Edition: August 2008 Specification: Part 416 Cast In Place Concrete Piles

PART 416
CAST-IN-PLACE CONCRETE PILES

CONTENTS
1. General
2. ualit! "e#uire$ents
%. &aterials
4. Pile Construction
'. (olerances
6. (esting of Piles
). *old Points
8. "ecords
1. GENERAL
(+is Part specifies t+e re#uire$ents for t+e installation of drilled, cast in place, reinforced concrete piles, -+ic+ do
not use per$anent casing. It does not co.er continuous flig+t auger piles /refer to Part 41)0.
(+e Contractor is responsi1le for:
/a0 pro.iding t+e detailed design of t+e piles to ac+ie.e t+e specified 2esign Geotec+nical Strengt+ /-+ere
t+e detailed design +as not 1een pro.ided 1! t+e Principal0,
/10 t+e installation of piles t+at ac+ie.e t+e 2esign Geotec+nical Strengt+ and design dura1ilit!, and
/c0 .erif!ing t+at t+e 2esign Geotec+nical Strengt+ +as 1een ac+ie.ed in practice.
3nless specified ot+er-ise in t+e Contract Specific Requirement or on t+e 2ra-ings, piles s+all 1e designed
and constructed in accordance -it+ t+e $et+ods specified in AS 21'4 and AS'100.%.
2ocu$ents referenced in t+is Part are listed 1elo-:
AS 21'4 Piling 5 2esign and Installation.
AS '100.% 6ridge 2esign 5 7oundations and Soil Supporting Structures.
!. "#ALIT$ RE"#IRE%ENTS
At a $ini$u$, t+e Contractor8s ualit! Plan s+all include t+e follo-ing docu$ents, procedures and instructions:
/a0 t+e concrete $i9 design/s0, including test results for $i9 designs, .erif!ing t+e a1ilit! to ac+ie.e
specified re#uire$ents:
/10 details of proposed 1oring e#uip$ent to 1e used and e.idence of its capacit! to carr! out t+e -or;:
/c0 proposed recording for$s to 1e used during construction and testing:
/d0 $et+odolog! to ensure pile location and .erticalit! tolerances are $et:
/e0 $et+odolog! for 1oring:
/f0 safet! re#uire$ents to ensure t+at fall protection is in place -+ene.er an open e9ca.ation e9ists:
/g0 -+ere appropriate, t+e t!pe of drilling $ud and t+e $eans of $aintaining +ead le.els:
/+0 $et+odolog! to $onitor and pre.ent conta$ination 1! ingress of loose $aterial, ground -ater or $ud
during pile construction:
/i0 $et+odolog! for placing s+aft concrete:
/<0 $et+od of cutting and 1rea;ing 1ac; of piles: and
/;0 details of t+e proposed integrit! test and load test $et+ods, including t+e na$e and #ualifications of an!
specialist su1=contractors and a $et+od state$ent of +o- t+e test -ill 1e carried out and details of t+e
record s+eets proposed for $onitoring results.
If not pro.ided 1efore+and, t+e docu$entation s+all 1e su1$itted at least 28 da!s prior to t+e co$$ence$ent of
piling -or;s.
Pro.ision of t+e docu$entation listed in t+is Clause s+all constitute a &OL' POINT.
2P(I >>C999 Page 1
Edition: August 2008 Specification: Part 416 Cast In Place Concrete Piles
(. %ATERIALS
Concrete s+all 1e in accordance -it+ Part %20 ?Concrete?. "einforce$ent s+all 1e in accordance -it+ Part %0'
?Steel "einforce$ent?. @ongitudinal reinforce$ent s+all 1e supplied in full lengt+s.
4. PILE CONSTR#CTION
4.1 E)ca*ation
(+e Contractor s+all ensure t+at t+e $et+od of construction pre.ents collapse, ingress of conta$inants and
$aterial falling in fro$ t+e surface. If te$porar! steel casing is used for t+is purpose, an! +oles 1ored prior to
placing t+e casing in position s+all 1e drilled -it+ a 1it not $ore t+an 2' $$ larger t+an t+e outside dia$eter of
t+e casing.
Ser.ices or ad<acent structures s+all not 1e da$aged 1! t+e piling operations. A+ere percussion e#uip$ent is
used, t+e le.el of energ! per 1lo- of t+e drilling 1it s+all 1e ;ept to t+e $ini$u$ consistent -it+ effecti.e 1oring,
so as to $ini$ise .i1ration, and a.oid da$age to ad<acent piles, structures or ser.ices.
At t+e co$pletion of e9ca.ation and prior to placing concrete, a &OL' POINT s+all appl!.
4.! Protection of A+,acent Pi-e
(+e Contractor s+all ensure t+at t+e pile construction process does not result in da$age to ad<acent ne-l! cast
piles due to ground .i1ration. (+e follo-ing $ini$u$ re#uire$ents s+all also 1e $et:
/a0 no pile construction s+all 1e co$$enced -it+in 2.' $ clear distance of a ne-l! cast pile until t+e concrete
in t+e pile +as attained a strengt+ of 1' &Pa:
/10 piles $ore t+an 2.' $ clear distance fro$ a ne-l! cast pile $a! 1e installed 1! 1oring at an! ti$e
pro.iding t+ere is no li;eli+ood of da$age to t+e ne-l! cast piles: and
/c0 installation of piles 1! $et+ods -+ic+ in.ol.e dri.en te$porar! casing or result in significant .i1ration
s+all not 1e carried out -it+in t+e distance 2.' $ to 4.0 $ until t+e concrete in t+e pile +as set for
24 +ours.
4.4 Concrete P-acement
Piles s+all 1e concreted -it+in 24 +ours of co$pletion of t+e pile e9ca.ation. In t+e e.ent t+at t+is is not ac+ie.ed,
t+e Contractor s+all rea$ t+e -alls and t+e 1ase of t+e pile to re$o.e not less t+an 2' $$ t+ic;ness of $aterial
and an! ot+er foundation $aterial -+ic+ +as softened in t+at ti$e.
Concreting s+all 1e a continuous process fro$ t+e toe le.el of t+e pile to t+e top of t+e pile suc+ t+at no .oids or
de1ris are left in t+e s+aft and t+e re#uired concrete co$paction is ac+ie.ed -it+out segregation of aggregate or
ingress of conta$inants. (+e reinforce$ent s+all 1e fir$l! positioned so t+at it does not $o.e during concrete
place$ent and is full! surrounded 1! t+e specified co.er of sound concrete. (+e surface of t+e concrete s+all 1e in
inti$ate contact -it+ t+e surrounding ground.
If te$porar! casting is 1eing used and concrete is 1eing placed 1elo- t+e -ater ta1le, t+e $ini$u$ +eig+t of
concrete -it+in t+e casing s+all 1e ad<usted to ensure t+at -ater is not per$itted to enter fro$ outside t+e casing.
(+e soil pressure at t+e toe of t+e casing s+all 1e 1alanced 1! t+e $ass of t+e concrete -it+in t+e casing. (+e free
surface of t+e concrete s+all 1e at least 1.' $ a1o.e t+e 1otto$ of t+e casing.
A $ini$u$ of 400 $$ of sound concrete s+all 1e constructed a1o.e t+e final le.el of t+e pile. (+e space 1et-een
t+e top of t+e pile and t+e ground surface s+all 1e filled -it+ sand -it+in %0 $inutes of placing t+e s+aft concrete.
Piles s+all not 1e tri$$ed earlier t+an 24 +ours after casting t+e concrete.
.. TOLERANCES
All piles s+all 1e constructed in accordance -it+ t+e tolerances in AS 21'4.
6. TESTING O/ PILES
6.1 Inte0rit1 Tetin0
2P(I >>C999 Page 2
Edition: August 2008 Specification: Part 416 Cast In Place Concrete Piles
Integrit! testing s+all 1e carried out on t+e piles in accordance -it+ integrit! test $et+ods specified in AS 21'4.
Integrit! testing e#uip$ent s+all 1e capa1le of c+ec;ing cross=sectional irregularities in piles and identif!ing t+e
location and c+aracteristics of an! significant ano$alies suc+ as .oids or conta$inants.
Acceptance criteria, super.ision and reporting of integrit! testing s+all 1e in accordance -it+ t+e re#uire$ents of
AS 21'4.
3nless specified ot+er-ise, integrit! testing s+all 1e carried out on all piles.
6.! Loa+ tetin0
(+e Contractor s+all carr! out d!na$ic testing of piles to confir$ t+at design pile capacit! +as 1een ac+ie.ed. At
least one d!na$ic load test s+all 1e perfor$ed for e.er! %0 piles. Additional d!na$ic load testing s+all also 1e
carried out on piles in t+e e.ent t+at pile toe le.els .ar! 1! $ore t+an 2 $etres fro$ t+e test pile. (esting s+all 1e
carried out 1! use of a Pile 2ri.ing Anal!ser /P2A0 and t+e data o1tained fro$ eac+ pile s+all 1e anal!sed using
CAPAAP, (BCAADE or ot+er appro.ed e#ui.alent soft-are.
Additional load testing re#uire$ents /including static load tests0 $a! 1e specified in t+e Contract Specific
Requirement or on t+e 2ra-ings.
(+e test procedure and test reports s+all confor$ -it+ t+e re#uire$ents of AS 21'4, and t-o copies of a report
s+o-ing t+e $easured field para$eters and t+e results of anal!sis to deter$ine pile capacit! s+all 1e pro.ided to
t+e Superintendent.
(+e $easured ulti$ate capacit! of test piles s+all 1e e#ual to or greater t+an t+e pile test load specified in t+e
Contract Specific "e#uire$ents or on t+e 2ra-ings.
6.( Tet Reu-t
Su1$ission of t+e test results s+all constitute a &OL' POINT.
2. &OL' POINTS
(+e follo-ing is a su$$ar! of *old Points: .ide Part 140 ?ualit! S!ste$ "e#uire$ents?, referenced in t+is Part:
CLA#SE
RE/.
&OL' POINT
RESPONSE
TI%E
2 Su1$ission of Procedures 14 -or;ing da!s
4.1 At t+e co$pletion of e9ca.ation 1 +our
6.% Su1$ission of test results follo-ing t+e installation of a group of piles 6 +ours
3. RECOR'S
(+e Contractor s+all pro.ide continuous records for eac+ pile. (+e data recorded s+all include t+e follo-ing:
/a0 2ia$eter, lengt+, location and t!pe of pile and date of 1oring:
/10 Concrete 1atc+ details, properties and slu$p:
/c0 All infor$ation regarding o1structions, dela!s and ot+er interruptions to t+e se#uence of -or;:
/d0 Integrit! testing results: and
/e0 A+ere specified, results of ulti$ate resistance tests.