Вы находитесь на странице: 1из 1

!

I
I
I
J
I;
\ .
\ .
r
I.
TE NDE R NO. 88H12012
NE W S E R VIC E S BLOC K AND AS S OC IATE D_ WOR K S F OR P OWE R /C OOLING
UP G R ADATION AT C ATV BUILDING - TAS S HAR J AH .
4.21.0 F UE L S YS TE M C ONTR OL
4.21.1 The panel shall be capable of r unning a 240.volt, 1 phase, 50 Hz dr iven fuel
tr ansfer pump of up to 1.0 'r<W capacity Wi th dir ect on line star ting. The
oper ation will be by way of the fuel tank float switches, which will oper ate a
r elay and associated contactor mounted inside the panel with suitably r ated
over load pr otection. The design shall Incor por ate a 3 way switch with
on/off/test positions for contr ol of the pump. The test position shall also
enable the pump to be oper ated manually.
4.21.2 P r ovision shall be made in the panel to r eceive a low fuel level indication
fr om the ser vice fuel tank float switch. This facility shall include a r elay which
In tum shall oper ate an Indicating lamp (r ed) on the fr ont panel.
4.21.3 The panel shall also be capable of r eceiving a tank empty indication (10%)
fr om the separ ate switch in the same ser vice fuel tank, which in tum shall
oper ate a r elay to initiate shutdown of the gener ating set thus pr eventing loss
of the engine fuel pr iming system.
4.21.4 The contr ol cir cuits shall be designed so that on oper ation of the low level
alar m switch (40%), the AC power supply to the fuel tr ansfer pump shall be
disconnected to pr event the pump r unning in a dr y condition for an
unnecessar y per iod.
4.21.5 The time r equir ed for the electr ic pump to fill the tank between the 60% and
90% levels shall be car efully calculated and a suitable timer (adjustable) shall
be pr ovided to cut off the fuel pump after this time plus appr ox. 20% has
elapsed (i.e. if filling should take 5 mins. the timer will oper ate after 6mins.)
This pr ovision is to pr event excessive over flowing should the 90% switch fail
to oper ate.
4.21.6 The connection of the contr ol cable to the float switches shall be via suitable
plug in type adaptor to allow quick r eplacement I maintenance of the float
switch.
4.22.0 AC ME TE R ING
4.22.1 Meter ing shall be pr ovided to monitor the voltage and also fr equency of the
gener ator output by way of selector switches. It shall be possible to monitor
both 'line-to-line' and '!ine-to-neutr al' voltages on all tJ ir ee phases separ ately.
4.22.2 Meter ing shall also be pr ovided by way of a single ammeter with selector
switch to monitor the load on the output bus-bar s.
4.22.3 F ollowing meter s I pr otection shall be par t of the genset contr ol panel.
E ar th fault r elay for each genset.
R ever se power r elay for genset.
\\F S 01-ho-ho1.22\od\S har ed P 0\I.AN\2012'B8H2012'1TE NDE R NO 88H.2012_ B_ E LE C S P E C S .docx

Вам также может понравиться