Вы находитесь на странице: 1из 22

www.hartmann-technologies.

net
Model-based working
2
hartmann technologies GmbH
hartmann technologies GmbH page
Number of colleagues : 22salaried staff
10software engineers
7content developers
3customer support/schooling
2managing directors
For test runs /quality assurance or with
unique developmental tasks colleagues from
the IngenieurgesellschaftHartmannmbH
willbe asked to help (60employees).
Established in2009
History of the modelbased work:
1998bis2005collaboration with NemetschekAG
20052012collaboration with RIBAG
since 2010collaboration with Autodesk
3 hartmann technologies GmbH page
Scopeofservices:
Participationinthedevelopmentofthesoftwareforthemodelbasedwork(RIB)
Developmentofcontentproductsforthemodelbasedwork
DevelopmentofsoftwareforthehandlingwithBIMmodels
DevelopmentofsoftwareforthequantitytakeoffaccordingtogermanVOB/englishSMM7/etc.
Trainingandimplementationofthemodelbasedworkingmethodforthespecificfieldsof
tendering,technicalpreparationofthebuildingsites,implementationplanningand
executionofconstructionwork
Products:
ContentfortheworkwithRIBiTWO
iceBIMconstruction
iceBIMbuildingsite
iceBIMplausibility
iceBIMarchitecture
Managingdirectors:
Mr.Dipl.Ing.Dipl.Kaufm.RolfHartmann
Mr.Dipl.Ing.MarkHeinisch
4
Requirements to the model-based working
Automated quantity takeoff according to SMM7for allthe items of structure and finishings
based onaintelligent3Dmodel
If necessary:detailed working depth for the quantity takeoff,for example bill of quantitys inclusive metalwork,
roofing,facade,doors and windows
Effective workflow through the achievement of greater workingspeedcompared with the classical hand
measurement or halfautomated methods
Integrated,continuous dataflow from the preliminary planning to the practice onthe building site and finally to
the completion of the building
Prefabricated intelligentcontent leads to the easyusage of the technology through guided assistants and
graphical user interfaces
hartmann technologies GmbH page
5 model-based working page
DefinitionBIM:To work with abuilding model with contained data.
Modelbased working BIM
6 model-based working page
7 model-based working page
8 model-based working page
9
Workflow ice BIM architecture
model-based working page
10
ice BIM architecture.
Claimmanagement for all
crafts of structure and
finishings
Ability to filter and the base for the
plausibility check
Bidirectional connection
between BOQand model
Visualisation e.g.for
meetings,
subcontractors etc.
Creation of craft plans for
structure and finishings
Creation of craft plans for structure and
finishings
Accounting /progress report
for allcrafts of structure and
finishings
Cost control for allcrafts of
structure and finishings
respective data
ice BIM architecture page
Complete BOQwith accessibility to
other calculation software
Calculation of quantities for allstructural
and finishings crafts,technical building
equipment,facade and structural
engineering
Bidirectional connection
between structural and
finishing crafts and model
adaptive,intelligentand
menuguided content
11
Bidirectional connection
between BOQand model
Claimmanagement
for single crafts
Filters
Visualisation e.g.for
meetings,
subcontractors etc.
Accounting /progress report
for single crafts
Cost control for single
crafts respective data
Creation of craft plans for
structure and finishings
Generalproject
information
ice BIM buildingsite.
ice BIM buildingsite page
12
Detection of wrong
3Dmodels
Assured quantity takeoff
Automated calculation of
characteristics,like cubic footage,
gross floor area,
net floor ratio etc.
Integratedviewer to show
determined errors
ice BIM plausibility.
Ice BIM plausibility page
13 model-based working page
14
building project: central station Erfurt
3-D models page
15
building project: central station Erfurt
3-D models page
16
building project : office building Rttenscheider Tor Essen
3-D models page
17
building project : hotel- and commercial house
3-D models page
18
building project : Le flair construction site 6
3-D models page
19
building project : Le Flair construction site 7
3-D models page
20
building project : Marie-Elisabeth-Lders-house
3-D models page
21
building project : Baltic Sea hotel (in development)
3-D models page
22
building project : Residential complex Roggenstein
3-D models page

Вам также может понравиться