission Loc: Tiroda Dist: Gondia +91 712-
APML is to implement a Power Transmission Project at
Tiroda in Gondia district of Maharashtra. The project is 2295987.
for evacuation of Power from the Tiroda Thermal Power  Mc Nally Bharat Engineering Co Ltd, No. 4
Project. The scope of works includes design, supply, Mangoe Lane, 7th Floor, Kolkata 700001, West
erection, testing & commissioning of 400 KV Double Bengal. Tel: +91 33-65500726 / 65500727 /
circuit Tiroda-Koradi Transmission Line Package. 65500728 / 65500729 / 65500730 / 65500731 /
Implementation Schedule: As of August 2009, tenders Fax: 91-33-22480340/ 22485016. Email:
are invited for the project on EPC basis with the last date mbecal@mbecl.co.in. Website:
of submission being 31-08-2009. The project has a www.mcnallybharat.com
completion period of 18 months from the date of award  

of contract. STATUS: IMPLEMENTATION


 Adani Power Maharashtra Private Ltd, 7th Promoter: Kisan Veer Satara SSK Proj: Thermal
Floor, Sambhav Building, Judges Bungalow Road, Cap: 22 MW Dist: Satara EDC: October 2010.
Bokakdev Ahmedabad 380015, Gujarat India. Tel:
Kisan Veer Satara SSK is setting up a 22 MW Bagasse
+91 79 25556946. Email: info@adanipower.com
based co-gen power plant at Satara district in
Website: www.adanipower.com
 
Maharashtra. Mitcon Consulting Services, Pune has
STATUS: IMPLEMENTATION been appointed as the project consultant. Thyssen
Krupp and Siemens are the major equipment suppliers.
Promoter: Ideal Energy Projects Proj: Thermal Cap:
Implementation Schedule: As of July 2009, civil works
1x270 MW Cost: Rs. 4,140 million Loc: Bela Dist: are yet to commence. The project is scheduled for
Nagpur completion by October 2010.
Ideal Energy Projects to implement a Coal Based Power  Kisan Veer Satara S S K Limited, Bhuinj, A/p.
Project in Maharashtra. Ideal Energy Projects Kisanveer Nagar, Taluk Wai, Satara 415515,
implementing 1x270 MW coal based power project at Maharashtra, India. Tel: +91 2167 285240. Fax: + 91
Bela in Nagpur district of Maharashtra. The scope of 2167 285147.
works includes design, engineering, manufacturing,  Mitcon Consultancy Services Ltd, MITCON
supply, erection, testing and commissioning including Kubera Chambers, Shivajinagar Pune 411005,
civil works. McNally Bharat Engineering Company has Maharashtra India. Tel: +91 20 25534322 /
been awarded on EPC basis for balance of plant at a cost 25533309. Fax: +91 20 25533206. Website:
of Rs. 4,140 million. Implementation Schedule: As of www.mitconindia.com
July 2009, the project has been awarded.   Thyssen Krupp Industries India Limited, P. O.
Bag No. 22, Pimpri, Pune 411018, Maharashtra. Tel:

Power Generation Projects Page 5


Updated: Sept, 09

+91 2027425461 / 27425462 / 27425463 / Schedule: The project is scheduled for completion in 33
27425464. Fax: 91 20- 27425821/ 27425350. Email: months.
contactus.tkii@thyssenkrupp.com. Website:  Maharashtra State Power Generation
www.thyssenkruppindia.com Corporation Limited, Prakashgad, 3rd Floor, Plot No.
 Siemens Limited: 130, Pandurang Budhkar G-9, A. K. Marg, Bandra (E) Mumbai 400051,
Marg, Opposite Doordarshan, Worli, Mumbai Maharashtra India. Tel: +91 22-26474211 /
400018, Maharashtra India. Tel: +91 22 24987000 / 26475759. Fax: 26475329. Website:
24987547. Fax:24987500. Website: www.mahagenco.in
www.siemens.co.in  B G R Energy Systems Limited, A-5,
 
Pannamgadu Industrial Estate, Ramapuram Post,
STATUS: IMPLEMENTATION Sullurpet Village, Nellore 524401, Andhra Pradesh
Promoter: Maharashtra State Electricity India. Tel: +91 44-27900181. Fax: +91 44 27948249.
Transmission Company Proj: Transmission Cost: Website : www.bgrcorp.com
 
Rs.1,410 million Loc: See Below EDC: 2010
STATUS: IMPLEMENTATION
Maharashtra State Electricity Transmission Company is
implementing 3 Substation projects in the State. The 220 Promoter: Maharashtra State Electricity
KV and 132 KV subtations are located in Nashik, Distribution Company (MSEDCL) 
(MSEDCL) Proj: Transmission
Amravati & Nagpur. ABB has been awarded the turnkey Cost: Rs. 10188.4 million Loc: See Below
contract at a cost of Rs.1,410 million. The scope of works Maharashtra State Electricity Distribution Company
includes system design, engineering, civil works, supply, (MSEDCL) is upgrading its distribution networks in
installation, commissioning and overall project Nashik and Aurangabad divisions of Maharashtra. The
management. Implementation Schedule: The project is company has awarded an order to Ashoka Buildcon Ltd,
scheduled for completion by 2010. Nashik as part of the power transmission project. The
 Maharashtra State Electricity Transmission scope of work includes construction of 72 new
Company Limited, 5th Floor, Plot No. C-19, Bandra- sub-stations, augmentations/enhancement of existing
Kurla Complex, Bandra (E) Mumbai 400051, 128 substations, construction of 33 kV overhead lines
Maharashtra. Tel: +91 222 6595130 / 26595164 / (973 Kms), construction of 11 kV overhead lines (5,600
Fax: 26598587. Website: www.mahatransco.in Kms) & construction of 7,200 new distribution
 A B B Limited, 2nd Floor, Khanija Bhavan, East transformers. The order is valued at Rs. 10188.4 million.
Wing, 49, Race Course Road, Bangalore 560001, Implementation Schedule: As of July 2009, works are
Karnataka India. Tel: +91 80 22949150 / 22949151 / under progress. The order is scheduled for completion in
22949152 / 22949153 / 22949154. Fax : + 91 80- two years.
22949148.  Maharashtra State Electricity Distribution
 
Company Limited, Office Of The Chief Engineer,
STATUS: IMPLEMENTATION Aurangabad Zone, Vidyut Bhavan, Dr. Babasaheb
Promoter: Maharashtra Power Generation Ambedkar Road, Aurangabad 431001, Maharashtra.
Corporation (MAHAGENCO) 
(MAHAGENCO) Proj: Thermal Cap: Tel: +91 240-2331347. Fax: +91 240-2331056.
2x500 MW Cost: Rs.16,320 million Dist: Website: www.mahadiscom.in
Chandrapur.  Maharashtra State Electricity Distribution
Company Limited, Office Of The Chief Engineer,
Maharashtra Power Generation Corporation
Nasik Zone, Vidyut Bhavan, Nasik Road, Nashik
(MAHAGENCO) is implementing 2x500 MW Chandrapur
42210, Maharashtra. Tel: +91 253-2462491 /
Super Thermal Power Station in Chandrapur district.
2462492 / 2462493. Fax: +91 253 2461581. Web:
BGR Energy Systems has been awarded the turnkey
www.mahadiscom.in
contract for balance of plant at a cost of Rs.16,320
 Ashoka Buildcon Ltd, Registered office 'Ashoka
million. The scope of work includes design, supply,
House', Ashoka Marg, Nashik 422011, Maharashtra.
engineering, erection, testing and commissioning of all
Tel: +91 253-3011705. Fax: 91-253-2422704. Email:
balance work of the Plant including mechanical,
corporate@ashokabuildcon.com. Web:
electrical, civil and structural works. Implementation
www.ashokabuildcon.com
 

Power Generation Projects Page 6


Updated: Sept, 09

STATUS: PLANNING
STATUS: PLANNING
Promoter: Maharashtra State Electricity
Promoter: MAHATRANSCO Proj: Transmission
Transmission Company (MAHATRANSCO) Proj:
Cost: Rs. 138.8 million Loc: Mahakala Dist: Jalna
Transmission Loc: Taharabad Dist: Nashik
MAHATRANSCO is to implement a Substation Project at
Maharashtra State Electricity Transmission Company
Mahakala in Jalna district of Maharashtra. Package C
(MAHATRANSCO) is to implement a substation project at
(132/33 kV substation) includes • Establishment of 2x25
Taharabad in Nashik district of Maharashtra. Package B
MVA, 132/33 kV transformers with bays. • 132 kV line
(132/33 kV substation) includes • Establishment of 2x25
bays - 4 Nos. (2 Nos. at Mahakal and one each at Georai
MVA, 132/33 kV transformers with bays • 132 kV line
and Ambad) • 33 kV outlets - 8 Nos. The scope of works
bays (2 nos. each at Satana and Taharabad) - 4 Nos. • 33
includes establishment of the substation with design,
kV outlets – 8 Nos. The scope of works includes
engineering, supply of material, civil works, erection,
establishment of the substation with design,
testing and commissioning. The cost of the project is Rs.
engineering, supply of material, civil works, erection,
138.8 million. Implementation Schedule: As of July
testing and commissioning. Implementation Schedule:
2009, bids are invited for establishment of the
As of July 2009, bids are invited for establishment of the
substations on turnkey basis with the last date of
substations on turnkey basis with the last date of
submission being 10-08-2009. The project is scheduled
submission being 10-08-2009. The project is scheduled
for completion in 12 months from the date of LOA.
for completion in 12 months from the date of LOA.
 Maharashtra State Electricity Transmission
 Maharashtra State Electricity Transmission
Company Limited, Office of the Executive Engineer,
Company Limited, Office of the Executive Engineer
5th Floor, Plot No. C-19, ‘E’-Block, Bandra Kurla
5th Floor, Plot No. C-19, ‘E’-Block, Bandra Kurla
Complex, Bandra (East), Mumbai 400051,
Complex, Bandra (East), Mumbai 400051
Maharashtra. Tel: +91-22-26595173. Fax:+91 22-
Maharashtra, India Tel: +91 22- 26595173. Fax: + 91
26598587. Website: www.mahatransco.in
22-26598587. Website: www.mahatransco.in  

STATUS: PLANNING
 

STATUS: PLANNING
Promoter: MAHATRANSCO Proj: Transmission Loc:
Promoter: MSETCL Proj: Transmission Cost: Rs.
Kadegaon Dist: Sangli
100 million Loc: See Below
MAHATRANSCO is to implement a Substation Project at
MSETCL is to undertake installation of 22 kV GIS
Kadegaon in Sangli district of Maharashtra. Package A
switchgear units at Bhiwandi I and Bhiwandi II (Kamba)
(220/ 132/33 kV substation) includes :
substations in Maharashtra on turnkey basis. The scope
• Establishment of 2x100 MVA, 220/132-110 kV ICT with
of works includes installation of 22 kV GIS switchgear
bays.• Establishment of 2x50 MVA, 220/33 kV
units with associated equipment / arrangements at 100
transformers with bays • 220 kV line bays - 2 Nos. • 132
KV Bhiwandi I, 220 KV Kamba II substations with design,
kV line bays - 4 Nos. • 33 kV outlets - 12 Nos. The scope
engineering, manufacturing, supply, installation with
of works includes establishment of the substation with
civil works, testing and commissioning. The estimated
design, engineering, supply of material, civil works,
cost of the project is Rs. 100 million. Implementation
erection, testing and commissioning. Implementation
Schedule: As of August 2009, bids have been invited for
Schedule: As of July 2009, bids are invited for
installation of GIS switchgear units with associated
establishment of the substations on turnkey basis with
works. The last date of submission being 10-08-2009.
the last date of submission being 10-08-2009. The
The project has a completion schedule of 6 months
project is scheduled for completion in 18 months from
(including monsoon period) from the date of letter from
the date of LOA.
MSETCL for taking over the site for execution.
 Maharashtra State Electricity Transmission
 Maharashtra State Electricity Transmission
Company Limited, Office of the Executive Engineer,
Company Limited, Office of the Executive Engineer ,
5th Floor, Plot No. C-19, ‘E’-Block, Bandra Kurla
5th Floor, Plot No. C-19, ‘E’-Block, Bandra Kurla
Complex, Bandra (East), Mumbai 400051,
Complex, Bandra (East), Mumbai 400051
Maharashtra. Tel: +91 22 26595173. Fax:+91 22-
Maharashtra. Tel:+91(22)26595173. Fax: 91-22-
26598587. Website: www.mahatransco.in
26598587. Website: www.mahatransco.in  

Power Generation Projects Page 7


Updated: Sept, 09

STATUS: IMPLEMENTATION  Maharshi Shankarrao Mohite Patel S S K Ltd,


Corporate Office: Shankar Nagar, Akluj, Malshiras
Promoter: Shankar Maharshi Shankarrao Mohite
Taluk Solapur 413118, Maharashtra. Tel: +91 -2185-
Patel S S K Proj: Thermal Cap: 33 MW Loc: 222048. Fax: 91-2185-222249.
Malshiras Dist: Solapur EDC: 2010.
 Avant Garde Engineers & Consultants Private
Shankar Maharshi Shankarrao Mohite Patel S S K is Limited, No. 68 A, Porur Kundrathur High Road,
setting up 33 MW Bagasse based co gen at Malshiras in Porur, Chennai 600116, Tamil Nadu. Tel: +91 44
Solapur district of Maharashtra. Avant Garade is the 24827843 / 24828717 / 24828718 / 24828719 /
Technical Consultant. Implementation Schedule: As of 24828720. Fax: 91-44-24828531. Email:
July 2009, civil work is under progress. The project is avantgarde@vsnl.com. Website: www.avantgarde-
scheduled for completion by January 2010. india.com

TAMIL NADU
 
STATUS: PLANNING  Keerthi Industries Limited, No. 40 IDA,
Balanagar, Ranga Reddy 500037, Andhra Pradesh,
Promoter: Hinduja Group Proj: Thermal Cap:
India.
2x520 MW Loc: Visakhapatnam EDC: First quarter
 Avant Garde Engineers & Consultants Private
of 2013. Limited, No. 68 A, Porur Kundrathur High Road,
Hinduja Group plans to set up 2x520 MW Coal based Porur, Chennai 600 116, Tamil Nadu. Tel: 91-44-
thermal power plant at Visakhapatnam in AP. Mott Mac 24827843 / 24828717 / 24828718 / 24828719 /
Donald is the technical consultant. Implementation 24828720. Fax: +91-44–2482853. Email:
Schedule: As of July 2009, bids are being received from avantgarde@vsnl.com Website: www.avantgarde-
EPC contractors and financial closure is awaited. The india.com
project is scheduled for completion by the first quarter  

of 2013. STATUS: IMPLEMENTATION


 Hinduja Group India Limited, Hinduja House, Promoter: Meenakshi Energy Proj: Thermal Cap:
171 Dr. Annie Besant Road, Worli 400018, Mumbai 900 MW (Phase I & II) Loc: Thammenapatnam
Maharashtra. Tel: 91 22- 24960707. Website: Dist: Nellore
http://hindujagroup.com.
Meenakshi Energy is setting up 900 MW thermal power
 Mott Mac Donald, 44 Dr R G Thadani Marg,
plant at Thammenapatnam in Nellore District of AP in a
Worli, 400018 Mumbai, Maharashtra. Tel:
phased manner. Phase I will comprises of 2x135 MW
39810100. Fax: +91 22 24950539. Email:
power plants and the balance to come up in Phase II.
mumbai@mottmac-india.com. Web:
Implementation Schedule: As of July 2009, EPC
www.mottmac.in
 
contractors have been appointed and civil works are
STATUS: PLANNING under progress.
 Meenakshi Energy Private Limited, Meenakshi
Promoter: Keerthi Industries Proj: Thermal Cap: 20
House, 8-2-418, Road # 7 Banjara Hills, Hyderabad
MW Cost: Rs.400 million Loc: Balanagar Dist: 500034, Andhra Pradesh. Tel: +91 40- 23358111 /
Ranga Reddy EDC: Last Quarter of 2011. 23358222 / 23358333. Fax: 23351133 / 23351530.
Keerthi Industries plans to set up a 20 MW bagasse Email: mepl@meenakshienergy.com Website:
based co-gen power plant at Balanagar in Ranga Reddy www.meenakshienergy.com
district of AP. The project envisages an investment of  

Rs.400 million. Avante Garde is the project consultant. STATUS: PLANNING


Implementation Schedule: As of July 2009, certain Promoter: Singaraya Hills Proj: Non Conventional
clearances are awaited from the State Government. The Cap: 6 MW to 
to 8 MW Loc: Hasnapur Dist: Prakasam
project is slated for completion by the last quarter of
Singaraya Hills plans to expand its wood chips
2011.
based power plant capacity from 6 MW to 8 MW at
Hasnapur power plant in Prakasam district of AP.

Power Generation Projects Page 8


Updated: Sept, 09

Implementation Schedule: As of July 2009, PPA has  Singaraya Hills Green Power Genco Private
been signed with Tata Power and clearances have been Limited, No. 40-1-21/ 21, Catholic Complex, MG
obtained. An agreement is likely to be signed with Road, Vijayawada Krishna 520010, Andhra Pradesh
NEDCAP & TATA Power. The project will be completed in India. Tel: +91 40 23202391.
24 months from the date of signing the agreement.

KARNATAKA
 
STATUS: PLANNING 20-25542122. Email: info@thermaxindia.com.
Website: www.thermaxindia.com
Promoter: Astonfield Renewable Resources Proj:  

Non Conventional Cap: 10 MW


Astonfield Renewable Resources plans to set up 10
MW Solar Power project in Karnataka. Implementation
Schedule: As of July 2009, the Government allocation STATUS: PLANNING
has been received by the company. The project is in a
Promoter: Ind-Barath Power (Karwar) Proj:
nascent stage.
Thermal Cap: See Below Loc:
Loc: Hankon Dist:
Dist: Uttar
 Astonfield Renewable Resource Private
Kannada
Limited, Room No. 112 & 107, DBS House, 10/ 2,
Hungerford Street Kolkata 700017, West Bengal, Ind-Barath Power (Karwar) plans to set up a thermal
India. Tel: +91 33- 32443981. Fax: + 91 33 power plant in two Phases at Hankon in Uttar Kannada
-40509300. Email: contactus@astonfield.com. district of Karnataka. Phase I will comprise of 2x150 MW
Website: www.astonfield.com and the Phase II of 1x150 MW PPs. Aquatherm
  Engineering, Chennai is the project consultant.
STATUS: COMMISSIONED Implementation Schedule: As of June 2009, land
development and various clearances are under progress.
Promoter: Hare Krishna Metallics Proj: Non
The first unit is slated for completion in 2 years.
Conventional Cap: 12 MW Loc:
Loc: Hirebagnal Dist:
Dist:
 Ind Barath Power (karwar) Limited, Plot No.
Koppal
30-A, Road No. 1, Film Nagar, Jubilee Hills
Hare Krishna Metallics has set up 12 MW coal & waste Hyderabad 500033, Andhra Pradesh India. Tel: +91
heat recovery based power plant at Hirebagnal in Koppal 40 23553459 / 23553460. Fax: + 91 40-23607522.
district of Karnataka. The first unit comprises of coal Email: hyderabad@ibpil.co.in. Website:
based 8 MW, the second unit of 2 MW waste heat www.ibpil.co.in.
recovery based while the third unit of 2 MW waste heat  Aquatherm Engineering Consultants Private
recovery based. Raghu Engineers, Raipur is the project Limited, St. Thomas Building, 2nd Floor, Western
consultant and Thermax, Pune is the EPC contractor. Wing, New No. 68, Old No. 150, Luz Church Road,
Implementation Schedule: As of July 2009, the first unit Mylapore, Chennai 600004, Tamil Nadu. Tel: 91-44-
was commissioned in first week of July. The second unit 24660462 / 24660464. Fax: 91-44-24996085. Email:
is under final stages of completion and will be info@aquatherm.in
commissioned in the third week of July. The third unit  

will be commissioned in a week thereafter. STATUS: PLANNING


 Hare Krishna Metallics Private Limited, Survey
Promoter: Maharashtra Seamless Proj: Captive
No. 20, Kasan Road, Village & Post Hirebangal,
Power Plant Cap: 80 MW Loc: Koppal
Koppal 583228, Karnataka India. Tel: +91 8539-
264123 / 264124 / 264125 / 264126. Fax: + 91 Maharashtra Seamless is planning to set up 80 MW
8539-264122. Email: admin@hkmetallics.com waste heat recovery based captive power plant at its
Website: www.harekrishnametallics.com. Koppal steel unit in Karnataka. Implementation

 Thermax Limited, Thermax House, 4, Mumbai- Schedule: As of July 2009, land acquisition is under

Pune Road, Shivajinagar, Pune 411005, progress and DPR is under preparation. The project

Maharashtra, India. Tel: +91 20-25542122. Fax: 91- consultant is being finalized.

Power Generation Projects Page 9


Updated: Sept, 09

 Maharashtra Seamless Limited, JINDAL Siruguppa Sugars & Chemicals is setting up a 28.2 MW
CORPORATE CENTRE, Plot No 30 Sector 44 Gurgaon bagasse based power plant at Desanur in Bellary district
122001, Haryana India. Tel: +91 124-4624000. Fax: of Karanataka. Avant Garde has been appointed as the
+ 91 124- 2574327/ 4624215. Email: project consultant, Gannon Dunkerley as the civil
contact@jindal.com. Website: www.jindal.com contractor and BHEL as the major equipment supplier.
 
Implementation Schedule: As of July 2009, civil works
STATUS: PLANNING are under progress. The project is scheduled for
Promoter: PGM Ferro Steels Proj: Captive Power completion by the last quarter of 2010.
Plant Cap: 2x2.5 MW Loc:
Loc: Hariginadoni Dist:
Dist:  Siruguppa Sugars & Chemicals Limited,
Bellary Siruguppa Taluk, Desanur Bellary Karnataka 583140.
Tel: +918396-221925 / Fax : + 91 8396221924
PGM Ferro Steels plans to set up 2x2.5 MW WHR based
 Bharat Heavy Electricals Limited, BHEL House,
captive power plant at its Hariginadoni facility in Bellary
Siri Fort, New Delhi 110049, Delhi India. Tel: +91 11-
district of Karnataka. Implementation Schedule: As of
26001010 / 66337000 / Fax : + 91 11-26493021./
July 2009, DPR is yet to be prepared. Further
26492534. Website: www.bhel.com
developments are expected in the following months.
 Avant Garde Engineers & Consultants Private
 P G M Ferro Steel Pvt Ltd, Door No. 271/ A,
Limited, No. 68 A, Porur Kundrathur High Road,
Opp Spicy Venue Restaurant Road No. 10, Jubilee
Porur, Chennai 600116, Tamil Nadu, India. Tel: +91
Hills Hyderabad 500033, Andhra Pradesh. Tel: +91
44-24827843 / 24828717 / 24828718 / 24828719 /
40-23553170. Fax: 91-40-23553187
  24828720. Fax: +91 44-24828531. Email:
STATUS: IMPLEMENTATION avantgarde@vsnl.com. Website: www.avantgarde-
india.com
Promoter: Siruguppa Sugars & Chemicals Proj:
 Gannon Dunkerley & Company Ltd, B-228,
Thermal Cap: 28.2 MW Loc: Desanur Dist: Bellary
Okhla Industrial Area, Phase I, New Delhi 110 020,
EDC:
EDC: Last quarter of 2010.
Delhi. Tel: +91-11-42785500. Fax:91-11-42785512.
Website: www.gannondunkerley.com

KERALA
 
STATUS: PLANNING STATUS: PLANNING
Promoter: Kerala Sponge Iron Proj: Captive Power Promoter: Kerala State Electricity Board Proj:
Plant Cap: 8 MW Dist:
Dist: Palakkad Karapuzha Dam Hydel Cap: 5 MW Dist: Wayanad
Kerala Sponge Iron is to set up an 8 MW WHR & BFC Kerala State Electricity Board plans to set up Karapuzha
based CPP in Palakkad district of Kerala. The project Dam based 5 MW hydro power project in Wayanad
consultant and EPC contractor have been appointed. district. The project is dam based and the main dam is
Implementation Schedule: As of July 2009, the financial Karapuzha Irrigation Dam. Implementation Schedule: As
closure is awaited and equipment suppliers are on of July 2009, the Board has approved the project and
the verge of being finalised. Civil works are yet to various clearances are awaited.
commence. The project is likely to be completed in 14  Kerala State Electricity Board, Vydyuthi
to15 months from the commencement of work. Bhavanam, Pattom, Thiruvananthapuram 695004,
 Promoter Company Address Kerala Sponge Kerala India. Tel: +91 471 2448989. Website:
Iron Limited, Door No. 29/ 538, 1st Floor, “SREYAS”, www.kseboard.com
 
Near Yakkara School Bus Stop, West Yakkara,
Palakkad 678001, Kerala India. Tel: +91 491- STATUS: PLANNING
2531698 / 2527956. Fax : + 91491-2530035. Promoter: Kerala State Electricity Board Proj:
 Plt Add: XV-D No. 810, Manthuruthy, Kanjikode Kuttiyadi Tail Race Hydel Cap: 4 MW Dist:
Dist:
West, Palakkad 678623 Kerala India. Tel: +91 491 Kozhikode.
2531698 / 2527956. Fax :+ 91-491 2530035.
 

Power Generation Projects Page 10


Updated: Sept, 09

Kerala State Electricity Board plans to set up a Rs.240 Promoter: Kerala State Electricity Board Proj:
million, (4 MW) Kuttiyadi Tail Race Hydro Power Project Porufalls Hydel Cap: 16 MW Cost: Rs.1,630 million
in Kozhikode district. The main river is Kuttiyadi River. Dist:
Dist: Ernakulam
Implementation Schedule: As of July 2009, the Board
Kerala State Electricity Board plans to set up a Rs.1,630
has approved the project and various clearances are
million, (16 MW) Porufalls Hydro Power Project in
awaited.
Ernakulam district. The project is run-of-river based and
 Kerala State Electricity Board, Vydyuthi the main river is Periyar. Implementation Schedule : As
Bhavanam Pattom Thiruvananthapuram 695004, of July 2009, the Board has approved the project and
Kerala India. Tel: 91 471 2448989. Website: various clearances are awaited.
www.kseboard.com
 Kerala State Electricity Board, Vydyuthi
 

Bhavanam Pattom Thiruvananthapuram 695004,


STATUS: PLANNING
Kerala India. Tel: 91 471- 2448989. Website:
Promoter: Kerala State Electricity Board Proj: www.kseboard.com
Pambar Hydel Cap: 40 MW Dist: Idukki  

Kerala State Electricity Board plans to set up 40 MW STATUS: PLANNING


Pambar Hydro Electric Power Project in Idukki district. Promoter: Kerala State Electricity Board Proj:
The main river is Pambar. Implementation Schedule: As Vakkallar Hydro Electric Power Project Cap: 24 MW
of June 2009, the preparation of DPR was Dist:
Dist: Patthanamthitta
completed and approved by the Board and Government
Kerala State Electricity Board plans to set up Vakkallar
approvals are awaited.
Hydro Electric Power Project (24 MW) in
 Kerala State Electricity Board ,, Vydyuthi
Patthanamthitta district. The main river is Vakkalar.
Bhavanam, Pattom, Thiruvananthapuram 695004,
Implementation Schedule: As of June 2009, the
Kerala India. Tel: +91 471- 2448989. Website:
preparation of DPR have been completed & approved by
www.kseboard.com
the Bboard and Government approvals are awaited.
 

 Kerala State Electricity Board, Vydyuthi


STATUS: PLANNING
Bhavanam, Pattom, Thiruvananthapuram 695004,
Promoter: Kerala State Electricity Board Proj: Kerala India. Tel: 91 471- 2448989. Website:
Peechad Hydel Cap: 3 MW Cost: Rs.170 million www.kseboard.com
Dist:
Dist: Idukki  

Kerala State Electricity Board plans to set up a Rs.170 STATUS: PLANNING


million, (3 MW) Peechad Hydro Power Project in Idukki Promoter: Kerala State Electricity Board Proj:
district. The project is run-of-river based and the main Upper Kallar Hydel Cap: 2 MW Cost: Rs.123 million
river is Western Kallar. Implementation Schedule : As of Dist:
Dist: Idukki.
July 2009, the Board has approved the project and
Kerala State Electricity Board plans to set up a Rs.123
various clearances are awaited.
million, (2 MW) Upper Kallar Hydro Power Project in
 Kerala State Electricity Board, Vydyuthi
Idukki district. The project is run-of-river based and the
Bhavanam Pattom Thiruvananthapuram 695004,
main river is Kallar. Implementation Schedule: As of July
Kerala India. Tel: 91 471- 2448989. Website:
2009, the Board has approved the project and various
www.kseboard.com
clearances are awaited.
 

 Kerala State Electricity Board, Vydyuthi


STATUS: PLANNING
Bhavanam, Pattom, Thiruvananthapuram 695004,
Kerala. Tel: 91 471-2448989. Website:
www.kseboard.com

TAMIL NADU
 
STATUS: IMPLEMENTATION

Power Generation Projects Page 11


Updated: Sept, 09

Promoter: Dharani Sugars & Chemicals Proj:


Thermal Cap: 22MW Loc: Kalayanallur Dist:
Villupuram EDC: End of 2009
Dharani Sugars & Chemicals is setting up 22MW bagasse
based co-gen power plant at Kalayanallur in Villupuram
district of Tamil Nadu. Consultants and contractors have
been appointed. Implementation Schedule: As of July
2009, civil works is under progress. The project is
scheduled for completion by end of 2009.
 Dharani Sugars and Chemicals Limited, PGP
House, No. 57, Sterling Road Nungambakkam
Chennai 600034 Tamil Nadu India. Tel: +91 44-
28311313 / 28254176 / 28252789. Fax: + 91 44-
28232074.
 Plt: Unit II, Kalayanallur, Pallagacharry Post,
Shankarapuram Taluk, Viluppuram 606206, Tamil
Nadu, India

Power Generation Projects Page 12


Updated: Sept, 09

BIHAR
 
STATUS: PLANNING electrification in Supaul district on turnkey basis under
Rajiv Gandhi Grameen Vidyutikaran Yojana for a value of
Promoter: Astonfield Renewable Resources Proj: Rs.1,032.6 million. b) Installation / Erection including
Non Conventional Cap: 100 MW associated civil works, testing & commissioning including
Astonfield Renewable Resources is planning to set up performance testing of all equipment supplied under the
a 100 MW Biomass based power project in Bihar. Rice supply contract and all other services specified in the
husk will be used as fuel. Implementation Schedule: As tender documents for creation of rural electricity
of July 2009, the Government allotment has been infrastructure and household electrification in Supaul
received by the company. The project is in a nascent district of Bihar on turnkey basis under Rajiv Gandhi
stage. Grameen Vidyutikaran Yojana for a value of Rs.47.6
 Astonfield Renewable Resource Private million. Implementation Schedule: As of July 2009, the
Limited, Room No. 112 & 107, DBS House, 10/ 2, project is under implementation.
Hungerford Street, Kolkata 700017, West Bengal,  Bihar State Electricity Board, Department Of
India. Tel: +91 33- 3244398. Fax: + 91 33 – Project & Design, Vidyut Bhawan, 4th Floor, J. L.
40509300. Email: contactus@astonfield.com Nehru Marg, Patna 800021, Bihar, India. Tel:
Website: www.astonfield.com/contactus.html +91(0612)2235046 / Fax : 91(0612)2227557
 
 Subhash Projects & Marketing Limited, No. 22,
STATUS: IMPLEMENTATION 3rd Floor, Block-A, Camac Street, Kolkata 700016,
Promoter: Bihar State Electricity Board Proj: Power West Bengal, India. Tel: +91-33-40091200 /
Transmission Cost : Rs.1,080.2 million Dist:
Dist: Supaul 40091201 / 40091202 / 40091203 / 40091204 /
Bihar State Electricity Board is implementing Rural Fax: +91-33-40091303. Website : www.spml.co.in
Eelectrification in Supaul district. Subhash Projects &
Marketing has been awarded the turnkey contract at a
cost of Rs.1,080.2 million. The project details are given
below: a) Supply of materials and equipment for
creation of rural infrastructure and household

JHARKHAND
 
STATUS: IMPLEMENTATION Towers, 2/ 1A, Sarat Bose Road, Kolkata 700020,
west Bengal. Tel: +91(33)30517100. Fax:
Promoter: Adhunik Power & Natural Resources 91(33)22890285. Email: info@adhunikgroup.com
Proj: Thermal Cap: 2 x 270 MW (Each Phase) Loc:  Bharat Heavy Electricals Limited, BHEL House,
Jamshedpur EDC: See Below Siri Fort, New Delhi 110049 Tel: +91(11)26001010 /
Adhunik Power & Natural Resources is setting up 4 x 270 66337000. Fax:91(11)26493021/(11)26492534
MW Coal based thermal power plant at Jamshedpur in Website: www.bhel.com
Jharkhand in two phases. Phase I and II comprise power  Development Consultants Private Limited, 24
plant of 2 x 270 MW each capacity. DCPL, Kolkata is the B, Park Street, Kolkata -700016, West Bengal, India.
project consultant and BHEL is the main equipment Tel: +91(33)22267601 / 22497603. Fax: 91-(33)-
supplier. Implementation Schedule : As of July 2009, 22492340/ 2492897. Email: dcl@dclgroup.com
preliminary civil work is under progress. The first unit of Website: www.dcpl.net.in
phase I is expected to be completed by January 2012  

and the second unit by March 2012. Work on phase II STATUS: PLANNING
will follow 12 months thereafter. Promoter: Bokaro Power Supply Proj: Thermal
 Adhunik Power & Natural Resources Limited, Cap: 302 MW to 500 MW 
MW Loc: Bokaro.
C/o. Adhunik Group Of Industries, Lansdowne

Power Generation Projects Page 13


Updated: Sept, 09

Bokaro Power Supply is planning to expand its Bokaro Jharkhand India -827001 Tel: +91(6542)240380 /
Power Plant capacity from 302 MW to 500 MW in 246101 Fax: 06542)247062. Web: www.bpscl.in
Jharkhand. Mecon, Ranchi has been appointed as  Bokaro Power Supply Company Private Limited
technical consultant. Implementation Schedule: As of (Registered office) : Ispat Bhawan, Lodi Road New
July 2009, DPR and clearances are under progress. Delhi 110003, Delhi. Tel: +91(11)24367461 / Fax :
 Bokaro Power Supply Company Private 91(11)24367015.
Limited, Corporate Office: Hall No. M-01, Old ADM  Mecon Limited , Doranda, Ranchi, Jharkhand,
Building Ispat Bhawan, Bokaro Steel City Bokaro India. Tel:+91(651)2483000. Fax:+91(651)2482214.

ORISSA

STATUS: IMPLEMENTATION turnkey basis. The company will also execute design &
engineering, supply, erection & commissioning including
Promoter: Jindal Steel & Power Proj: Transmission detail engineering for civil works related to this
Cost: Rs. 1200 million Dist: Angul EDC: December substation. The orders are valued at Rs. 1200 million.
2010 Implementation Schedule : The project is slated for
Jindal Steel & Power is setting up a Greenfield integrated completion by December 2010.
steel plant in Angul district of Orissa. The company has  Jindal Steel & Power Limited, Jindal Centre, 12
awarded orders for 400/220 kV substations & Bhikaiji Cama Place New Delhi 110066 , Delhi. India.
transformers to Areva T&D India. The transformers Tel: +91-11-26188340 / 26188341 / 26188342 /
order is for design, manufacturing, supply at site, 26188345. Fax: +91 11 26161271. Email:
erection, testing & commissioning of 2x315 MVA, marketing@jindalsteel.com Website:
400/220kV interconnecting transformers and 6x120 www.jindalsteelpower.com
MVA, 220/34.5kV power transformers. The substation  Areva T & D India Limited, A-7, Sector 65,
order includes major AREVA products like 400/220kV Noida Gautam Buddha Nagar201301, Uttar
circuit breakers, instrument transformers and Pradesh. Tel: +91(120)4790000 / Fax :
automation system with control and relay panels on 91(120)4791140. Website: www.areva-td.co.in

SIKKIM

STATUS: IMPLEMENTATION  Lanco Infratech Limited, Plot No. 229, Udyog


Vihar, Phase-I Gurgaon Haryana India -122016 Tel:
Promoter: Lanco Infratech Proj: Hydel Power Cap:
+91 124-4691000 / 4691001 / 4691002 / 4691003 /
500 MW Cost: Rs.2,650 million Loc: Sikkim EDC: 4691004 / Fax : +91 124-4691112 Website:
2013 www.lancogroup.com
Lanco Infratech is setting up a 500 MW hydel Power  Alstom Projects India Limited, IHDP Building,
Plant in Sikkim. The main river is Teesta river. Alstom Plot No. 7, Sector 127, Noida, Gautam Buddha
Projects India has been awarded the turnkey contract at Nagar 201301, Uttar Pradesh. Tel: +91 120-4731100
a cost of Rs.2,650 million. The scope of work includes / Fax: + 91 120- 4731200. Website :
design, engineering, erection, testing & commissioning. www.in.alstom.com
Implementation Schedule: The project is scheduled to
be completed by 2013.

TRIPURA

STATUS: IMPLEMENTATION

Power Generation Projects Page 14


Updated: Sept, 09

Promoter: North East Transmission Company Proj:  North East Transmission Company Limited, 1st
Transmission Cap: 726.6 MW Cost: Rs. 3640 million Floor, Corporate Towers, Ambience Mall Complex,
Loc: Pallatana EDC: February 2012 Ambience Island, NH-8 Highway, Near Toll Plaza
Gurgaon Haryana 122001 Tel: 91(124)4716115 /
North East Transmission Company (a JV of ONGC, IL&FS
and Govt. of Tripura) is undertaking Power transmission 4716117 / Fax : 91(124)4716120. Website:
www.tripurapower.com
projects associated with the 726.6 MW gas based power
plant at Pallatana in Tripura. The company has awarded  K E C International Limited (Registered office) :
two orders to KEC International for supply of towers, 1st Floor, CEAT Mahal, 463, Dr. Annie Besant Road,
hardware, line materials and construction of 1) Package Worli, Mumbai 400030 Maharashtra. Tel:
A3: 400 kV D/C Khelerihat-Byrinhat transmission line +91(22)66670200 / Fax : 91(22)66670286 Email:
with a route length 119 Kms in the State of Meghalaya. General-kecindia@kecrpg.com
2) Package A4: 400 kV D/C Byrnihat – Bongaigaon Website :www.kecrpg.com
Transmission line with a route length of 203 Kms in the  K E C International Limited (Branch Office) :
State of Assam. The orders are valued at Rs. 3640 DLF Infinity Towers, 7th Floor, Tower-'B', DLF City,
million. Implementation Schedule: They are scheduled Phase-II, Gurgaon 122002, Haryana India. Tel: +91
for completion by February 2012. 124- 4188777. Fax: +91 124- 4188617. Email:
kecdomestic@kecrpg.com Website
:www.kecrpg.com

WEST BENGAL

STATUS: IMPLEMENTATION  Astonfield Renewable Resource Private


Limited, Room No. 112 & 107, DBS House, 10/ 2,
Promoter: Astonfield Renewable Resources Proj:
Hungerford Street, Kolkata -700017 , West Bengal,
Non Conventional Cap: 10 MW Dist:
Dist: Bankura EDC:
EDC: India Tel: +91 33- 3244398. Fax: + 91 33 –
December 2009 40509300. Email: contactus@astonfield.com
Astonfield Renewable Resources is setting up a 10 MW Website: www.astonfield.com/contactus.html
Solar PV power project in Bankura district of West  

Bengal. Implementation Schedule : As of July 2009, civil STATUS: IMPLEMENTATION


works are under progress. The project is slated to be Promoter: West Bengal State Electricity
completed by December 2009. Transmission Company Proj: Transmission Cost:
Cost: Rs.
 Astonfield Renewable Resource Private 1070 million.
Limited, Room No. 112 & 107, DBS House, 10/ 2,
West Bengal State Electricity Transmission Company is
Hungerford Street, Kolkata 700017, West Bengal,
implementing two Power transmission projects. The
India. Tel: 91-33-3244398. Fax: 91 33–40509300.
company has awarded two orders to KEC International
Email: contactus@astonfield.com Website:
for supply of towers, line materials and construction of
www.astonfield.com/contactus.html
 
1. 400 kV S/C transmission lines associated with
STATUS: PLANNING Kolaghat TPS having a total length of 90.5 Kms. The
duration of the turnkey project is 24 months. 2. 220 KV
Promoter: Astonfield Renewable Resources Proj: DC transmission lines from Kharagpur 400 KV Substation
Non Conventional Cap: 10 MW Loc: Gangarampur to Midnapore 220 /132 KV substation and 220 kV DC
Dist:
Dist: South Dinajpur transmission lines from 400 KV Subhasgram (PGCIL)
Astonfield Renewable Resources plans to set up a 10 Substation to Saltala. The total route length of the lines
MW Biomass based power project at Gangarampur in is 58.5 Kms. Implementation Schedule : The duration of
South Dinajpur district of WB. Rice husk will be used as the turnkey project is 18 months. The orders are valued
fuel. Implementation Schedule : As of July 2009, the at Rs. 1070 million.
Government allotment of land has been received by the  West Bengal State Electricity Transmission
company. The project is in its nascent stage. Company Limited, Vidyut Bhavan, 10th Floor, A-
Block, Salt Lake City, Sector-II, Kolkata 700091, West

Power Generation Projects Page 15


Updated: Sept, 09

Bengal, India. Tel: 91 33-23580065.


Fax : + 91 33-23377957. Website: www.wbsetcl.in
 K E C International Limited, DLF Infinity
Towers, 7th Floor, Tower-'B', DLF City, Phase-II,
Gurgaon 122002, Haryana. Tel: +91 124-4188777.
Fax: +91 124- 4188617. Email:
kecdomestic@kecrpg.com. Web: www.kecrpg.com

Power Generation Projects Page 16


Updated: Sept, 09

Brief Note on
Status of Power Projects
 
We have taken utmost care to present data region-wise and state-wise in this monthly update service. Within each state,
we have placed projects in an alphabetical sequence. We have also given great deal of importance to the accuracy of the
information. However, dispite our best efforts it is possible that some errors might have crept in, which may kindly be
brought to our notice. It may be noted that the projects are discussed under the following categories.
 

CONCEPTUAL STAGE
 Scheme identified but yet to be taken up for execution
 Scheme identified and request for pre-qualification yet to be invited
 Scouting for technical know-how, fuel and land
 Expression of interest invited
 Pre-qualification bids invited/ received
 Project promoter decides to diversify/ takes investment decision
 MOU under negotiation/ preparation
 

PLANNING STAGE
 DPR under preparation
 Financial closure being achieved
 Land being acquired
 Steps initiated to receive statutory approvals
 Negotiations initiated with consultants, contractors/ suppliers
 Implementation schedule announced
 

UNDER IMPLEMENTATION
 All clearances received
 Contracts awarded
 Financial closure acheived
 Fuel supply firmed up
 Land acquired
 Civil works started/ under progress/ completed
 Pre-commissioning work started/ under progress
 

TRIAL RUNS/ COMMISSIONED


 All equipments installed successfully
 Plant inaugurated
 Trial runs started
 Plant becomes fully operational
 

UNCERTAIN STATUS
Project could not proceed towards implementation due to:
 Non availability of escrow covers from SEB/ Govt.
 Paucity of funds
 Non availability of suitable land
 Impediments in fuel supply
 

Project work held up at site due to:


 Objections raised by local public/ action groups
 Political interference
 Natural calamities
 Change in management/ M&A

Power Generation Projects Page 17


Updated: Sept, 09

ABBREVIATIONS/ ACRONYMS USED


BOOT : Build Own Operate & Transfer
BCT : Build Commission & Transfer
CAP : Capacity
CEA : Central Electricity Authority
CCFI : Cabinet Committee on Foreign Investment
CCPP : Combined Cycle Power Project
CORP : Corporation
Cu.Mtrs : Cubic Meters
Dist. : District
EDC : Expected Date of Commissioning/ Completion
DPR : Detailed Project Report
EIA : Environment Impact Assessment
EPC : Engineering Procurement & Construction
Eqpt. : Equipment
FIPB : Foreign Investment Promotion Board
FSA : Fuel Supply Agreement
HO : Head Office
KV : Kilo Volts
KVA : Kilo Volts Amperes
KW : Kilo Watts
KWH : Kilo Watt Hours
Loc : Location
LOI : Letter of Intent
Ltrs : Litres
MoEF : Ministry of Environment & Forest
MNES : Ministry of Non-Conventional Energy Sources
MW : Mega Watts
MoU : Memorandum of Understanding
NA : Not Available
Nos. : Numbers
O&M : Operation & Maintenance
Off : Office
PPA : Power Purchase Agreement
P.O. : Post Office
PSS : Pumped Storage Scheme
Plt. : Plant
Proj. : Project
RFQ : Request for Qualification
RFP : Request for Proposal
RO : Registered Office
SEB : State Electricity Board
SIA : Social Impact Assessment
STPP : Super Thermal Power Plant
Sq.Mtrs. : Square Meters
TPA : tonnes per annum
TPD : tonnes per day
TPS : Thermal Power Station
Yr : Year
Note: Costs are expressed in Millions of Rupees. (One Million equals Ten Lakhs)

Power Generation Projects Page 18