MODUS Operandi for MUR MSW Yard during NI (with NI home signal)
efore de!laration of N"I" following must #e ensured$
%" &ll glued 'oints(RDSO 'oints (whi!h are planned #efore N"I") must #e inserted #efore Non)Interlo!*ing" +" &ll the points (whi!h are to #e laid #efore N"I") must #e pa!*ed #, UNIM&- #efore Non)Interlo!*ing to minimi.e the Non) interlo!*ing time" /" 0arameters of points (whi!h are laid in #efore 0re N"I") 1i." opening and housing of swit!h2 !ross le1el 3 pa!*ing et! must #e ensure #efore non interlo!*ing for smooth wor*ing of Signaling s,stem after !ommissioning" 4" 56N liners must #e pro1ided at all the tra!* !ir!uiting area" S" No Da, NI(lo!* re7uired MUR 89NR MSW 9:& Remar*s S 3 - Wor*s % D +% hours NI for S 3 - wor*s" (i) +; hours of NI for insertion of /<= Nos" of new wires in pla!e of e>isting wires at ++ e>isting rela, ra!*s2 its testing and !ommissioning2 ?onne!tion of %% Nos" of tra!* !ir!uits2 ?onne!tion of ; Nos" of points2 testing 3 !ommissioning" (ii) / hours traffi! #lo!* for testing and !ommissioning of D(8 0anel 389NR)MSW2 MUR)89NR D(8 #lo!* instt" (i) +4 hours of NI for wiring of rela, room2 !onne!tion of %= signals2 %+ point M(?2 +@ tra!* !ir!uits2 one 8? gate2 dou#le line #lo!* instrument of MUR 89NR 3 89NR) MSW #lo!* se!tion" (ii) + hours traffi! #lo!* for testing and !ommissioning of D(8 0anel 389NR) MSW2 MUR)89NR D(8 #lo!* instt" (i) +4 hours for 0at!hing of !a#les in e>isting rela, room and lo!ation #o>es2 ?onne!tion of %= signals2 %+ ele!tri! point ma!hine2 +@ tra!* !ir!uits2 one 8? gate2 dou#le line #lo!* instrument of 89NR MSW 3 S(8 #lo!* instt" of MSW)SN? #lo!* se!tion" (ii) + hours traffi! #lo!* for testing 3 !ommissioning of D(8 0anel2 MSW)89NR D(8 #lo!* instt"2 MSW)SN? S(8 -(8ess #lo!* instt" ; hours dis!onne!ti on is re7uired at 9:& for alteration in rela, room for !hanging the e>isting -o*en less I With S(8 Daido t,pe I 3 its testing 3 !ommissioi ng (%) lo!* wor*ing will remain suspended during NI period for MUR)89NR2 MUR)A8BI2 MUR) 9:&2 89NR)MSW2 and MSW) SN? #lo!* se!tions" -rains will wor* on 08?" (+)-rain running operation during NI wor*ing at MUR2 89NR and MSW will #e done as per rules laid in 5R 3SR" (/)" Speed on point no +=%a 3 +=<a will #e rela>ed to <= *mph" (4)" &fter remo1al of #lo!*s there will #e speed restri!tion of %< 9M0B at old lo!ation of point No" /a 34a at 89NR 3 %a at MSW" (<) NI home signal will #e pro1ided at MUR2 89NR2 MSW
:ngg" Wor* 4 Brs" da, time lo!* for MUR) MSW se!tion for :ngg" Wor*s during NI" Dismantling of DS No"<=+ C %)Dismantling of point No" / a in line No"+ M&NU&88Y and 8in*iing of <= mtr"straight tra!*" +)Dismantling of point N=" 4a in line N=" + #, -)+D ma!hine and 8in*ing of <=mtr" Straight tra!*" %)Dismantling of point No"%a in line No"+ M&NU&88Y and 8in*ing of <= mtr"straight tra!*" +" M(? pa!*ing of point no +=%a 3 +=<a NO-:$ ) (i) 8ine No"/ will #e #lo!*ed at 89NR from (D)/) till NI is !ompleted" (ii) 8ine No "/ will #e #lo!*ed at MSW from (D)%) till NI is !ompleted (iii) 6or MUR2 suffi!ient operating staff to #e deplo,ed to !ater for the pro1ision of testing of signaling gears during the period in whi!h there are no trains in the se!tion(,ard" -his period is in!lusi1e of the +; hrs of NI at MUR and e>!lusi1e of the testing #lo!* of / hrs at MUR" (i1) Suffi!ient lighting arrangement and !harging point during 0NI 3 NI in station #uilding espe!iall, in rela, room and hut .one shall #e pro1ided #, :le!tri!al !onstru!tion Deptt" Sr"D:N(I(8AN Sr" DS-:(8AN Sr" DOM(8AN DY ?::(?on(590
D, ?S-:(?on(West(590 D, ?:(?on(8AN MODUS Operandi for MSW ) 0&-I Yard during NI (with NI home signal) efore de!laration of N"I" following must #e ensured$ %" &ll glued 'oints(RDSO 'oints (whi!h are planned #efore N"I") must #e inserted #efore Non)Interlo!*ing" +" &ll the points (whi!h are laid in #efore N"I") must #e pa!*ed #, UNIM&- #efore Non)Interlo!*ing to minimi.e the Non) interlo!*ing time" /" 0arameters of points (whi!h are laid in or #efore 0re N"I") 1i." opening and housing of swit!h2 !ross le1el 3 pa!*ing et! must #e ensure #efore non interlo!*ing for smooth wor*ing of Signaling s,stem after !ommissiong" 4" 56N liners must #e pro1ided at point .ones and tra!* !ir!uits" S"No Da, NI MSW SN? 0&-I Remar*s S 3 - Wor*s % D +% hours NI for S 3 - wor*s" (i) +4 hours for alteration in rela, room wiring from S(8 to D(8 towards SN? side2 !hanging of S(8 #lo!* instt" into D(8 #lo!* instrument of MSW SN? #lo!* se!tion " (ii) + hours of traffi! #lo!* for 6un!tional2 sele!tion ta#le testing and !ommissioning of D(8 panel and #lo!* instrument of MSW)SN? #lo!* se!tion" (i) +4 hours for wiring of rela, room2 ?onne!tion of %= signals2 %+ point M(? +D tra!* !ir!uits2 two 8? gates2 dou#le line #lo!* instrument of SN?)MSW 3 SN?) 0&-I #lo!* se!tion" (ii) + hours of traffi! #lo!* for testing of D(8 panel and entire sig s,stem" (i) +4 hours for 0at!hing of !a#les in e>isting rela, room and lo!ation #o>es" " ?onne!tion of %= signals2 %+ point ma!hine2 +@ tra!* !ir!uits2 one 8? gate2 dou#le line #lo!* instrument of SN?) 0&-I 3 S(8 #lo!* instt" Of 0&-I) E #lo!* se!tion"" (ii) + hours of traffi! #lo!* for -esting and !ommissioning of D(8 panel 3 entire sigg" S,stem (%) lo!* wor*ing will remain suspended during NI period for SN?)MSW2 SN?) 0&-I and 0&-I E #lo!* se!tions" -rains will wor* on 08?" -here will #e non signal mo1ement during NI"at MSW2 SN? 3 0&-I stations Mo1ement of all Up and Dn trains will #e done #, piloting as per 53SR" (+) NI home signal will #e pro1ided at MSW2 SN?2 0&-I" :ngg" Wor*s 4 Brs" da, time lo!* for MSW) 0&-I se!tion for :ngg" Wor*s 3 4 Brs" da, time lo!* for 8ine No"/ at 0&-I" Dismantling of 0oint No"<=4 > la,ing(aligning (pa!*ing of %< mtr long tra!*" %)Dismantling of point No"/ a in line No"+ #, #ridge staff and 8in*ing of <= mtr"straight tra!*" +)Dismantling of point N=" 4a in line No" + #, -)+D Ma!hine and 8in*ing of <=mtr" Straight tra!*" %)Dismantling of point No" <=% >" (/)&fter remo1al of #lo!*s their will #e speed restri!tion of %< 9M0B at old lo!ation of point No" /a 3 4a" Note$ ) (i) 8ine No"/ will #e #lo!*ed at SN? from (D)%) till NI is !ompleted" (ii) Suffi!ient lighting arrangement and !harging point during 0NI 3 NI in station #uilding espe!iall, in rela, room and hut .one shall #e pro1ided #, :le!tri!al !onstru!tion Deptt" Sr"D:N(I(8AN Sr" DS-:(8AN Sr" DOM(8AN DY ?::(?on(590
D, ?S-:(?on(West(590 D, ?:(?on(8AN MODUS Operandi for 0&-I)5&U Yard during NI (with NI home signal) efore de!laration of N"I" following must #e ensured$ %" &ll glued 'oints(RDSO 'oints (whi!h are planned #efore N"I") must #e inserted #efore Non)Interlo!*ing" +" &ll the points (whi!h are laid in #efore N"I") must #e pa!*ed #, UNIM&- #efore Non)Interlo!*ing to minimi.e the Non) interlo!*ing time" /" 0arameters of points (whi!h are laid in or #efore 0re N"I") 1i." opening and housing of swit!h2 !ross le1el 3 pa!*ing et! must #e ensure #efore non interlo!*ing for smooth wor*ing of Signaling s,stem after !ommissiong" 4" 56N liners must #e pro1ided at point .ones and tra!* !ir!uits" S"No Da, NI 0&-I E 5&U Remar*s S 3 - Wor*s % D +% hours NI for S 3 - wor*s" (i) +4 hours for alteration in rela, room wiring from S(8 to D(8 towards E side2 !hanging of S(8 #lo!* instt" into D(8 #lo!* instrument of 0&-I 5&U #lo!* se!tion " (ii) + hours of traffi! #lo!* for 6un!tional2 sele!tion ta#le testing and !ommissioning of D(8 panel and #lo!* instrument of 0&-I)E #lo!* se!tion" (i) +4 hours for wiring of rela, room2 ?onne!tion of %= signals2 %+ point M(? +D tra!* !ir!uits2 two 8? gates2 dou#le line #lo!* instrument of 0&-I)E 3 E)5&U #lo!* se!tion" (ii) + hours of traffi! #lo!* for testing of D(8 panel and entire sig s,stem" (i) +4 hours for wiring of rela, room and lo!ation #o>es" " ?onne!tion of %= signals2 %+ point ma!hine2 +@ tra!* !ir!uits2 one 8? gate2 dou#le line #lo!* instrument of E) 5&U 3 S(8 #lo!* instt" Of 5&U) -INI?B #lo!* se!tion"" (ii) + hours of traffi! #lo!* for -esting and !ommissioning of D(8 panel 3 entire sigg" S,stem (%) lo!* wor*ing will remain suspended during NI period for 0&-I)E2 E) 5&U and 5&U) -ini!h #lo!* se!tions" -rains will wor* on 08?" -here will #e non signal mo1ement during NI"at 0&-I2 E2 5&U stations Mo1ement of all Up and Dn trains will #e done #, piloting as per 53SR" (+) NI home signal will #e pro1ided at 0&-I2 E and 5&U" :ngg" Wor*s 4 Brs" da, time lo!* for 0&-I) 5&U se!tion for :ngg" Wor*s 3 4 Brs" da, time lo!* for 8ine No"/ at 0&-I" Dismantling of 0oint No"<=+ > la,ing(aligning (pa!*ing of %< mtr long tra!*" %)Dismantling of point No"+=% a in line No"+ #, #ridge staff and 8in*ing of <= mtr"straight tra!*" +)Dismantling of point N=" % a in line No" + #, -)+D Ma!hine and 8in*ing of <=mtr" Straight tra!*. (/)&fter remo1al of #lo!*s their will #e speed restri!tion of %< 9M0B at old lo!ation of point No" +=% a 3#" Note$ ) (i) 8ine no / will #e #lo!*ed at E from (D)4) 3 5&U from (D)+) till % hour #efore start of NI" M(? pa!*ing of point no +=%a2 +=; a 3 4== m tra!* of line no / of E 3 M(? pa!*ing of point no +=%a2 +=; a 3 4== m tra!* of line no / of 5&U will #e done after NI is !ompleted" (ii) Suffi!ient lighting arrangement and !harging point during 0NI 3 NI in station #uilding espe!iall, in rela, room and hut .one shall #e pro1ided #, :le!tri!al !onstru!tion Deptt" Sr"D:N(I(8AN Sr" DS-:(8AN Sr" DOM(8AN DY ?::(?on(590