VOL. No. Page No.

I. FIRED HEATER DATA SHEET I 8


II. CALCULATION SHEET
1 Steel Structure Calculation with Foundation Loading I 17
2 Pressure Part Calculation I 4
3 Tube Support Calculation I 5
III. DRAWINGS
1 Outline Drawings I 4
2 Coil Arrangement Drawings I 4
3 Steel Drawings I 38
4 Standard Drawings I 7
IV. HEATER FABRICATION PROCEDURE
1 Fabrication Procedure for Steel Structure I 8
2 WPS & PQR for steel structure I 19
3 Painting Procedure for Steel Structure I 6
4 Application & Inspection for Refractory Lining I 10
5 Fabrication Procedure for Pressure Parts I 7
6 WPS & PQR for Pressure Parts I 12
7 Welding J oint Map for Pressure Part I 5
8 Dry out Procedure I 8
9 Hot Oil Heater P&ID I 1
10 Specification for Burner I 19
11 Specification of Flame Scanner I 44
12 Specification for Damper Actuator I 62
13 Specification of Tube Skin Thermocouple I 4
14 Specification of O2 Analyzer II 68
15 Specification of BMS Local Panel II 87
16 Specification of Instrument Process Lead Piping and Wiring Connection II 21
17 Specification of Instrument Datasheet II 13
18 Specification for Instrument Loop Diagram II 13
19 Specification of Interlock Logic Diagram II 6
20 Specification of J unction Box on Skid II 6
21 Erection Procedure II 15
22 Piping ISOmetric drawings II 24
I N D E X
1 OF 2
V. TEST PROCEDURE
1 Inspection & Test Procedure for Steel Structure II 8
2 Inspection & Test Procedure for Pressure Parts II 10
3 Hydrotest & Drain Procedure for Pressure Part II 6
4 NDE Plan for Heater II 2
5 PMI Procedure II 7
6 NDE Procedure II 76
7 Heater Operation Manual II 15
VI. GENERAL DOCUMENT
1 Alarm and Set Points II 1
2 Welder List for Steel Structure II 2
3 Welder List for Pressure Part II 2
4 Material Certificates for Pressure Part II 11
5 Material Certificates for Steel Material II 38
VII. JNK AND SUBVENDORS TEST AND QC REPORT AND TYPE CERTIFICATE
1 Welding Report for Pressure Part III 9
2 NDE Record for Pressure Part III 19
3 NDE Record for Steel structure III 7
4 Dimensional Record for Pressure Part III 2
5 Dimensional Record for Steel Structure III 20
6 Hydrostatic Test for Pressure Part III 6
7 Painting Records for Steel Structure III 10
8 Castable Lining Report III 4
9 Inspection Report for Burner III 105
10 Inspection Report for O2 analyzer III 20
11 Inspection Report for Casting Support III 6
12 Inspection Report for Fuel Skid III 186
13 Inspection Report for Damper Actuator III 23
14 Inspection Record for Castable III 6
15 Inspection Record for Panel III 51
VIII. PACKING LIST
1 Packing list for 1st shipment (heater body) III 4
2 Packing list for 2nd shipment (burner) III 2
3 Packing list for 3rd shipment (container) III 6